Recent Drilling to Extend Resource at Van Uden Gold Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 5 MAY 2025
RECENT DRILLING TO EXTEND THE RESOURCE
FOR THE VAN UDEN GOLD PROJECT
Highlights
■ Recent historical drilling at the Van Uden Gold Project is expected to
add to the existing mineral resource estimate (MRE)
■ All drill holes completed since 2020 have been resurveyed and
incorporated into the updated MRE
■ This drilling intersected considerable shallow high grade mineralisation
and improves continuity
■ Mineralisation remains open down-dip
■ The updated MRE expected to be completed by end of May
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to provide updated
details on the drilling conducted by the previous operator of the Van Uden Gold Project (Van
Uden Gold or the Project), Montague Resources Australia Pty Ltd (Montague).
The drilling is being restated following resurveying of the drill collars by TG Metals with an
accuracy sufficient for resource modelling. The updated data is being incorporated into the
2012 JORC compliant resource modelling which is well underway and expected to be
completed later in May. Importantly this drilling, which was conducted between 2020 and
2024, tested the down dip continuity of the gold mineralisation, including high grade intercepts
that have not been incorporated in resource models. Highlights from this drilling include:
•
WVUR011 - 8m @ 1.64g/t Au from 56m
•
WVUR013 - 14m @ 2.72g/t Au from 69m
•
WVUR015 - 8m @ 5.45g/t Au from 93m
•
WVUR016 - 16m @ 1.48g/t Au from 69m and 7m @ 3.68g/t Au from 99m
•
WVUR021 - 6m @ 2.74g/t Au from 109m
•
WVUR022 - 20m @ 2.37g/t Au from 89m
•
WVUR023 - 3m @ 6.54g/t Au from 81m and 11m @ 2.29g/t Au from 87m
•
WVUR031 - 17m @ 5.07g/t Au from 36m and 7m @ 1.4g/t Au from 74m
•
WVUR041 - 26m @ 1.34g/t Au from 58m
TG Metals CEO, Mr. David Selfe stated;
“This recent drilling confirms the continuity of the gold mineralisation system down dip and
along strike at Van Uden. It supports a simple model with continuous gold mineralisation over
a 2.5km strike. Based on the significant amount of historical drilling, our team is well advanced
with the updated 2012 JORC compliant resource model.
Plans for the drill testing of existing mine stockpiles is also progressing well, with the Company
looking to pursue early production opportunities.”
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Van Uden Re-Surveyed Drillholes
Past RC drilling from the period 2021 to 2024 contained 26 drillholes which were not collar
surveyed by DGPS. To define accurate collars, TG Metals field surveyed the drill collars of
these 26 holes with DGPS and also conducted check surveys on four holes previously
surveyed with DGPS for accuracy comparison. The survey results are presented in Table 1.
The re-surveyed drilling within the Van Uden Group is shown in Figure 1 in plan view and in
cross section in Figures 2 and 3. Full drill intercept results in Table 2.
Figure 1 – Resurveyed drillholes (yellow series) and cross section locations at Van Uden Group
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Figure 2 – Cross Section through Tasman Pit, Van Uden Group deposit
Figure 3 – Cross Section through Dieman Pit, Van Uden Group deposit
Resource Estimate Progress
A JORC 2012 compliant Mineral Resource Estimate (MRE) to replace the Convergent
published JORC 2004 compliant MRE for the Van Uden Group (ASX:CVG 1 March 2013), is
well underway with a site visit conducted by the consultant as part of their compliance duties.
Mineralisation interpretation has been completed by TG Metals in-house geology team. This
included the recent drilling now resurveyed.
