Investor Presentation - Gold Coast Investment Showcase
Released
Released
Announcement PDF
PROGRESSING TO PRODUCTION
VAN UDEN GOLD PROJECT
Western Australia
Gold Coast Investment Showcase - June 2025
ASX:TG6
DISCLAIMER
This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or
financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been
prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. No
representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of TG Metals Limited, its
directors, employees or agents, not any other person accepts any liability, including, without limitation, any liability arising out of fault
of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or
warranty, express or implied is given as the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any
forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts,
prospects or returns are by their nature subject to significant uncertainties and contingencies. No representation is made that, in
relation to the tenements the subject of this presentation, TG Metals has now or will at any time in the future develop further
resources or reserves within the meaning of the Australian Code for Reporting of Exploration Results, Mineral resources and Ore
Reserves (The JORC Code).
Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an
investment is appropriate in light of your particular investment needs, objectives and financial circumstances. You should have
consideration to the risks involved in investment in TG Metals Limited. By accepting this presentation, the recipient represents and
warrants that it is a person to whom this presentation may be delivered or distributed without a violation of the laws of any
jurisdiction.
This presentation is not to be disclosed to any other person or used for any other purpose and any other person who receives this
presentation should not rely or act upon it. Information contained in this presentation is confidential information and the property of
TG Metals Limited. It is made available strictly for the purposes referred to above. The presentation and any further confidential
information made available to any recipient must be held in complete confidence and documents containing such information may not
be reproduced, used or disclosed with the prior written consent of TG Metals Limited.
The material contained in this presentation does not constitute or contain an offer or invitation to subscribe for or purchase any
securities in TG Metals nor does it constitute an inducement to make an offer or invitation with respect to those securities. No
agreement to subscribe for or purchase securities in TG Metals will be entered into on the basis of this presentation.
COMPETENT PERSONS STATEMENT
The information in this presentation that relates to the Mineral Resource Estimate Report has been compiled by Mr Matthew Karl. Mr
Karl is an employee of Mining Plus Pty Ltd and has acted as an independent consultant on the report titled “MP13744 TG Metals Ltd –
Van Uden - JORC Mineral Resource Estimate Report – May 2025”. Mr Karl is a Member of the Australian Institute of Mining and
Metallurgy (AusIMM) and Australian Institute of Geoscientists (AIG) and has sufficient experience with the style of mineralisation,
deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Karl consents to
the inclusion in this presentation of the contained technical information relating the Mineral Resource Estimation in the form and
context in which it appears.
Information in this presentation that relates to exploration results, exploration targets, geology, drilling and mineralisation is based on
information compiled by Mr David Selfe who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient
experience that is relevant to the style of mineralization and type of deposit under consideration and to the activities that he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Selfe has consented to the inclusion in this presentation of matters based on their
information in the form and context in which it appears. Mr Selfe considers that the information in this presentation is an accurate
representation of the available data and studies for the Van Uden Gold Project.
FORWARD LOOKING STATEMENT
This presentation contains certain statements that may constitute “forward looking statement”. Such statements
are only predictions and are subject to inherent risks and uncertainties, which could cause actual values, results,
performance achievements to differ materially from those expressed, implied or projected in any forward looking
statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-looking
statements. These statements include, but are not limited to statements regarding future production, resources or
reserves and exploration results. All such statements are subject to certain risks and uncertainties, many of which
are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ
materially from those expressed in, or implied or projected by, the forward-looking information and statements.
These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results,
the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to
possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development
activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or
delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi)
other risks and uncertainties related to the Company’s prospects, properties and business strategy. Our audience
is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and we do not undertake any obligation to revise and disseminate forward-looking statements to reflect
events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included in this
ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions and technical
parameters underpinning the exploration results in this release continue to apply and have not materially changed.
