High Grade Gold Results Continue at Van Uden
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 27 OCTOBER 2025
High Grade Gold Results Continue at Van Uden
Highlights
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to provide the results
of drilling at the Van Uden Gold Project (Van Uden or the Project).
Drilling consisted of shallow (less than 110m depth) reverse circulation (RC) drillholes at the
Van Uden gold deposit, targeting resource expansion and geological understanding. Result
highlights include:
• 15m @ 4.06 g/t Au from 17.0m, including 3m @ 14.63 g/t Au
• 13m @ 1.12 g/t Au from 22.0m
• 5m @ 1.46 g/t Au from 40.0m, including 2m @ 2.58 g/t Au
• 7m @ 1.09 g/t Au from 15.0m, including 3m @ 1.71 g/t Au
• 5m @ 0.91 g/t Au from 1.0m, including 2m @ 1.44 g/t Au
TG Metals CEO, Mr. David Selfe stated;
“The shallow drilled parts of the Van Uden deposit are proving to be a fertile ground for easy
resource growth. High grades are a bonus but the shallow primary mineralisation coupled with
mineralised laterite above should assist greatly with future economic studies planned for early
2026 following a new mineral resource estimate in the new year.
The extensional drilling of the broader Van Uden resource will enter a new phase later this
week with the commencement of deeper drilling on extensions of the resource. We have a lot
more drilling to do and samples are in the laboratory pending analysis. We look forward to
releasing results as they come hand.
The Gold City prospect maiden drilling results are also eagerly awaited.”
■ High grade assays returned from drilling of the northern extensions at
Van Uden
■ High tenor results include:
■ 15m @ 4.06 g/t Au, including 3m @ 14.63 g/t Au
■ 5m @ 1.46 g/t Au, including 2m @ 2.58 g/t Au
■ Results expected to add gold ounces to the current mineral resource
■ Drilling ramp up with deeper holes to commence this week and ongoing
results over the coming weeks
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
2
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Van Uden Drilling
The purpose of this drilling campaign is to expand on the current Van Uden mineral resource
estimate (MRE) via infill and down dip extensions and provide data to improve geological
understanding. These results will add to the data for a revision of the MRE in Q1 2026.
All drill assays reported are located within the northern half of the Van Uden project. Figure 1
shows the location of the drillholes.
Figure 1 – New Resource Drilling Collars Showing Select Intercept Highlights referenced on page 1
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
3
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Cross section Figure 2 shows a typical section through the new drilling and the previous
historical drilling. The full significant assay results above 0.3g/t Au are provided in Table 2.
Figure 2 – Cross Section A-A’ Showing New Drilling, Historical Drilling and Van Uden Mineralisation Envelope
The RC drilling was conducted with a truck mounted Hydco-Moses drill rig. This rig is suitable
for shallow drilling (-110m) in the oxidised to semi-oxidised regolith. A total of 9 drillholes are
included in this report for 360m of RC drilling. The drillhole dips are all -60o
at an azimuth of
250o
to align with the previous historical grid. See Table 1 for drill collar information.
The reported drilling is in the northern half of the resource area. Additional drilling has been
completed in the southern resource area with assay results pending. See Figure 1 for drill
collar locations.
Individual 1m samples were assayed using the Photon assay technique, which utilises a larger
sample charge than fire assay. This has the potential to reduce the “nugget effect” caused
by coarse gold particles. Coarse gold is noted in panning of the high grade samples from
drillhole TGGR009, from 23m to 24m, with assays returning 1m @ 21.55 g/t Au. Of note is a
discernable increase in mineralisation width and grade where the new drillholes are in close
proximity to historical drillholes. See Figure 2 cross section. The coarse gold present may be
a factor in this difference and further check drilling (twinning) and check assaying such as
screen fire assay may be warranted.