The resource update will also include the surface laterite mineralization, an important gold
bearing domain, in its wireframe models. The updated MRE is expected to be completed later
in May and will provide the basis for commencement of mining studies.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Past Mining Stockpiles
As reported to the ASX 30 April 2025, a Programme of Work (POW) has been submitted for
drilling of the historic past mining stockpiles. The chosen drill method is Sonic drill core
(subject to availability) to enable the acquisition of samples suitable for metallurgical as well
as analytical analysis. Accurate volume determinations will also be required and aerial LiDAR
surveys have been booked. The drilling of the stockpiles is expected to be completed before
mid year.
TG Metals has engaged Stephen Miller of Red Rock Engineering Pty Ltd, for the supply of
mining engineering expertise as the Company assesses it’s early production opportunities.
Table 1 – Resurvey Results
Hole ID
WCTR001
WCTR002
WCTR003
WCTR004
WCTR005
WCTR006
WCTR007
WCTR008
WCTR009
WCTR010
WCTR011
WVUR001
WVUR002
WVUR003
WVUR004
WVUR005
WVUR006
WVUR007
WVUR008
WVUR035
WVUR036
WVUR037
WVUR038
WVUR039
WVUR040
WVUR041
GDA94 Easting GDA94 Northing AHD Height RegEast GDA94 RegNorth GDA94
DGPS New
DGPS New
DGPS New
Survey Old
Survey Old
759138.91
6416181.29
391.95
759140
6416177
759135.83
6416145.44
392.25
759140
6416140
759173.45
6416145.61
392.57
759175
6416140
759140.72
6416104.46
391.47
759143
6416102
759136.23
6416061.77
390.66
759139
6416056
759175.56
6416055.91
391.14
759174
6416052
759130.42
6416021.35
389.63
759133
6416022
759154.27
6416033.08
390.21
759157
6416032
759154.60
6416116.09
391.87
759154
6416113
759176.88
6416020.85
390.63
759174
6416017
759172.94
6416093.32
391.71
759172
6416091
750742.79
6438041.74
399.86
750736.68
6438043.63
750846.61
6438289.20
402.21
750841.78
6438283.43
750582.09
6438412.68
405.86
750580.78
6438414.43
750960.37
6438545.95
402.38
750956.78
6438549.43
750711.75
643867.93
405.55
750700.78
6438664.43
750576.86
6439047.78
409.32
750572.78
6439052.43
751343.89
6438231.82
402.48
751331.78
6438232.43
751486.35
6438522.40
401.88
751480.78
6438519.43
748736.51
6439441.3
410.11
748737.54
6439442.47
749113.29
6439577.86
412.95
749113.69
6439578.85
749493.38
6439717.69
420.84
749489.84
6439715.23
749862.93
6439847.72
426.23
749865.96
6439851.59
750473.98
6439435.21
413.67
750472.87
6439432.82
750468.25
6439402.05
413.92
750466.78
6439404.43
750464.95
6439161.73
411.66
750467.37
6439162.12
RegRL
Survey Old
400
400
400
400
400
400
400
393.77
391.49
398.66
389.50
399.54
403.34
409.68
406.09
409.75
414.38
402.32
402.80
409.50
412.30
420.30
426.50
413.00
413.00
411.00
WVUR010*
WVUR012*
WVUR019*
WVUR020*
Check Easting Check Northing
749601.94
6440443.38
749667.45
6440368.77
750199.44
6439757.63
750232.14
6439665.61
DGPS Old
435.97
433.54
424.39
421.74
Check RL
435.56
433.31
424.20
422.25
DGPS Old
749594.85
749666.63
750197.77
750226.14
DGPS Old
6440439.80
6440367.12
6439758.03
6439665.59
*Drill Collars original DGPS (Old) checked with new DGPS (Check) for comparison
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Table 2 – Drill Intercepts for reported Montague drillholes >0.5g/t Au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Van Uden Gold Project Description
The Project is located on the Forrestania Greenstone Belt, 90km east-northeast of Hyden and
120km south of Southern Cross. It is close to the Marvel Loch (producing) and Westonia Edna May (care & maintenance) gold processing Plants and is 130km from the Company’s
established Burmeister lithium deposit at the Lake Johnston Project.
