Quarterly Activities Report and Appendix 5B
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 24 OCTOBER 2024
Quarterly Activities Report
for the period ended 30 September 2024
HIGHLIGHTS
■ Jaegermeister pegmatite discovery has potential to substantially increase the
lithium endowment at the Lake Johnston Project
■ Burmeister drilling continues to deliver high grade lithium intercepts
■ Metallurgical tests produce high-value concentrate of up to 6.31% Li2O
■ Cash at bank of $6.2m at 30 September 2024
LAKE JOHNSTON PROJECT EXPLORATION
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 30 September 2024 (Quarter), during which the Company continued to advance the
exploration and development of its 100% owned multi commodity Lake Johnston Project in WA, Figure
1.
Activities for the Quarter included the drilling of 46 RC drillholes for 7,996 metres, which resulted in the
discovery of high-grade lithium pegmatites at the Jaegermeister prospect and further high grade drill
results from infill drilling at Burmeister lithium deposit. Subsequent to the quarter end, first Metallurgical
results for the Burmeister deposit mineralization were reported. Highlights include:
•
•
Jaegermeister maiden drill program produced high grade lithium pegmatite intercepts
including:
o
10.0m @ 1.19% Li2O from 73.0m
o
6.0m @ 1.38% Li2O from 76.0m
o
3.0m @1.22% Li2O from 49.0m and 3.0m @ 1.24% Li2O from 63.0m in the same hole
Burmeister infill drilling produced further high grade lithium pegmatite intercepts including:
o
8.0m @ 1.92% Li2O from 106.0m
o
9.0m @ 1.38% Li2O from 117.0m
o
9.0m @ 1.44% Li2O from 164.0m and 14.0m @ 1.55% Li2O from 240.0m in the same
hole
•
Metallurgical testwork on diamond drill core from the Burmeister deposit producing up to 6.31%
Li2O, SC6 (+6.0 Li2O%) spodumene concentrate from DMS (dense media separation) only.
•
The Company’s cash position remains strong and is on target to achieve its exploration goals
for 2024.
Figure 2 shows the area of exploration activity this Quarter, with drilling collars completed and
Seismic Survey lines completed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
1
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 1 – Simplified Geology with deposit and prospect locations and the main area of exploration focus
at Burmeister and Jaegermeister. Datum: Zone 51 (GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 2 – Completed drilling program including Jaegermeister and Burmeister RC drillholes. Datum:
Zone 51 (GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Jaegermeister Lithium Prospect
During the Quarter, the Company released the maiden drilling results on the Jaegermeister prospect
which produced high grade lithium in pegmatites (ASX announcement 9 August 2024).
19 RC drill holes were completed for a total of 3,472m. Multiple intersections of spodumene pegmatites
with high Li2O grades were encountered with widths up to 10 metres. Figure 3 below shows a cross
section through the new drilling at Jaegermeister.
Figure 3 – Jaegermeister drilling cross section E-E’ – see Figure 4 for location of drilling and section lines
The mineralisation remains open in all directions at Jaegermeister and there is an interpreted thickening
of the pegmatites to the West. Figure 4 shows the drilling and significant intercepts in plan view with
the location of cross section E-E’ and long section F-F’ (Seismic Survey).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 4 – Jaegermeister lithium pegmatite RC drilling showing significant intercepts. Datum: AMG Zone
51 (GDA94)
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Siesmic Survey Results
Seismic field data was acquired for two traverse lines over the Burmeister and Jaegermeister trends.
Preliminary interpretations of the results are being updated as new drill data is generated. On the
Jaegermeister trend the seismic survey successfully detected the pegmatites at identified by the most
recent drilling program (Figure 5).
The Seismic section (Figure 5) shows reflective surfaces and potentially pegmatites continuing to
depths beyond 800m below surface. Pegmatite thicknesses cannot be determined from the seismic
data, only one surface of the pegmatite can be detected. Whilst drilling is required to determine
thickness and grade of the pegmatites, seismic has proven useful for predicting continuity of pegmatites
and other adjacent targets. Multiple possible pegmatite horizons identified by the seismic survey have
yet to be drill tested.