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
4
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Table 1 – Drillhole Collar Information GDA94, Zone 50
Follow-up Work
The drilling underway at Van Uden will be used to update the current resource model (MRE)
A larger RC drill rig will commence drilling the planned deeper drillholes targeting down dip
extensions which have not previously been drilled.
Assays are pending for the maiden exploration drilling program recently completed at the Gold
City prospect, 20km south of the Van Uden resource area.
Drill testing the full 6.5km mineralised strike of the Van Uden shear will be undertaken in
tandem with the current drilling, subsequent to the Program of Work approvals, refer to Figure
3.
HOLE ID Dip (
o
) Azimuth (
o
) EASTING (m) NORTHING (m) RL (mASL) Depth (m)
TGGR008 -60.0 250.0 749407.000 6440404.000 442.000 42.0
TGGR009 -60.0 250.0 749438.000 6440416.000 442.000 42.0
TGGR010 -60.0 250.0 749495.000 6440437.000 440.000 60.0
TGGR011 -60.0 250.0 749716.000 6440169.000 434.000 24.0
TGGR012 -60.0 250.0 749740.000 6440178.000 435.000 42.0
TGGR013 -60.0 250.0 749767.000 6440188.000 435.000 54.0
TGGR014 -60.0 250.0 749886.000 6439991.000 430.000 18.0
TGGR015 -60.0 250.0 749908.000 6439999.000 430.000 30.0
TGGR016 -60.0 250.0 749967.000 6439914.000 428.000 48.0
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
5
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 3 – Van Uden 6.5Km strike extension and Footwall drill targets.
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
6
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Van Uden Gold Project Description
The Project is located on the Forrestania Greenstone Belt, Figure 4, 90km east-northeast of
Hyden and 120km south of Southern Cross. It is close to the Marvel Loch (producing) and
Westonia - Edna May (care & maintenance) gold processing Plants and is 130km from the
Company’s established Burmeister lithium deposit at the Lake Johnston Project.
Van Uden Gold consists of an Indicated and Inferred Mineral Resource as per Table A below
on four granted mining leases, four granted exploration licences, one exploration licence
application and two miscellaneous licences (for haul roads). The Project lies to the west of the
Mt Holland lithium mine, south of the operating Marvel Loch gold Plant, and southeast of the
Edna May gold Plant.
Table A: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. It has been reported
at a cut-off grade of 0.35 g/t Au by area within a A$5,000/oz Au optimised pit shell based on mining parameters
and operating costs typical for Australian open pit extraction deposits of a similar scale and geology. Minor
discrepancies may occur due to rounding of appropriate significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle
in mineral resource reporting that requires the qualified person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium
assets at its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in
the stable jurisdiction of Western Australia. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium
prospects. Burmeister is in proximity to four lithium processing plants and undeveloped
deposits. The Van Uden Gold Project contains past producing gold mines and is in proximity
