Quarterly Activities Report
for the period ended 30 September 2026
HIGHLIGHTS
• Excellent financial metrics for Van Uden Heap Leach Scoping Study
outline material near term cashflow opportunity
• Addition laterite resource drilling completed provides upside to Heap
leach Study outcomes
• Ore Processing and Profit Share agreement executed, complimentary to
onsite heap leach strategy
• Maiden DSO lithium Resource declared for Burmeister deposit at Lake
Johnson
• Diamond core drilling program completed, providing metallurgical
samples to potential offtake/ funding partners
• Development pathways for both the Van Uden Gold Project and the Lake
Johnston Lithium Project significantly advanced
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 30 September 2026 (Quarter), during which the Company progressed the advanced Van
Uden Gold Project (the Project) in the Forrestania Region of WA and the Lake Johnston Lithium
Project, Figure 1.
Activities for the Quarter included:
• A Scoping Study showing excellent financial metrics for the proposed Van Uden Gold Heap
Leach project were released on 29 September to the ASX. Key outcomes included:
o 250,000tpa heap leach operation over an initial 3 year mine life, recovering
approximately 13,630 oz Au.
o Net Revenue of ~A$83.2 million
o All in Sustaining Cost (AISC) of A$2835/oz
o Pre-tax NPV8 of ~A$26.8 million
o Pre-tax IRR of ~121%
o Pre-production CAPEX of A$14.2 million
o Payback period of ~12 months
• An Ore Processing and Profit Share (OPPS) agreement was executed for the processing of
60,000 tonnes of stockpiled material at Van Uden through the Cosmic Boy processing Plant
converted to gold processing by Medallion Metals Limited (ASX:MM8), this was also reported
as a subsequent event in the June Quarterly.
ASX ANNOUNCEMENT
2
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
• Declaration of a maiden mineral resource estimate (MRE) for the Burmeister Lithium Deposit
comprising 6.7Mt @ 1.18% Li2O using Direct Shipping Ore (DSO) metrics, see Table 2.
• Updating the Exploration Target Statement (see Table 3) for the Lake Johnston Lithium Project,
in addition to the DSO MRE.
Figure 1 – Simplified Geology with deposit and project locations and TG Metals project tenure. Datum: Zone 51 (GDA94).
ASX ANNOUNCEMENT
3
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Van Uden Gold Project
The Company released a Scoping Study (ASX release 29 September 2026) showing that a low-capex
heap-leach operation at Van Uden could provide near-term gold production and cash flow.
The Company proposes a shallow open-pit operation at the Van Uden Gold Project in Western
Australia, processing at-surface gold-bearing laterite through crushing, agglomeration and cyanide
heap leaching. The operation would process about 250,000 tonnes per year. Gold-bearing carbon
would be sent to a third-party stripping facility, with doré refined at the Perth Mint. The project is on
previously disturbed land, with shallow, free-dig material. The low strip ratio of 0.6:1 and strong
leachability are central to the low-risk operating concept.
The current laterite MRE1 is about 1.1 Mt at 0.52 g/t gold for 17,700 oz, with approximately 90% in the
Indicated category. The mine plan processes 766,311 tonnes at an average grade of 0.61 g/t gold over
roughly three years, recovering an estimated 13,630 oz at 90% recovery. The first year targets higher-
grade, lower-strip-ratio material. The production schedule includes 85% Indicated and 15% Inferred
material. The project remains cashflow-positive without the Inferred material.
Using a gold price of US$4,400/oz and an AUD/USD rate of 0.70, the study forecasts net revenue of
A$83.2 million and pre-tax EBITDA/free operating cash flow of about A$48.3 million. Development
capital is estimated at A$14.2 million, including contingency; total life-of-mine capital, sustaining capital
and closure costs are A$15.5 million. Forecast outcomes are a pre-tax NPV8 of A$26.8 million, pre-tax
IRR of 121.7%, and payback approximately 12 months after first production. Forecast AISC is
A$2,835/oz. The estimates are preliminary and have Scoping Study accuracy of approximately +/-35%.
Column-leach tests on laterite composites support the heap-leach approach: two completed 4 m
columns achieved more than 95% estimated gold extraction, while a third 2 m column was still leaching
at 81.3%. The financial model applies a conservative 90% recovery assumption. The forecast leach
cycle is 90-120 days. Three heap-leach cells are planned, with two operating while one is constructed.
Spent residue would be washed and returned to mined-out pits.