Figure 5 – Seismic long section F-F’ through Target A at Jaegermeister, showing interpreted reflection surfaces
analogous to pegmatite intrusives.
Burmeister Lithium Deposit Drilling
During the Quarter, the Company conducted infill and extensional RC drilling on the Burmeister lithium
deposit consisting of 27 drillholes for a total of 4,524m (ASX announcement 6 September 2024). Figure
6 shows a plan view of the significant intercepts achieved in this round of drilling. Multiple intersections
of spodumene bearing pegmatites with high Li2O grades and widths up to 14 metres were confirmed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 6 – Burmeister lithium pegmatite RC drilling showing lithium pegmatite intercepts. Datum: AMG Zone 51
(GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
7
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Burmeister Lithium Deposit Drilling - Continued
This RC drill program infilled previous drilling on the Burmeister deposit (Figure 6) and tested
extensional features.
As part of the infill drilling program, the eastern side of Burmeister was drill tested into the
mafic/ultramafic contact. Consequently, the ultramafic unit appears to inhibit pegmatite mineralisation
on the eastern side of Burmeister. This has aided in defining the eastern boundary of the system and
further infill drilling will be extended to the West which is not bound by that lithology barrier. Infill drilling
was not completed in the southern part of Burmeister in this round as winter rains and wet surface
ground conditions were not conducive to truck mounted drill rigs and the size of the program was not
suitable for track mounted rigs. It was also discovered that there is active groundwater recharge as a
result of these seasonal rains, which has limited the depth of drilling in some holes encountering
excessive groundwater earlier than anticipated. Where full depth was not reached by this RC drilling,
RC re-entry or diamond core tails will be required in a future campaign.
Pegmatites were generally intersected where they were planned which demonstrates the consistency
and continuity of the Burmeister pegmatites. Figure 7 also shows the depth potential which was tested
with drillhole TGRC1024. This drillhole intersected 4 pegmatites, all lithium mineralised, with the
deepest interval extending high grade below the previously generated (May 2024) conceptual pit shell
(for SC6 = USD1500/tonne).
Figure 7 –Cross section G-G’ showing lithium pegmatite intercepts in drillholes at Burmeister. The conceptual pit
outline is based on previous drilling, received up until 1 May 2024.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
8
SEPTEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Metallurgical Testwork
Subsequent to the Quarter, the Company announced on 16 October 2024 the first results of
metallurgical testwork on diamond drill core acquired during the drilling campaigns on the Burmeister
deposit. The Company engaged Independent Metallurgical Operations Pty Ltd (IMO) based in Western
Australia, to assist in the development and support of sighter metallurgical testwork This initial sighter
testwork was progressed at Metallurgy Pty Ltd an accredited commercial laboratory located in Perth
WA. The results and testwork program were also overseen by an independent consultant Michael
Rodriguez. The research and development testwork program was developed to determine the
response to commercially demonstrated hard rock lithium processing methods available for the
production of spodumene concentrate, including ore sorting, HLS/DMS (Heavy Liquid / Dense Media
Separation) and flotation with the use of magnetic separation technology for the rejection of iron and
gangue. To date the requirement to apply a mica rejection circuit has not been necessary due to the
lack of micas observed within the composite samples prepared from drilled core.
The initial HLS testwork results with the application of dry magnetic separation technology applied,
produced quality concentrate with a lithia grade ranging from 5.34% Li2O to 6.31% Li2O from 3 drill
core representative composite samples recovered from the Company’s Burmeister deposit. Table 1
below summarises the magnetic separation results.
Table 1 – Summary HLS concentrate results post magnetic separation
Product
Blended Sample 1
Blended Sample 2
Blended Sample 3
Non-Magnetic
Concentrate
Non-Magnetic
Concentrate
Non-Magnetic
Concentrate
Mass Rec
%
Li2O %
79.7
5.85
89
1.37
52
87.1
6.31
94
0.98
56
79.9
5.34
95
1.79
50
Lithia Rec Fe Grade
%
%
Fe Rec %
*Lithia recovery in Table 1 above is based on the magnetic separator feed
These initial results support the potential to achieve a SC6 (6.0% Li2O spodumene concentrate)
concentrate utilising HLS processing technology. Further metallurgical testing involving flotation
technology will be conducted as the results are produced for determination of an initial processing
flowsheet and concentrate specifications.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
9
ASX ANNOUNCEMENT
SEPTEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
Nickel Exploration
During the Quarter, no exploration was undertaken for nickel.
