Highlights
■ Acquisition of 80% of the Van Uden Gold Project
■ 4 granted mining leases with historical production from two shallow
open pits
■ Significant expansion upside with shallow mineralisation open down dip
■ Mineral Resource Estimate (MRE) to be completed on historical drilling
■ Potential near term cash flow opportunity from existing stockpiles
■ Proximal to toll treatment facilities
■ Acquisition to be funded from existing cash reserves
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to advise it has
executed a Sale and Purchase Agreement (SPA) to acquire 80% of the Van Uden Gold
Project (Van Uden Gold or the Project) in WA from Montague Resources Australia Pty Ltd
(Montague). Barto Gold Pty Ltd (Barto) retains 20% equity interest in the Project.
The Project is located on the Forrestania Greenstone Belt, 90km east-northeast of Hyden and
120km south of Southern Cross. It is close to the Marvel Loch (producing) and Westonia Edna May (Care & Maintenance) gold processing Plants and is 130km from the Company’s
established Burmeister lithium deposit at the Lake Johnston Project.
The transaction will be satisfied by an upfront cash payment of A$2.5 million and the issue of
5,714,285 fully paid ordinary shares in TG Metals (Shares), being Shares to the value of A$1
million at a deemed issue price of $0.175 per share, a 67% premium to the closing price on
28 February 2025. The consideration shares are subject to a voluntary 12 month escrow
period. An additional deferred cash payment of A$0.5 million will be paid on the earlier of 12
months after completion of the acquisition or on the Company completing an equity raising of
at least A$1 million. No shareholder approval is required for the transaction, and the cash
consideration for the acquisition will be funded from existing cash reserves.
TG Metals CEO, Mr. David Selfe stated;
“This strategic acquisition provides TG Metals with an advanced gold project with
opportunities for near term cash flow, at a time of record prices for gold.
It is located very near to our existing Lake Johnston lithium deposits, which allows
opportunities for operational synergies for both of TG’s projects. The Van Uden Gold Project
has historically only been subject to shallow drilling, providing enormous exploration upside
through testing the known mineralisation down dip along its entire plus 2,000m strike length.
There are several near-term high priority opportunities, including defining a JORC 2012
mineral resource estimate from the extensive historical database, and assessing the viability
of existing ore stockpiles for toll treatment.”
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Project Overview
Van Uden Gold consists of four granted mining leases, three granted exploration licences and
two miscellaneous licences (for haul roads). The Project lies to the west of the Mt Holland
lithium mine, south of the operating Marvel Loch gold Plant, and southeast of the Edna May
gold Plant.
Figure 1 – Location Map showing TG Metals’ Van Uden Gold Project (red) and Lake Johnston Lithium projects (blue)
There are two main areas of gold mineralisation in the acquisition tenement package, Van
Uden Group and Gold City. Past exploration drilling by ASX listed Convergent Minerals
Limited (Convergent) (ASX:CVG) and Kidman Resources Limited (Kidman) (ASX: KDR)
defined extensive mineralisation at Van Uden and shallow mineralisation at Gold City.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Figure 2 – Location Map Van Uden Gold Project tenements
Convergent published a JORC 2004 compliant MRE for the Van Uden Group (ASX:CVG 1
March 2013) and conducted preliminary mining studies (ASX:CVG Quarterly Activities 31 July
2013). Under the ownership of Kidman very little progress was made on the Project as the
focus shifted to the Mt Holland lithium deposit. Since 2020, Montague has completed drilling
and sampling within the Project. These activities, which have not previously been reported,
are include in the Appendix 1 and 2 and are currently under review by TG Metals.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
On 1 March 2013 a MRE was completed by Montague (refer to ASX:CVG announcement 1
March 2013) within the transition period from JORC 2004 to JORC 2012 compliance. The
MRE was reported under the JORC 2004 guidelines and hence is considered a historical
MRE. It is a high priority for the Company to complete a new JORC 2012 compliant MRE. The
historical resource is reported as the following and is depicted in Figure 3:
Category
Tonnes
(Mt)
Grade
(g/t)
Contained Metal
(koz Au)
Measured
0.326
1.7
18.0
Indicated
1.601
1.5
78.0
Inferred
3.451
1.28
142.0
Total
5.378
1.38
238.0
Note: MRE reported at a 0.5g/t Au cutoff
The MRE are historical and are not reported in accordance with the JORC Code 2012. A
competent person has not done sufficient work to classify the historical estimate as mineral
resources in accordance with the JORC Code 2012 and it is uncertain that following evaluation
and/or further exploration work that the historical estimates will be able to be reported as a
MRE in accordance with the JORC Code 2012. Nothing has come to the attention of TG
Metals that is cause to question the accuracy or reliability of the MRE completed by Montague
however TG Metals has not independently validated the MRE and therefore is not to be
regarded as reporting, adopting or endorsing this MRE.
TG Metals considers the MRE to be a reliable estimate under JORC 2004 based on the large
historical drilling database, the resource modelling technique being appropriate, specifically
dynamic unfolding for grade interpolation and inverse distance squared grade estimation, field
verification, and geological continuity observations. However, TG Metals recognises that the
MRE is a historic JORC 2004 compliant estimate and does not satisfy the more stringent
requirements for JORC 2012 compliance. In particular, factors affecting the reliability of the
estimate include limited QA/QC data available, a lack of drillhole twinning, quoted bulk density
results, a lack of lab reports and a lack of applicable modifying factors such as mining,
metallurgy and commodity prices. These factors were not required to be reported for JORC
2004 but are required for JORC 2012.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
The historical MRE will form the basis for further confirmatory drilling, extensional drilling and
bulk density analysis to enable a JORC 2012 compliant MRE to be calculated. The historical
resource is based on an extensive drilling database which is tabled in Appendix 1. Additional
drilling undertaken after 2019 and not previously reported to the ASX (also detailed in
Appendix 1) will be used in a proposed update of the MRE to JORC 2012 compliance. The
update will also include the near surface lateritic mineralisation which was excluded from the
2013 MRE. It is the intent of TG Metals to commence confirmatory bulk density testwork and
drilling where necessary as soon as the transaction is completed to support this proposed
update. This will be funded from existing cash reserves.
The Van Uden Group mineralisation remains open down dip with limited drilling below 150m
(Figure 3), presenting an immediate opportunity to expand on the known mineralisation.
Figure 3 – Oblique long section, adapted from ASX:KDR announcement 18 December 2015
Past production from two open pits, Tasman and Diemens, as well as surface gold bearing
laterite, is recorded as 136,023 tonnes at 2.54g/t for 11,142oz gold (WAMEX open file
records). Past mining within the Project was shallow (<40m), with the potential for a more
extensive mining operation at the current record gold metal prices, easily recognisable
(examples provided in Figures 4, 5 and 6). Past mining stockpiles exist in proximity to the
Tasman and Diemens pits. The Company will assess these stockpiles for remnant
mineralisation as a priority for potential near term toll treatment.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Figure 4 – Van Uden Group drilling
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Figure 5 – Cross Section through Tasman Pit, Van Uden Group deposit
Figure 6 – Cross Section through Diemens Pit
The Gold City prospect is located on a single exploration licence, 25km to the south of the
Van Uden Group granted mining leases. There are numerous historical gold workings on the
tenement, as reported by Kidman (ASX:KDR 19 May 2016) during the transition to a lithium
exploration focus. Past historical drilling at Gold City was shallow, less than 120m depth, with
the prospect providing an additional fertile exploration opportunity for TG Metals.
Historical drilling at the Gold City prospect has been concentrated in one small area around
the historical workings as shown in Figure 7. The mineralisation trend along strike remains
largely untested.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
7
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Figure 7 – Drilling extent at Gold City
Included in the Project acquisition are two miscellaneous licences for haul road infrastructure.
These tenements allow for the use and upgrade of a haul road from the Van Uden granted
mining leases to the public access Marvel Loch-Forrestania Road, which has recently been
sealed. This infrastructure provides a ready access route to gold processing facilities at Marvel
Loch and Edna May (Westonia). A power line runs along the northern edge of the Van Uden
Mining Leases. The line currently supplies grid power to the Mt Holland Lithium and Cosmic
Boy mine sites.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
8
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Transaction Terms
TG Metals has entered into a binding SPA with Montague to acquire an 80% operating interest
in the Van Uden Gold Project. The balance of the Project is owned by Barto Gold. TG Metals
will be the manager of the Project and will be responsible for the day-to-day operations.
The acquisition of an 80% operating interest in the Van Uden Gold Project will not constitute
a change in the nature and scale of the Company’s activities as the transaction represents an
increase of less than 25% to the Company’s total consolidated assets, total equity and its
budgeted expenditure for the next 12 months. For this reason, the Company will not seek
shareholder approval for the acquisition.
The key terms of the acquisition pursuant to the SPA are detailed in the Acquisition
Consideration section below.
Transaction Rationale
The acquisition of the Van Uden Gold Project will generate substantial benefits for TG Metals
shareholders, including:
• The acquisition will be accretive to TG Metals existing portfolio, increasing tenement
holdings by nine tenements including four granted Mining Leases.
• The acquisition diversifies the commodity base of TG Metals by adding gold to the already
defined lithium deposits and nickel prospects at the Lake Johnston project.
• The acquisition diversifies operations, adding an area which is easily accessible by nearby
sealed roads and is adjacent to grid power.
• The Van Uden Gold project provides potential near term revenue via toll treatment
opportunities for easily accessible gold mineralisation at or close to surface. Existing roads
are available from the Van Uden Group mining leases to gold processing Plants.
• Walk up drilling targets at Gold City and Van Uden Group down dip and along strike of
previously identified gold mineralisation.
• A rapid pathway to JORC 2012 compliant resources by leveraging off historical drilling and
rapid addition of new drilling to the existing database.
Acquisition Consideration
Cash Component
The upfront A$2.5 million cash consideration payable on completion will be funded from
existing cash reserves.
Equity Component
At completion, Montague is to be issued 5,714,285 Shares at a deemed price of A$0.175 per
share. The shares will be subject to voluntary escrow for 12 months. The Consideration
Shares will be issued under the Company’s existing placement capacity under ASX Listing
Rule 7.1 and accordingly shareholder approval is not required.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
9
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Deferred Component
A$0.5 million is payable to Montague on the earlier of, 12 months from the date of completion
or on the Company completing an equity raising of at least A$1 million. This component will
be held in an escrow account from completion and be funded from existing cash reserves.
Conditions Precedent to Completion
Completion of the Acquisition is subject to the satisfaction of the following conditions
precedent:
1.
Counterparts of Deeds of Assignment and Assumption for third party Royalty Deeds
2.
Ministerial Consent for Transfer of the Tenements under the Mining Act; and
3.
No indication has been given by ASX that it will not quote the 5,714,285 Shares to be
issued to Montague.
Next Steps
The Company and Montague are actively working to fulfil the conditions precedent to the
Acquisition, as detailed above.
The Company’s geology staff are working on revision of the entire database including the
recent drilling conducted since 2020. Drill planning has commenced for the first drilling to be
conducted by the Company on the Project.
The Lake Johnston Project will be advanced in readiness for lithium market improvement.
Advisers
Futura Capital acted as financial adviser to the Company on the transaction, with Steinepreis
Paganin as legal advisers.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
10
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
References
Convergent Minerals Limited., 2013 1 March ASX release
Convergent Minerals Limited., 2013 31 July Quarterly Activities ASX release
Kidman Resources Limited., 2015 18 December ASX release
Kidman Resources Limited., 2016 19 May ASX release
Kidman Resources Limited., 2017 17 February ASX presentation release
Schedule of Acquisition Tenements
Tenement
Acquisition Interest
E77/1361
(80 shares)
E77/1535
(80 shares)
E77/1582
(80 shares)
L77/271
(100 shares)
L77/299
(100 shares)
M77/477
(80 shares)
M77/478
(80 shares)
M77/522
(80 shares)
M77/523
(80 shares)
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned (acquiring) Van Uden Gold Project in the
stable jurisdiction of Western Australia. The Lake Johnston Project, hosts the Burmeister high grade
lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium prospects.
Burmeister is in proximity to four lithium processing plants and undeveloped deposits. The Van Uden
Gold Project contains past producing gold mines and is in proximity to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
11
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 MARCH 2025
________________________________________________________________
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
12
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
•
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
Drilling
techniques
Commentary
•
•
•
•
•
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
1
•
•
The historical drilling programs consisted of Rotary Air Blast (RAB),
Air Core (AC), Reverse Circulation (RC), and Diamond Drilling
(DD).
WAMEX Open File Reports A035288, A059401, A059832,
A061839, A067423, A072918, A079996, A093378, A095101,
A097549, A110467 & A113837 detail the historical data and
sampling techniques.
RC and DD drill samples were collected at 1m intervals, while RAB
were composite sampled at 5m intervals. Resampling at 1m was
initiated if anomalous values were detected in the composite
interval.
Samples were dispatched to ALS laboratories or Yilgarn Assay
Laboratory for Fire Assay (gold) and ICP-MS (multi-element
analysis.
The sampling was considered industry standard for gold
exploration, ensuring representivity. Laboratory check samples
were provided in WAMEX reports.
Drill types:
o RC drilling with face-sampling bits.
o DD drilling with HQ and NQ core.
o RAB drilling with open-hole hammer.
Drill inclinations and depths vary by project area, with inclinations
typically -60° to vertical.
Recovery was logged, particularly for diamond drilling.
RC samples were weighed to ensure consistency.
Criteria
JORC Code explanation
Commentary
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
Some RAB intervals showed sample loss due to weathering
effects.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
•
•
•
All drill holes were geologically logged.
Geotechnical data was recorded where applicable (DD logs)
Logging included alteration, lithology, mineralisation, and structure
(DD logs only)
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
•
•
RC samples were split using a riffle splitter.
DD samples sawn in half, with one half sent for analysis.
Samples dispatched to ALS or Yilgarn Assay Laboratory were split
and pulverized to <75μm prior to analysis.
No record of duplicate sampling in some historical reports.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
•
•
Quality of
assay data
and
laboratory
tests
2
•
•
•
Fire assay detection limit of 0.01 ppm Au.
ALS Laboratory and Yilgarn Assay Laboratory were used for assay
work.
No explicit QA/QC procedures were provided or published in
WAMEX reports.
Field Duplicates, Lab Checks were recorded in reports.
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
•
No dedicated twin holes were recorded.
Independent verification not consistently reported.
Assay data adjustments were not reported.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
•
•
Drill collars were surveyed with DGPS where available.
Local grid systems were converted to MGA Zone 50.
RL data sourced from topographic surveys.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
•
•
Drill spacing varied by project area.
RC drilling was planned and drilled on a 25m x 25m grid for
resource estimation. Infill 12.5m x 25m were drilled as required.
Sample compositing representing 5m interval was applied in the
initial RAB programs.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
•
•
Drilling was oriented perpendicular to mineralsation.
Some drill deviations occurred at the discretion of the supervising
geologist.
Sample
security
• The measures taken to ensure sample security.
•
•
Samples were stored securely before transport to laboratories.
There was no record of tampering or loss.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
•
No formal audits aside from the audits conducted during Resource
Estimation (section 3 of this table)
Internal data reviews performed by project geologists.
Database included 4,829 drillholes, which comprised of:
o 1,321m of DD;
o 50,620m of RC;
o 709m of AC;
o 39,690m of RAB; and
o 3010m of BH “Unspecified Type”
•
•
•
3
Criteria
JORC Code explanation
Commentary
o
A total of 79,197 samples are included in the data.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in th
Share your feedback
Discover