Drilling is under way to expand laterite resources near the proposed plant, potentially extending
inventory and mine life. This drilling program is designed from the auger drilling test program conducted
in the June quarter (ASX release 9 July 2026) and shown in Figure 2. A further 1.85 Mt at 1.05 g/t gold,
containing about 62,400 oz of transitional material, is considered prospective for heap leaching, subject
to further metallurgical work. Other upside options include higher heap heights than the assumed 4m,
larger-scale processing, and potential toll milling or ore sales from the primary resource.
The Company is also progressing, environmental surveys, permitting, residue geotechnical testing,
detailed heap-pad design, financing discussions and a Pre-Feasibility Study. Overall, the document
presents a potentially attractive small-scale gold project with strong modeled returns, contingent on
converting study assumptions into resources, approvals, funding and an executable PFS-level design.
1. See Resource Table 1 and ASX announcement 16 April 2026
ASX ANNOUNCEMENT
4
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 2 – Van Uden Laterite, Showing New Auger Drilling Collars, Significant Intercepts and Mineralised Laterite Trends.
ASX ANNOUNCEMENT
5
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
OPPS Agreement
During the Quarter the Company executed a non-binding OPPS agreement with Medallion Metals
Limited (see ASX announcement 22 July 2026) for processing approximately 60,000 tonnes of
stockpiled gold bearing material from Van Uden at the Cosmic Boy Plant which has undergone
conversion to gold processing. Approvals to remove the stockpiles have already been secured, haulage
roads into the Van Uden Project are already established and water for dust suppression is also
established.
The agreement contemplates a profit share structure where Medallion Metals is responsible for loading,
hauling and processing with profits shared equally between the parties. The Company looks forward to
finalising the agreement and scheduling first haulage to the Cosmic Boy Plant.
The OPPS agreement was reported last quarter as a subsequent event.
Gold City Exploration
No substantive work was completed at the Gold City prospect during the Quarter.
Lake Johnston Project
During the Quarter, the Company announced a maiden Inferred Mineral Resource Estimate (MRE) of
6.71 Mt at 1.18% Li2O (ASX Announcement 18 August 2026 and Table 2), providing a high-grade base
for potential direct-shipping-ore development at Lake Johnston. This MRE is focused on material
suitable for Direct Shipping Ore (DSO). DSO refers to spodumene-rich pegmatite of sufficient grade
and quality to support direct export and sale, without the need for on-site beneficiation beyond basic
crushing and screening. Upgrade via ore sorting has been demonstrated should it be required in the
future.
The Resource is reported above a 0.40% Li2O cut-off and constrained within an optimised open-pit
shell, supporting reasonable prospects for eventual economic extraction. The entire estimate is Inferred
under the JORC Code (2012), reflecting current drill spacing and confidence. Mineralisation extends
about 2.5 km along strike, 300–600 m across strike and has been modelled to approximately 280 m
below surface.
In addition, a further 11.0 – 14.5 Mt at 0.9 – 1.2% Li2O has been defined (Table 3), excluding the
Inferred Resource. This is conceptual and requires additional drilling before it can be classified as a
Mineral Resource. Figure 3 shows the maiden MRE and modelled Exploration Target in plan view.
Metallurgical Testwork indicates spodumene-rich, relatively low-impurity material and potential to
produce an approximately 1.5% Li2O product using simple ore sorting. This upgraded feed is then
suitable for downstream DMS/HLS and Flotation concentration Flotation/HLS tests produced 75.5 –
80.2% lithium recovery into concentrates grading 5.28 – 5.74% Li2O.
Infill drilling commenced during the quarter and is intended to convert Exploration Target material to
Inferred Resources and potentially upgrade shallow material to Indicated status whilst providing direct
shipping ore (DSO) sample for potential offtake partners.
Overall, the estimate establishes a sizeable, high-grade initial lithium inventory while the unclassified
pegmatites represent material upside rather than current resources.
ASX ANNOUNCEMENT
6
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 3 – Plan view of interpreted lithium pegmatites with conceptual DSO pit shell
ASX ANNOUNCEMENT
7
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Van Uden Gold Project Resource
Table 1: MRE – Van Uden Gold Deposit
NOTES: The Mineral Resources statement conforms to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
are dry metric tonnes. The laterite portion of the mineralisation has been reported at a cut-off grade of
0.10 g/t Au by area within a A$6,000/oz Au optimised pit shell. All other material types are reported at
a cut-off grade of 0.30 g/t Au by area within a A$6,000/oz Au optimised pit shell based on mining
parameters and operating costs typical for Australian open pit extraction deposits of a similar scale and
geology.