BUSINESS DEVELOPMENT
During the Quarter, the Company applied for 4 single block exploration licences in the vicinity of the
Maggie Hays nickel operations. The applications are strategic near known occurrences of pegmatites
and nickel mineralisation.
The Company continuously assesses opportunities to grow and consolidate tenement positions as they
arise.
CORPORATE
TG Metals closed the Quarter with approximately A$6.2 million in cash. The Company’s quarterly
summary of financials is presented in the Appendix 5B attached.
The Company has 71,107,540 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $1,544,000 on exploration activities,
associated predominantly with activities undertaken on the Lake Johnston Project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $57,000 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe
Chief Executive Officer
TG Metals
info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulos
Resolve IR
evy@resolveir.com
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
10
ASX ANNOUNCEMENT
SEPTEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
About TG Metals
TG Metals is an ASX listed company focused on exploring for lithium, nickel and gold at its wholly
owned Lake Johnston Project (Figure 8) in the stable jurisdiction of Western Australia. The Lake
Johnston Project boasts proximity to current and past producing nickel and lithium mines, processing
plants and geochemical and geophysical targets for immediate exploration.
Figure 8 – Lake Johnston Project Location. Simplified Geology with prospect locations Datum: Zone 51
(GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
11
ASX ANNOUNCEMENT
SEPTEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activities
that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Selfe has consented to the inclusion in this presentation of matters based on their information in the
form and context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, and performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
12
ASX ANNOUNCEMENT
SEPTEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
Tenement Schedule as at 30 September 2024
Tenement
Area
Grant Date
Expiry Date
E63/1960
6 BL
05/11/2019
04/11/2024
E63/1961
29 BL
05/11/2019
04/11/2024
E63/1973
26 BL
16/01/2020
15/01/2025
E63/1983
7 BL
21/02/2020
20/02/2025
E63/1984
5 BL
04/08/2020
03/08/2025
E63/1997
37 BL
27/10/2020
26/10/2025
E63/2254
8 BL
20/07/2023
19/07/2028
E63/2315*
43 BL
Pending
N/A
E63/2324*
9 BL
Pending
N/A
E63/2349
20BL
02/02/2024
01/02/2029
E63/2433*
2 BL
Pending
N/A
E63/2434*
6 BL
Pending
N/A
E63/2488*
1BL
Pending
N/A
E63/2489*
1BL
Pending
N/A
E63/2490*
1BL
Pending
N/A
E63/2491*
1BL
Pending
N/A
P63/2201
176.52 HA
03/11/2020
02/11/2024
P63/2202
193.69 HA
16/01/2020
02/11/2024
Entity’s
Interest at
Quarter
End
Change in
Entity’s
interest
during
Quarter
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
100%
100%
100%
100%
100%
100%
100%
100%
No change
100%
No change
Exploration
Licences
Prospecting
Licences
*Tenement Application
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
13
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN
Quarter ended (“current quarter”)
40 644 621 830
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (3
months)
$A’000
-
-
(4)
(4)
(b) development
-
-
(c) production
-
-
(d) staff costs
(239)
(239)
(e) administration and corporate costs
(198)
(198)
-
-
115
115
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Paid)
-
-
1.9
Net cash from / (used in) operating
activities
(326)
(326)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(8)
(8)
(1,550)
(1,550)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(1,558)
(1,558)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other – Lease payments
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (3
months)
$A’000
4.1
Cash and cash equivalents at beginning of
period
8,048
8,048
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(326)
(326)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,558)
(1,558)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (3
months)
$A’000
-
-
6,164
6,164
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,038
2,033
5.2
Call deposits
5,126
6,015
5.3
Bank overdrafts
-
-
5.4
Other – Term Deposits
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6,164
8,048
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,550)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,876)
8.4
Cash and cash equivalents at quarter end (item 4.6)
6,164
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
6,164
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.29
-
$A’000
(326)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
24 October 2024
Authorised by: .........By the Board..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover