Quarterly Activities Report
for the period ended 30 September 2025
HIGHLIGHTS
■ Stockpile testing program completed - including metallurgy
■ Drilling commenced on the Van Uden and Gold City projects
■ High grade laterite confirmed at surface at Van Uden
■ Soil geochemistry at Van Uden extends target strike to 6.5km – includes multiple
new targets
■ Soil geochemistry at Gold City prospect defines additional gold anomalies
■ On-going work focused on drilling to expand the current MRE
■ Cash at end of quarter $2.4m
■ Additional $4m placement approved by Shareholders post quarter end
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 30 September 2025 (Quarter), during which the Company progressed the advanced Van
Uden Gold Project (the Project) in the Forrestania Region of WA and maintained the Lake Johnston
Project, Figure 1.
Activities for the Quarter included:
• Completing drilling and metallurgy, subsequent to quarter end, of the historical Van Uden
stockpiles, confirming the stockpiles are gold mineralised and amenable to standard carbon in
leach (CIL) processing with low reagent use and recoveries up to 90.7% Au achieved (ASX
announcement 2 October 2025).
• Interrogation of the Van Uden MRE resulted in the definition of high grade laterite at surface,
more specifically 12,496 tonnes at 2.55g/t Au (ASX announcement 21 August 2025).
• Reverse Circulation (RC) drilling commenced at the Van Uden (Tasman pit and resource
expansion) and Gold City projects.
• Post the Quarter end first results were received from the Tasman Pit drilling and the Van Uden
Resource drilling (ASX Announcements 20 October 2025 and 27 October 2025).
• Analysis for gold of historical archived soil samples extended the mineralised strike length at
the Van Uden project from 2.5km to 6.5km and also generated drill targets to the west of the
Van Uden deposit (ASX announcement 9 September 2025).
• Gold analysis of historical archived soil samples generated new gold anomalies at the Gold
City prospect (ASX announcement 7 August 2025).
.
ASX ANNOUNCEMENT
2
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 1 – Simplified Geology with deposit and project locations and TG Metals project tenure. Datum: Zone 51 (GDA94).
Stockpile Drilling and Metallurgy
Drilling of four historical stockpiles from previous mining conducted in the early 1990’s and late 1990’s,
was completed during the Quarter. In addition to analytical gold assay results the samples were also
tested for Metallurgical characteristics. The drilling was conducted on a nominal 10m x 10m spaced
drill pattern on the Dieman Oxide (DO) and Laterite (DL) stockpiles and the Tasman Sediments (TS)
and Mafic (TM) stockpiles. Samples generated were subjected to standard fire assay for gold and a
composite from each of the four stockpiles was also tested metallurgically for standard CIL amenability.
ASX ANNOUNCEMENT
3
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figures 2 to 4 show the stockpiles drilled and grade range results per drillhole.
Figure 2 – Dieman Oxide (DO) and Laterite (DL) stockpiles with sonic drillhole locations and assay intervals
Figure 3 – Tasman Sediments (TS) stockpile with sonic drillhole locations and assay intervals
ASX ANNOUNCEMENT
4
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 4 – Tasman Mafic (TM) stockpile with sonic drillhole locations and assay intervals
The metallurgical results are summarised in Table 1 and broadly show that the mineralisation is a low
reagent consumer and displays a consistent uplift in calculated head grade compared to assayed head
grade from the composite samples (ASX Release 21 August 2025).