CAUTIONARY STATEMENT – VISUAL ESTIMATES
This presentation contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
2
REVIVING FORRESTANIA’S GOLD LEGACY
Van Uden Gold Project – 80% interest in granted mining leases &
exploration licences. Remaining 20% held by regional gold producer
Updated MRE to JORC 2012 Compliance – 227Koz Au with upside
Previous Operating Mines – Tenure includes previous operating
mines, with proven gold endowment, in an established mining region
Strategic Location with Existing Infrastructure – Access to essential
infrastructure (power/water), skilled workforce and sealed road
access to nearby gold processing facilities
Near-Term Cash Flow Potential – Existing stockpiles drilled for near
term production potential in a time of record gold prices
Upcoming Catalysts – Economic assessment of stockpiles, securing
Toll treatment agreement, assessing in-pit ore access
3
CORPORATE OVERVIEW
Shareholder Composition
Capital Structure
Shares on Issue
80.6M
Unlisted Options*
5.0M
Cash & Receivables1
$2.0M
1
at 1 May 2025
Market Cap2
$10.0M
2
at $0.12.5 share price
Top 50 Shareholders
64.93%
Directors & Management
8.99%
Montague Resources Australia
7.09%
Founders
20.45%
3m Director & Management options: 24 May 2027
Performance Rights** *expiry,
$0.30 exercise
1.7M
* 2.0m Broker options: 9 Feb 2027 expiry, $1.125
exercise
** VWAP based incentive milestones vested
12 Month Share Price Performance
Directors & Management
Mr Richard Bevan
Non Executive Chairman
Mr David Selfe
Chief Executive Officer
Mr Brett Smith
Non Executive Director
Ms Nicki Farley
Company Secretary
Ms Gloria Zhang
Non Executive Director
4
VAN UDEN GOLD PROJECT – SIZE AND ROOM TO GROW
New MRE – 6.35Mt @ 1.1 g/t
Au for 227Koz Au – ASX Release 5 June
2025
Mineral Resource Estimate for the Van Uden Gold Deposit - May 2025
Indicated
Inferred
Total
Grade
Grade
Grade
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz)
Tonnes
Laterite
234,000
0.9
6,940
525,000
0.7
11,800
759,000
0.7
18,740
Oxide
867,000
1.2
34,200 1,141,000
1.0
38,200 2,008,000
1.0
72,400
Transitional
291,000
1.1
10,700
770,000
1.1
26,500 1,061,000
1.1
37,200
Fresh
318,000
1.6
16,500 2,207,000
1.2
82,300 2,525,000
1.2
98,800
Total
1,710,000
1.2
68,340 4,643,000
1.2 158,800 6,353,000
1.1 227,140
Material
Notes to Resource Table:
The MRE is estimated with all available drilling data as at 30
May 2025 and reported at a 0.35g/t Au cutoff.
The MRE is reported in accordance with the JORC Code 2012
Edition
Rounding may lead to minor apparent discrepancies
Van Uden deposit defined over
2.5km strike length on the
mafic and sediments contact
Upside – More strike length to
explore and grow beyond
historical drilling
CAPITALISING ON A GROWTH ASSET
5
VAN UDEN GOLD PROJECT – A HIGH-GRADE ASSET WITH STRONG UPSIDE
High-Grade Open Pit Gold Asset – New MRE
constrained by A$5000/oz pit shell. High grade
zones well defined. Historic open pit production
at >2.5g/t Au
Exploration Upside – Historic drilling only to
150m, providing exploration upside down dip
and along +2.5km strike
Walk up drill ready targets - provide further
strong potential for resource expansion
Open Down Dip – pit shell takes in all +1g/t Au
ore supported by drilling, drill deeper – expand
the high grade
LONGEST STRIKE CONTINOUS DEPOSIT IN PROVEN MINING REGION
6
VAN UDEN PROJECT OVERVIEW
Strategic Location – Situated in Forrestania Greenstone
Belt, in proximity to TG6's Lake Johnston Project (Li)
Proximity to Processing Facilities – Trucking distance on
sealed roads to Marvel Loch, Edna May and Coolgardie
gold processing Plants
Established Infrastructure – including access to
essential utilities (power/water)
Secure Tenure – Four granted mining leases, plus five
exploration licenses and miscellaneous haul road
licences