Minor discrepancies may occur due to rounding of appropriate significant figures. The resources comply
with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle in mineral
resource reporting that requires the competent person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
Lake Johnston Burmeister Resource
Class
Li2O
Cutoff Tonnes Li2O Rb Ta Fe MgO
% Millions % ppm ppm % %
Inferred 0.40 6.71 1.18 3,668 104 1.32 1.02
Table 2 – Burmeister MRE August 2026
Notes:
MRE is reported above a Li2O cut-off grade of 0.40% within an optimised pit shell using appropriate
mining and processing costs, recoveries, concentrate payabilities and revenue values.
Mineral Resources are not Mineral Reserves - further detailed economic studies and additional
modifying factors are required.
The MRE was classified following the guidelines presented in JORC Code 2012.
Totals may not add up due to rounding.
ASX ANNOUNCEMENT
8
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Lake Johnston Exploration Target Statement
Tonnes Range
Low
Tonnes Range
High
Li2O Range
Low (%)
Li2O Range
High (%)
11 million 14.5 million 0.90 1.20
Table 3 – Exploration Target Range at 0.4% Li2O cutoff
The Exploration Target quantity and grade is conceptual in nature. There has been insufficient
exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the
estimation of a Mineral Resource. The Exploration Target is based on the Company’s resource
definition drilling undertaken since discovery in October 2023. The current drill hole density for some
areas within the drill defined Burmeister deposit are not considered sufficient to determine a Mineral
Resource.
ASX ANNOUNCEMENT
9
SEPTEMBER 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
BUSINESS DEVELOPMENT
During the Quarter, miscellaneous licence L77/371 at the Van Uden Project was granted and
subsequent to the end of the Quarter, miscellaneous licence L63/100 at the Lake Johnston Project was
granted.
The Company continuously assesses opportunities to grow the business and consolidate tenement
positions as they arise.
CORPORATE
TG Metals closed the Quarter with approximately A$1.523 million in cash.
The Company received an R & D Tax Rebate in the amount of $262,570 during the Quarter.
The Company’s quarterly summary of financials is presented in the Appendix 5B attached.
During the Quarter the Company issued a total of 15,625,000 Placement Shares at $0.16 per share to
raise $2,500,000, before costs. The Placement included 656,250 shares issued to Directors following
shareholder approval pursuant to ASX Listing Rule 10.11 at a general meeting held on the 16
September 2026.
During the Quarter 3,000,000 options were issued to the Lead Manager of the Placement.
The Company currently has 136,155,311 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $1,171,000 on exploration activities,
associated predominantly with activities undertaken on the Van Uden project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $57,000 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe Investor Relations
Chief Executive Officer Evy Litopoulos
TG Metals Resolve IR
info@tgmetals.com.au evy@resolveir.com
ASX ANNOUNCEMENT
SEPTEMBER 2026 QUARTERLY REPORT
_______________________________________________________________
__
10
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in the stable jurisdiction
of Western Australia. The Van Uden Gold Project hosts a JORC 2012 compliant MRE of 7.94 Mt @ 1.1
g/t Au for 270,800 oz (Table 1) on granted mining leases and contains past producing gold mines. The
project is in proximity to operating gold processing Plants. The Lake Johnston Project, hosts a JORC
2012 compliant MRE of 6.71 Mt at 1.18% Li2O at the Burmeister deposit, Jaegermeister lithium
pegmatites and several surrounding lithium prospects. Burmeister is in proximity to four lithium
processing plants and undeveloped deposits and is 241km from the port of Esperance.
Competent Person Statement
The information in this report that relates to Mineral Resources and Exploration Target is based on
information compiled by Mr Lynn Widenbar, a Competent Person who is a Fellow of the Australasian
Institute of Mining and Metallurgy. Mr Widenbar is a full-time employee of Widenbar and Associates
Pty Ltd. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity that is being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Minerals Resources and Ore Reserves’. Mr Widenbar consents to the inclusion in the report of the
matters based on his information in the form and context that the information appears.
Information in this report that relates to exploration results, exploration strategy, geology, drilling and
mineralisation is based on information compiled by Mr David Selfe who is a Fellow of the Australasian
Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activities that he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe has consented to the inclusion
in this presentation of matters based on their information in the form and context in which it appears.
Cautionary Statement
The Company’s activities will be subject to the environmental laws inherent in the mining industry and
in Australia. The Company intends to conduct its activities in an environmentally responsible manner
and in compliance with all applicable laws. However, the Company may be the subject of accidents or
unforeseen circumstances that could subject the Company to extensive liability. The occurrence of any
such environmental incident could delay future production or increase production costs. In addition,
environmental approvals will be required from relevant government or regulatory authorities before
certain activities may be undertaken which are likely to impact the environment, including for land
clearing and ground disturbing activities. Failure or delay in obtaining such approvals will prevent the
Company from undertaking its planned activities. Further, the Company is unable to predict the impact
of additional environmental laws and regulations that may be adopted in the future, including whether
any such laws or regulations would materially increase the Company’s cost of doing business or affect
its operations in any area.