Table 1 – Overall Gravity/Leach Results Summary
Composite
Composite
TM
Composite
TS
Composite
DL
Composite
DO
Leach Test # LT01 LT02 LT03 LT04
Calculated Ore Head Grade g/t 1.27 1.05 0.99 0.81
Assay Ore Head Grade g/t 0.66 0.95 0.80 0.71
Gravity Recovery % 22.5% 13.0% 15.0% 19.9%
2 Hour Overall Recovery % 44.8% 42.8% 57.2% 55.0%
4 Hour Overall Recovery % 53.4% 61.9% 63.2% 61.4%
8 Hour Overall Recovery % 64.3% 81.7% 72.9% 76.9%
24 Hour Overall Recovery % 87.8% 86.9% 87.5% 90.5%
48 Hour Overall Recovery % 89.3% 88.5% 89.4% 90.7%
Leach Residue Grade g/t 0.14 0.12 0.11 0.08
Gravity Gold Recovery g/t 0.28 0.14 0.15 0.16
Leach Gold Recovery g/t 0.85 0.79 0.73 0.57
Overall Gold Recovery g/t 1.13 0.93 0.88 0.73
Total NaCN Cons kg/t 0.78 0.74 0.71 0.56
Total Lime Cons kg/t 0.25 0.72 0.55 0.00
ASX ANNOUNCEMENT
5
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
The stockpiles are now sampled in their entirety with metallurgy results provided to potential toll
treatment providers. Approvals are in place to relocate the stockpiles off-site for processing and
establishment works are underway to support the reclaim of these stockpiles. Discussions with potential
toll treatment partners are incomplete and commercial in confidence.
Commencement of Resource and Extensional Drilling
During the Quarter drilling commenced on the Van Uden resource extension and infill program and at
Gold City. Subsequent to the Quarter, assay results were received for reverse circulation (RC) drilling
completed in the base and ramp of the historical Tasman Pit and on the shallow parts of the wider Van
Uden resource (ASX releases 20 October 2025 and 27 October 2025). The purpose of these drilling
campaigns is to expand on the current Van Uden mineral resource estimate (MRE) via infill and down
dip extensions and provide data to improve geological understanding. For the Tasman in-pit drilling the
purpose was also to provide an increased density of data for a revision of the in-pit resource model for
mine design purposes to aid applications for near future mining the remnant gold mineralisation left
behind from the 1998 to 2000 mine development.
High grade gold was intercepted in the drilling as at the date of this report up to 30.8 g/t Au. A summary
of the more significant results is listed below and the drill locations are shown in Figures 5 and 6.
Tasman Pit drilling highlights:
• 10m @ 4.98 g/t Au from 1.0m, including 1m @ 30.8 g/t Au
• 6m @ 2.37 g/t Au from 6.0m, including 1m @ 8.99 g/t Au
• 5m @ 2.48 g/t Au from 2.0m, including 2m @ 4.15 g/t Au
• 4m @ 2.31 g/t Au from 4.0m, including 1m @ 5.5 g/t Au
• 3m @ 3.55 g/t Au from 5.0m, including 2m @ 4.85 g/t Au
• 3m @ 2.51 g/t Au from surface, including 1m @ 5.4 g/t Au
Van Uden Resource drilling highlights:
• 15m @ 4.06 g/t Au from 17.0m, including 3m @ 14.63 g/t Au
• 13m @ 1.12 g/t Au from 22.0m
• 5m @ 1.46 g/t Au from 40.0m, including 2m @ 2.58 g/t Au
• 7m @ 1.09 g/t Au from 15.0m, including 3m @ 1.71 g/t Au
• 5m @ 0.91 g/t Au from 1.0m, including 2m @ 1.44 g/t Au
ASX ANNOUNCEMENT
6
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 5 – Tasman Pit Drilling Collars Showing Select Intercept Highlights
ASX ANNOUNCEMENT
7
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 6 – New Resource Drilling Collars Showing Select Intercept Highlights
ASX ANNOUNCEMENT
8
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
High Grade Laterite
Interrogation of the resource model has identified high grade (+2g/t Au) surface zones (see Figure 7)
within the larger laterite mineralisation envelope (laterite resource inferred and indicated 759,000
tonnes at 0.7g/t Au for 18,740oz Au, refer to ASX release 5 June 2025).
The high-grade laterite zones identified are within historically disturbed ground known as the Laterite
Pit Outline. Bulk samples for metallurgical testing were taken from this area in the 1990’s and early
2000’s. There is a close spaced historical drill pattern over the northern +2g/t Au zone which presents
as a near term opportunity to exploit for adding to oxide material sources to enhance physical milling
characteristics as well as boosting grade (ASX Release 21 August 2025).