Van Uden Gold consists of four granted mining leases, four granted exploration licences, one
exploration licence application and two miscellaneous licences (for haul roads). The Project
lies to the west of the Mt Holland lithium mine, south of the operating Marvel Loch gold Plant,
and southeast of the Edna May gold Plant.
Figure 4 – Location Map showing TG Metals’ Van Uden Gold Project
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in the stable jurisdiction
of Western Australia. The Lake Johnston Project hosts the Burmeister high grade lithium deposit,
Jaegermeister lithium pegmatites and several surrounding lithium prospects. Burmeister is in proximity
to four lithium processing plants and undeveloped deposits. The Van Uden Gold Project contains past
producing gold mines and is in proximity to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
7
ASX
ASX ANNOUNCEMENT
I
RELEASED 5 MAY 2025
________________________________________________________________
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
8
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
•
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
Drilling
techniques
Commentary
•
•
•
•
•
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
1
•
•
The historical drilling programs consisted of Rotary Air Blast (RAB),
Air Core (AC), Reverse Circulation (RC), and Diamond Drilling
(DD).
WAMEX Open File Reports A035288, A059401, A059832,
A061839, A067423, A072918, A079996, A093378, A095101,
A097549, A110467 & A113837 detail the historical data and
sampling techniques.
RC and DD drill samples were collected at 1m intervals, while RAB
were composite sampled at 5m intervals. Resampling at 1m was
initiated if anomalous values were detected in the composite
interval.
Samples were dispatched to ALS laboratories or Yilgarn Assay
Laboratory for Fire Assay (gold) and ICP-MS (multi-element
analysis.
The sampling was considered industry standard for gold
exploration, ensuring representivity. Laboratory check samples
were extracted from WAMEX reports.
Drill types:
o RC drilling with face-sampling bits.
o DD drilling with HQ and NQ core.
o RAB drilling with open-hole hammer.
Drill inclinations and depths vary by project area, with inclinations
typically -60° to vertical.
Recovery was logged, particularly for diamond drilling.
RC samples were weighed to ensure consistency.
Criteria
JORC Code explanation
Commentary
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
Some RAB intervals showed sample loss due to weathering
effects.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
•
•
•
All drill holes were geologically logged.
Geotechnical data was recorded where applicable (DD logs)
Logging included alteration, lithology, mineralisation, and structure
(DD logs only)
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
•
•
RC samples were split using a riffle splitter.
DD samples sawn in half, with one half sent for analysis.
Samples dispatched to ALS or Yilgarn Assay Laboratory were split
and pulverized to <75μm prior to analysis.
No record of duplicate sampling in some historical reports.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
•
•
Quality of
assay data
and
laboratory
tests
2
•
•
•
•
Fire assay detection limit of 0.01 ppm Au.
ALS Laboratory and Yilgarn Assay Laboratory were used for assay
work.
No explicit QA/QC procedures were provided or published in
WAMEX reports.
Field Duplicates, Lab Checks were recorded in reports and
captured in the database.
The contract surveyor (Down Under Surveyors) established the
survey station using Auspos from Geoscience Australia with a
check for height accuracy on Benchmark HH274. A detailed report
was provided to TG Gold Pty Ltd.
Criteria
JORC Code explanation
Commentary
•
No interference or
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
•
No dedicated twin holes were recorded.
Independent verification not consistently reported.
Assay data adjustments were not reported.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
Original Survey Data - drill collars surveyed by DGPS where
available were recorded in the database. RL data sourced from
topographic surveys.
All collar coordinates were converted to MGA 94, Zone 50.
Re-surveyed collars and drill collars without survey data (refer to
Table 1 – body text) were measured and recorded using ‘singleman survey equipment’. An Ashtech GNSS receivers 1 was set up
at the base station position and roving receiver to pick up collar
locations. The Survey method was Post Processed Kinematic. The
base station (the survey point – Star Iron Picket) was established
using Auspos from Geoscience Australia with a check for height
accuracy on Benchmark HH274. A detailed report was provided to
TG Gold Pty Ltd.