to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact Investor Relations
Mr David Selfe Evy Litopoulous
Chief Executive Officer ResolveIR
Email: info@tgmetals.com.au Email: evy@resolveir.com
Material
Tonnes
Grade
(Aug/t) Gold (Oz) Tonnes
Grade
(Aug/t) Gold (Oz) Tonnes
Grade
(Aug/t) Gold (Oz)
Laterite 234,000 0.9 6,940 525,000 0.7 11,800 759,000 0.7 18,740
Oxide 867,000 1.2 34,200 1,141,000 1.0 38,200 2,008,000 1.0 72,400
Transitional 291,000 1.1 10,700 770,000 1.1 26,500 1,061,000 1.1 37,200
Fresh 318,000 1.6 16,500 2,207,000 1.2 82,300 2,525,000 1.2 98,800
Total 1,710,000 1.2 68,340 4,643,000 1.2 158,800 6,353,000 1.1 227,140
Mineral Resource Estimate for the VanUdenGold Deposit - May 2025
Indicated Inferred Total
ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
7
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 4 – Location Map showing TG Metals’ Van Uden Gold Project
8
ASX ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-
looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
9
ASX ASX ANNOUNCEMENT I RELEASED 27 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Table 2 – Drill Assay Table – NSI=no significant Intercept (<0.3g/tAu), All 1m intervals
HOLE ID FROM TO PROSPECT Au (g/t)
TGGR008 0 1 Van Uden North 0.32
TGGR008 1 2 Van Uden North 0.42
TGGR008 2 22 Van Uden North NSI
TGGR008 22 23 Van Uden North 0.82
TGGR008 23 24 Van Uden North 1.30
TGGR008 24 25 Van Uden North 2.31
TGGR008 25 26 Van Uden North 0.75
TGGR008 26 27 Van Uden North 0.91
TGGR008 27 28 Van Uden North 0.48
TGGR008 28 29 Van Uden North 0.54
TGGR008 29 30 Van Uden North 0.53
TGGR008 30 31 Van Uden North 1.03
TGGR008 31 32 Van Uden North 0.88
TGGR008 32 33 Van Uden North 2.73
TGGR008 33 34 Van Uden North 1.22
TGGR008 34 35 Van Uden North 1.02
TGGR008 35 37 Van Uden North NSI
TGGR008 37 38 Van Uden North 0.62
TGGR008 38 42 Van Uden North NSI
TGGR009 0 1 Van Uden North 0.17
TGGR009 1 2 Van Uden North 0.60
TGGR009 2 17 Van Uden North NSI
TGGR009 17 18 Van Uden North 0.49
TGGR009 18 19 Van Uden North 0.02
TGGR009 19 20 Van Uden North 0.54
TGGR009 20 21 Van Uden North 1.19
TGGR009 21 22 Van Uden North 2.71
TGGR009 22 23 Van Uden North 0.09
TGGR009 23 24 Van Uden North 21.55
TGGR009 24 25 Van Uden North 11.96
TGGR009 25 26 Van Uden North 10.37
TGGR009 26 27 Van Uden North 0.85
TGGR009 27 28 Van Uden North 2.90
TGGR009 28 29 Van Uden North 3.73
TGGR009 29 30 Van Uden North 1.09
TGGR009 30 31 Van Uden North 2.94
TGGR009 31 32 Van Uden North 0.43
TGGR009 32 48 Van Uden North NSI
TGGR010 0 1 Van Uden North 0.11
TGGR010 1 2 Van Uden North 0.09
TGGR010 2 3 Van Uden North 0.40
TGGR010 3 39 Van Uden North NSI
TGGR010 39 40 Van Uden North 1.10
TGGR010 40 41 Van Uden North 0.18
TGGR010 41 42 Van Uden North 0.26
TGGR010 42 43 Van Uden North 0.14
TGGR010 44 45 Van Uden North 1.00
TGGR010 45 53 Van Uden North NSI
TGGR010 53 54 Van Uden North 2.73
TGGR010 54 66 Van Uden North NSI
TGGR011 0 3 Van Uden North NSI
TGGR011 3 4 Van Uden North 0.57
TGGR011 4 5 Van Uden North 1.03
TGGR011 5 6 Van Uden North 0.38
TGGR011 6 7 Van Uden North 1.36
TGGR011 7 24 Van Uden North NSI
HOLE ID FROM TO PROSPECT Au (g/t)
TGGR012 0 15 Van Uden North NSI
TGGR012 15 16 Van Uden North 0.30
TGGR012 16 17 Van Uden North 0.24
TGGR012 17 18 Van Uden North 1.04
TGGR012 18 19 Van Uden North 2.62