Figure 7 – Laterite Pit area showing resource areas of high grade laterite at +1g/t Au and +2g/t Au.
ASX ANNOUNCEMENT
9
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Soil Sampling Results – New Drill Targets
During the Quarter, historical soil sampling pulps were re-assayed for gold. The soil sampling covered
the Van Uden and Gold City tenements and generated new drill targets from gold in soil anomalies.
The soil sampling results at Van Uden has generated several new gold drilling targets (ASX release 9
September 2025) and has increased the strike of the mineralised Van Uden Shear from 2.5km to 6.5km.
Figure 8 shows the soil sample results and increase in mineralised strike. Historical drilling shows the
gold in soil anomalies have been poorly tested, largely with ineffective RAB drilling. During the Quarter,
approvals to drill these new anomalies were lodged with the regulator.
Figure 8 – Soil sampling results at Van Uden
ASX ANNOUNCEMENT
10
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
At Gold City the anomalies increase the area of prospectivity beyond the historical old workings,
northwards into previously undrilled (for gold) ground. Figure 9 shows the soil sampling results,
contours and generated new anomalies. Figure 10 shows the soil sampling results overlaying the
historical workings and historical drill collars, providing further immediate drill targets which were
subsequently drilled post the end of the Quarter (assays pending).
A program of follow-up infill soil sampling at Gold City commenced during the Quarter.
Figure 9 – Soil sampling results at Gold City
ASX ANNOUNCEMENT
11
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 10 – Gold in soil anomalies including Gold City historical workings area
ASX ANNOUNCEMENT
12
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Van Uden Gold Project Current Resource
The Van Uden Gold Project MRE is shown in Table 2.
Table 2: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric
tonnes. It has been reported at a cut-off grade of 0.35 g/t Au by area within a A$5,000/oz Au optimised
pit shell based on mining parameters and operating costs typical for Australian open pit extraction
deposits of a similar scale and geology. Minor discrepancies may occur due to rounding of appropriate
significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a
key principle in mineral resource reporting that requires the qualified person to demonstrate that a
mineral deposit has the potential to be economically extracted in the future.
By applying the appropriate RPEEE the JORC 2012-compliant MRE will facilitate a smooth transition
to the anticipated update to the JORC Code expected by the end of 2025.
Lake Johnston Project
During the Quarter, the Company continued with rehabilitation works on previous drilling sites at the
Lake Johnston project and continued with the tenement rationalisation plan which commenced in the
previous quarter aimed at preserving the Burmeister and Jaegermeister lithium deposits for future
development.
ASX ANNOUNCEMENT
13
SEPTEMBER 2025 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
BUSINESS DEVELOPMENT
During the Quarter, the Company applied for E63/2523 at the Lake Johnston project which became
vacant ground to the immediate east of the Jaegermeister prospect. The Company also applied for
P77/4701 to the immediate north of the Van Uden mining leases and miscellaneous licences L77/371
and L77/372 to support the Van Uden project.
The Company continuously assesses opportunities to grow the business and consolidate tenement
positions as they arise.
CORPORATE
TG Metals closed the Quarter with approximately A$2.375 million in cash. During the Quarter the
Company raised A$2.6 million, before costs, via a placement to institutional and sophisticated
investors, announced 4 August 2025. On 22 September 2025 the Company announced a placement
for A$4.0 million before costs to institutional and sophisticated investors subject to shareholder
approval at a meeting convened on 30 October 2025. At this meeting the approval to issue shares in
relation to this placement was passed by an overwhelming majority.
The Company’s quarterly summary of financials is presented in the Appendix 5B attached.
The Company currently has 102,348,492 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $617,000 on exploration activities,
associated predominantly with activities undertaken on the Van Uden project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $56,812 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe Investor Relations
Chief Executive Officer Evy Litopoulos
TG Metals Resolve IR
info@tgmetals.com.au evy@resolveir.com
ASX ANNOUNCEMENT
SEPTEMBER 2025 QUARTERLY REPORT
_______________________________________________________________
__
14
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in the stable jurisdiction
of Western Australia. The Van Uden Gold Project hosts a JORC 2012 compliant MRE of 6.35 Mt @ 1.1
g/t Au for 227,140 oz (Table 2) on granted mining leases and contains past producing gold mines. The
project is in proximity to operating gold processing Plants. The Lake Johnston Project, hosts the
Burmeister high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding
lithium prospects. Burmeister is in proximity to four lithium processing plants and undeveloped deposits.