ASX ANNOUNCEMENT
SEPTEMBER 2026 QUARTERLY REPORT
_______________________________________________________________
__
11
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Previously Reported Information
References in this announcement may have been made to certain ASX announcements, including
exploration results, Mineral Resources, Ore Reserves, production targets and forecast financial
information. For full details, refer to said announcement on said date. The Company is not aware of
any new information or data that materially affects this information. Other than as specified in this
announcement and other mentioned announcements, the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market
announcement(s), and in the case of estimates of Mineral Resources, Ore Reserves, production targets
and forecast financial information that all material assumptions and technical parameters underpinning
the estimates in the relevant announcement continue to apply and have not materially changed other
than as it relates to the content of this announcement. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the
original announcement.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
ASX ANNOUNCEMENT
SEPTEMBER 2026 QUARTERLY REPORT
_______________________________________________________________
__
12
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 SEPTEMBER 2026
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Exploration Licences
E63/1961 14 BL 05/11/2019 04/11/2029 100% No change
E63/1973 16 BL 16/01/2020 15/01/2030 100% No change
E63/1997 22 BL 27/10/2020 26/10/2030 100% No change
E63/2324 9 BL 05/12/2025 04/12/2030 100% No change
E63/2349 20BL 02/02/2024 01/02/2029 100% No change
E63/2434* 6 BL Pending N/A 100% No change
E63/2489 1BL 02/05/2025 01/05/2030 100% No change
E63/2490 1BL 02/05/2025 01/05/2030 100% No change
E63/2523 5 BL 27/02/2026 26/02/2031 100% No change
E63/2574* 9 BL Pending N/A 100% 100%
E77/3272 2BL 17/04/2025 16/04/2030 100% No change
E77/1535 10BL 15/03/2011 14/03/2027 80% No change
E77/1582 1BL 01/02/2010 13/01/2028 80% No change
E77/1361 19BL 15/03/2011 14/03/2027 80% No change
Prospecting Licenses
P63/2201 176.52 HA 03/11/2020 02/11/2028 100% No change
P63/2202 193.69 HA 16/01/2020 02/11/2028 100% No change
P77/4701 74.29 HA 27/10/2025 26/10/2029 100% No change
*Tenement Application
@
Subsequent to the end of the quarter
ASX ANNOUNCEMENT
SEPTEMBER 2026 QUARTERLY REPORT
_______________________________________________________________
__
13
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 SEPTEMBER 2026 (Continued)
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Mining Leases
M77/477 620.95 HA 31/08/1990 30/08/2032 80% No change
M77/478 620.3 HA 31/08/1990 30/08/2032 80% No change
M77/522 529.15 HA 11/10/1991 10/10/2033 80% No change
M77/523 449.15 HA 11/10/1991 10/10/2033 80% No change
M63/697* 1933 HA Pending N/A 100% No change
Miscellaneous Licenses
L77/271 12.73 HA 04/07/2018 03/07/2039 100% No change
L77/299 4.53 HA 10/11/2021 09/11/2042 100% No change
L77/371 1.00 HA 22/07/2026 21/07/2047 100% No change
L77/372 4.00 HA 07/07/2026 06/07/2047 100% No change
L63/100@
2425 HA 06/10/2026 05/10/2047 100% 100%
*Tenement Application
@
Subsequent to the end of the quarter
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN Quarter ended (“current quarter”)
40 644 621 830 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1) (1)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (318) (318)
(e) administration and corporate costs (230) (230)
1.3 Dividends received (see note 3) - -
1.4 Interest received 6 6
1.5 Interest and other costs of finance paid (1) (1)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 263 263
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(281) (281)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) exploration & evaluation (1,170) (1,170)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,170) (1,170)
3. Cash flows from financing activities
2,500 2,500
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(154) (154)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – Lease payments (14) (14)
3.10 Net cash from / (used in) financing
activities
2,332 2,332
4. Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (3
months)
$A’000
4.1 Cash and cash equivalents at beginning of
period
642 642
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(281) (281)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,170) (1,170)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,332 2,332
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
1,523 1,523
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1508 627
5.2 Call deposits 15 15
5.3 Bank overdrafts - -
5.4 Other – Term Deposits - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,523 642
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.