TGGR012 19 20 Van Uden North 1.48
TGGR012 20 21 Van Uden North 0.93
TGGR012 21 22 Van Uden North 1.03
TGGR012 22 42 Van Uden North NSI
TGGR013 0 34 Van Uden North NSI
TGGR013 34 35 Van Uden North 0.57
TGGR013 35 38 Van Uden North NSI
TGGR013 38 39 Van Uden North 0.29
TGGR013 39 40 Van Uden North 0.24
TGGR013 40 41 Van Uden North 2.66
TGGR013 41 42 Van Uden North 2.51
TGGR013 42 43 Van Uden North 0.67
TGGR013 43 44 Van Uden North 0.89
TGGR013 44 45 Van Uden North 0.55
TGGR013 45 53 Van Uden North NSI
TGGR013 53 54 Van Uden North 0.52
TGGR013 54 56 Van Uden North NSI
TGGR013 56 57 Van Uden North 0.42
TGGR013 57 58 Van Uden North 0.36
TGGR013 58 59 Van Uden North 0.41
TGGR013 59 60 Van Uden North 0.19
TGGR014 0 1 Van Uden North 0.43
TGGR014 1 18 Van Uden North NSI
TGGR015 0 1 Van Uden North 0.54
TGGR015 1 2 Van Uden North 0.56
TGGR015 2 3 Van Uden North 0.45
TGGR015 3 4 Van Uden North 0.26
TGGR015 4 5 Van Uden North 0.27
TGGR015 5 6 Van Uden North 0.34
TGGR015 6 7 Van Uden North 0.15
TGGR015 7 8 Van Uden North 0.53
TGGR015 8 12 Van Uden North NSI
TGGR015 12 13 Van Uden North 0.39
TGGR015 13 14 Van Uden North 0.81
TGGR015 14 15 Van Uden North 0.44
TGGR015 15 29 Van Uden North NSI
TGGR015 29 30 Van Uden North 0.53
TGGR015 30 36 Van Uden North NSI
TGGR016 0 1 Van Uden North 0.12
TGGR016 1 2 Van Uden North 0.68
TGGR016 2 3 Van Uden North 1.84
TGGR016 3 4 Van Uden North 1.04
TGGR016 4 5 Van Uden North 0.68
TGGR016 5 6 Van Uden North 0.30
TGGR016 6 11 Van Uden North NSI
TGGR016 11 12 Van Uden North 0.29
TGGR016 12 13 Van Uden North 0.31
TGGR016 13 14 Van Uden North 0.15
TGGR016 14 15 Van Uden North 0.05
TGGR016 15 16 Van Uden North 0.30
TGGR016 16 23 Van Uden North NSI
1
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• All holes were sampled at 1 m intervals using an on-board Ox
Cyclone Sampling system with fixed cone splitter engineered for
the rig.
• Two samples (Original + Duplicate) were collected each metre,
representing 12.5 % of total cyclone discharge per split.
• Certified reference materials (CRMs) were inserted every 20
samples, and coarse blanks every 40 samples. All samples were
dry.
• Samples were transported to Laboratory: SGS Australia Pty Ltd,
Kalgoorlie WA (17 Stockyard Way) for PhotonAssay™ PAAU02,
two-cycle analysis on pulverised material.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Reverse-circulation (RC) drilling was undertaken using a Hydo
Moses truck mounted rig (JDC Drilling, Southern Cross WA)
• The rig was equipped with a:
o face sampling pneumatic hammer,
o ELGI 350 PSI, 900cfm Compressor
o 700 PSI @ 1400 CFM Hurricane auxiliary booster
o KL remote rod handler, and
o TJM hands free break out system.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Sample recovery was visually assessed and recorded by comparing
the two splitter outputs each metre.
• All samples were dry with negligible loss.
• Given the dry conditions and fixed splitter configuration, no material
bias is expected.
2
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• RC drill cutting of the metre interval was sieved and placed into a
chip tray for geological logging and future reference. Clay intervals
in regolith were not sieved, however any remnant rock/hard
material were sieved and washed for identification.