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activities
that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe
has consented to the inclusion in this report of matters based on their information in the form and
context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, and performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
ASX ANNOUNCEMENT
SEPTEMBER 2025 QUARTERLY REPORT
_______________________________________________________________
__
15
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 September 2025
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in
Entity’s interest
during Quarter
Exploration Licences
E63/1960 6 BL 05/11/2019 04/11/2029 100% No change
E63/1961 29 BL 05/11/2019 04/11/2029 100% No change
E63/1973 26 BL 16/01/2020 15/01/2030 100% No change
E63/1983 7 BL 21/02/2020 20/02/2030 100% No change
E63/1997 37 BL 27/10/2020 26/10/2025 100% No change
E63/2254 8 BL 20/07/2023 19/07/2028 100% No change
E63/2324* 9 BL Pending N/A 100% No change
E63/2349 20BL 02/02/2024 01/02/2029 100% No change
E63/2434* 6 BL Pending N/A 100% No change
E63/2489 1BL 02/05/2025 01/05/2030 100% No change
E63/2490 1BL 02/05/2025 01/05/2030 100% No change
E63/2523 5 BL Pending N/A 100% 100%
E77/3272 2BL 17/04/2025 16/04/2030 100% No change
E77/1535 10BL 15/03/2011 14/03/2027 80% No change
E77/1582 1BL 01/02/2010 31/01/2026 80% No change
E77/1361 19BL 15/03/2011 14/03/2027 80% No change
Prospecting Licences
P63/2201 176.52 HA 03/11/2020 02/11/2028 100% No change
P63/2202 193.69 HA 16/01/2020 02/11/2028 100% No change
P77/4701* 75.00 HA Pending N/A 100% 100%
*Tenement Application
ASX ANNOUNCEMENT
SEPTEMBER 2025 QUARTERLY REPORT
_______________________________________________________________
__
16
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 September 2025 (Continued)
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in
Entity’s interest
during Quarter
Mining Leases
M77/477 620.95 HA 31/08/1990 30/08/2032 80% No change
M77/478 620.3 HA 31/08/1990 30/08/2032 80% No change
M77/522 529.15 HA 11/10/1991 10/10/2033 80% No change
M77/523 449.15 HA 11/10/1991 10/10/2033 80% No change
Miscellaneous Licences
L77/271 12.73 HA 04/07/2018 03/07/2039 100% No change
L77/299 4.53 HA 10/11/2021 09/11/2042 100% No change
L77/371* 1.00 HA Pending N/A 100% 100%
L77/372* 4.00 HA Pending N/A 100% 100%
*Tenement Application
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN Quarter ended (“current quarter”)
40 644 621 830 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(11) (11)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (277) (277)
(e) administration and corporate costs (254) (254)
1.3 Dividends received (see note 3) - -
1.4 Interest received 15 15
1.5 Interest and other costs of finance paid (1) (1)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives 388 388
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(140) (140)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (19) (19)
(d) exploration & evaluation (606) (606)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(625) (625)
3. Cash flows from financing activities
2,600 2,600
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
(182) (182)
3.8 Dividends paid - -
3.9 Other – Lease payments (13) (13)
3.10 Net cash from / (used in) financing
activities
2,405 2,405
4. Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (3
months)
$A’000
4.1 Cash and cash equivalents at beginning of
period
735 735
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(140) (140)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(625) (625)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2,405 2,405
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
2,375 2,375
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 2,360 720
5.2 Call deposits 15 15
5.3 Bank overdrafts - -
5.4 Other – Term Deposits - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,375 735
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (140)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(606)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (746)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,375
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,375
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.18
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 31 October 2025
Authorised by: .........By the Board..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional inform