Large-Scale Gold System – +2.5km drilled strike with
gold near surface and two historic pits, defined deposits
and walk up drill targets
Near Processing Infrastructure
7
VAN UDEN PROJECT – TASMAN OPEN PIT
HIGH GRADE AT SHALLOW DEPTHS
Previous small-scale mining to less than 30m depth produced 136,023t @ 2.54g/t Au for 11,142oz Au*
Mineralisation within pit floors (pit depth approx. 30m) and extending down dip and open
IMMEDIATE FOCUS
New resource model provides
basis for new pit designs and
scheduling scenarios
Ultimate pit still shallow at
148m depth max
Remnant surface stockpiles
drilled and undergoing
metallurgical and grade
assessment for near term toll
treatment
*Refer to TG6 ASX Announcement dated 6 March 2025
Cross Section through Tasman Pit, Van Uden Group deposit
8
VAN UDEN PROJECT – DIEMAN OPEN PIT
HIGH GRADE AT SHALLOW DEPTHS
Previous small-scale mining, for a dump leach trial 1990
Mineralisation within pit floors (pit depth less than 30m) and extending down dip and open
NEAR-TERM POTENTIAL
Evaluate extensive
near-surface laterite
mineralisation. 759Kt
for 18,740oz Au.*
Potential alternate
treatment route
Remnant surface
stockpiles drilled and
under metallurgical
assessment for toll
treatment
*Refer to TG6 ASX Announcement dated 5 June 2025
Cross Section through Diemans Pit
9
PITS AND STOCKPILES
Dieman Pit – 2
leach pads oxide
and laterite
Tasman Pit – 2
stockpiles,
separated into
rock types,
sedimentary and
mafic
Easy access in for
transport out.
SMALL SCALE MINING PROPOSAL IN PROGRESS
10
GOLD CITY PROSPECT
Previous small scale mining – no historic production records
Multiple gold lodes defined by drilling
Opportunity for additional drilling to define initial resource – open at depth and along strike
Potential for value adding incremental discoveries
OPEN DOWN
DIP, AND
ALONG
STRIKE
Contains 1950’s workings along known gold trends
11
VALUE PROPOSITION
- STRATEGIC ADDITION AND SYNERGIES
Dual Commodity Strength – Diversifies risk through gold & lithium exposure, maximising
market opportunities
Strategic Expansion – Van Uden Gold adds a second high-value asset alongside Lake
Johnston Lithium
Fast-Track Potential – Granted mining leases, established haul roads, surface stockpiles
and nearby gold Plants provide near-term production potential
Exploration Upside – Gold system open along strike and down dip with strong growth
potential and secondary deposit opportunities
Regional Synergies – Located 100km from Lake Johnston, providing the ability to leverage
logistics, personnel and infrastructure
Market Advantage – Gold at record highs, positioning the project for immediate value
creation for TG6 shareholders
12
NEXT STEPS
2012 JORC Compliant
Resource
Exploration
Plans
Near-Term
Production
• Resource Estimation – Completed
• Bulk Density Test Work – Completed
for MRE
• Independent Assessment – MRE
completed by MiningPlus Consultants
verified by 3rd party (BMGS)
• Model Interrogation – Underway by
Mining Engineering consultants
• Sample & Assess Historic Surface
Stockpiles – Drilling Completed,
samples at laboratory
• Priority Drill Targets – Focus on highgrade extensions at Van Uden Group &
Gold City
• Drilling Campaigns – Planning and
approvals for RC, diamond drilling to
confirm continuity, depth extensions
• Stockpile Evaluation – Assess scale
(surveying completed), grade (assay),
and recoverability (Metallurgy) of
remnant material for economic
production
• Permitting Approvals – Secure
necessary regulatory approvals, SMP
Submitted
• Production Pathway – Commenced
discussions with Toll milling providers
13
ASX:TG6 | tgmetals.com.au
THANK YOU
FOR MORE INFORMATION
David Selfe – CEO
Email: dselfe@tgmetals.com.au
Richard Bevan - Chairperson
Email: rbevan@tgmetals.com.au
Share your feedback
Discover