The new-collar data has been appended to the database, whilst the
re-surveyed collar locations were checked and original DGPS
survey data coordinates were considered accurate and not
replaced.
•
•
•
Data spacing
and
distribution
Orientation of
data in
relation to
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
•
•
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
•
•
3
•
Drill spacing varied by project area.
RC drilling was planned and drilled on a 25m x 25m grid for
resource estimation. Infill 12.5m x 25m were drilled as required.
Sample compositing representing 5m interval was applied in the
initial RAB programs.
Drilling was oriented perpendicular to mineralsation.
Some drill deviations occurred at the discretion of the supervising
geologist.
Criteria
geological
structure
JORC Code explanation
Commentary
sampling bias, this should be assessed and reported if material.
Sample
security
• The measures taken to ensure sample security.
•
•
Samples were stored securely before transport to laboratories.
There was no record of tampering or loss.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data.
•
•
•
No formal audits completed on the data.
Internal data reviews performed by project geologists.
Database included 4,829 drillholes, which comprised of:
o 1,321m of DD;
o 50,620m of RC;
o 709m of AC;
o 39,690m of RAB; and
o 3010m of BH “Unspecified Type”
o A total of 79,197 samples were included in the database.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
•
• Acknowledgment and appraisal of exploration by other parties.
•
Exploration
done by other
parties
Commentary
4
•
TG Metals has an 80% ownership in the mining and exploration
tenements from Montague Resources Australia Pty Ltd, with the
remaining 20% retained by Barto Gold Mining Pty Ltd. These
tenements include E77/1535, E77/1582, E77/1361, M77/523,
M77/478, M77/477 and M77/522, all located in Western Australia.
Additionally, TG Metals has acquired 100% ownership of the
miscellaneous licence L77/299 and is acquiring 100% ownership of
the miscellaneous licences L77/271. TG Metals has also applied
for and been granted tenement E77/3272 and has applied for
tenement E77/3285.The tenements are designated under the
prospect names Van Uden, Gold City, and Split Rocks East. All
tenements are in good standing.
Historical exploration by Reynolds Australia, PacMin Mining
Corporation, Convergent Minerals, Viceroy Australia Pty Ltd,
Forrestania Gold NL, Sons of Gwalia Limited, St Barbara Mines
Criteria
JORC Code explanation
Commentary
•
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
•
•
Drill hole
Information
Data
aggregation
methods
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
5
Limited, Montague Resources Australia Pty Ltd, Kidman Resources
Limited, Tianye SXO Gold Mining Pty Ltd, and MH Gold Ltd.
Data has been obtained from WAMEX Open File reports and
provided by Montague Resources as part of the Sales and
Purchase Agreement.
Hosted within the Southern Cross-Forrestania Greenstone Belt.
Gold mineralisation is structurally controlled, occurring along shear
zones and in quartz veins.
The geological structure had previously been interpreted as a
shallowly eastward dipping system associated with a generally
NNW striking contact zone.
Van Uden Resource Statement (2013) indicates primary and
secondary mineralisation.
• Relevant tables have been included in within the body text.
•
•
Composite sampling (5m RAB, 4m RC) with 1m re-sampling if a
gold anomaly was recorded.
No weighted averaging or top-cutting was applied.
Criteria
JORC Code explanation
Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
• Reported as downhole lengths, true widths unknown.
• The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
• Test mine stockpiles for mineralisation.
• Undertake confirmation drilling through known resources.
• Test mineralised trends taking into consideration current market
conditions.
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
6
• Maps, diagrams and sections included in the body text.
• All results included; no selective reporting.
•
•
Airborne geophysics and soil geochemistry conducted.
Petrographic and metallurgical data in some reports.
Share your feedback