• TG Metals Limited geological logging system:
o Recognises fresh rock vs regolith.
o Is both qualitative and quantitative.
o Industry and geological standards were followed recording
every detail observed.
o Every interval (m) drilled was logged.
o 20m interval Chip trays were labelled and used to store a
small representative sample for future reference.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Samples were split at the rig using a fixed cone splitter, producing
two by 12.5 % sub-samples per metre.
• All samples were transported to SGS Kalgoorlie for preparation and
PhotonAssay™ analysis.
• Laboratory preparation (SGS Kalgoorlie) included:
o Drying at 105 °C (< 3 kg) — G_DRY
o Crushing 90 % < 3.35 mm — G_CRU_KG
o Pulverising 85 % < 75 µm — G_PUL
o 500g PhotonAssay™ jar filled from pulverised material
• Sample weights were recorded by SGS on receipt.
• CRMs and blanks returned results within expected limits.
• Field duplicates retained but not yet analysed.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Laboratory: SGS Australia Pty Ltd, Kalgoorlie WA (17 Stockyard
Way).
• Method: PhotonAssay™ PAAU02, two-cycle analysis on pulverised
material.
• Charge weight: 500g Detection limit: 0.03 ppm Au – 350 ppm Au
(over-range PAAU02H, 100 – 3500 ppm Au).
• Preparation: drying, crushing (90 % < 3.35 mm) and pulverising (85
% < 75 µm) prior to jar fill.
• Precision may be reduced in samples with elevated U, Th or Ba.
• No umpire analyses to date.
3
Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• All assays reviewed and verified internally by TG Metals geological
personnel prior to import into the master database.
• No twinned holes were drilled. However holes were drilled in
proximity to historical drillholes for comparative and additional data.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Coordinate system: MGA94 Zone 50.
• Collar survey: GPS (+/- 3m accuracy). DGPS at conclusion of the
program
• Downhole survey: CHAMPS north-seeking gyro (Continuous mode)
– manufactured by Downhole Surveys Pty Ltd
• Topography: LiDAR surface model.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Spacing considered appropriate for the resource infill drilling
campaign.
• The drilling data will be used to update the current reported MRE
(Table A of the report)
• Assays reported on 1 m intervals; no compositing applied.
Orientation of
data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• Mineralisation is interpreted as shear- and vein-hosted along local
contacts; drilling orientations are appropriate for testing mineralised
zones and introduce no material bias at this scale.
Sample
security
• The measures taken to ensure sample security. • Samples were bagged and sealed in calico bags inside polyweave
sacks, cable-tied and labelled at the rig.
• Chain of custody was maintained by TG Metals personnel, who
personally transported samples directly from site to SGS Kalgoorlie
Laboratory for registration and analysis.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. • No external audits specific to this program.
• Internal QAQC checks identified no material issues.
4
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• Dieman and Laterite Pits are in Mining Lease 77/477. The
tenement is currently held by Montague Resources Pty Ltd (80%)
and Barto Gold Mining Pty Ltd (20%). Ownership: TG Metals has
acquired 80% ownership of the Mining lease from Montague
Resources Australia Pty Ltd, pending title transfer.
• The tenement is in good standing and unaffected by heritage or
environmental encumbrances.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. • Dieman and Laterite Pit were previously mined and drilled by
earlier operators as part of historic gold extraction.
• Historic data have been reviewed where available.
Geology • Deposit type, geological setting and style of mineralisation. • Orogenic, shear- and vein-hosted gold mineralisation occurs within
theForrestania greenstone belt along the sediment–mafic contact,
intruded by a pegmatite dyke.
Host rocks are amphibolite-facies metasediments and mafic
volcanic units showing local quartz veining and minor schistose
alteration. Gold mineralisation is structurally controlled and
consistent with regional orogenic systems of the Western
Australian Yilgarn Craton.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
• Collar coordinates, orientation and hole depths for the infill drilling
have been provided in the Table 1 of the report.
• No holes were abandoned.
5
Criteria JORC Code explanation Commentary
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are
Share your feedback
Discover