ASX ANNOUNCEMENT
RELEASED 31 JULY 2026
1
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Quarterly Activities Report
for the period ended 30 June 2026
HIGHLIGHTS
■ First Ore Processing and Profit Share agreement executed
■ Continued significant drilling success at the Van Uden Gold Project,
extending mineralisation to approximately 4.3 km of strike
■ Metallurgical optimisation work demonstrated higher gold recoveries over
90%, supporting improved economics for future development studies
■ Drilling to increase the Van Uden laterite gold resource successfully
completed
■ Mining Lease application lodged for the Burmeister Lithium Deposit,
advancing the Lake Johnston Lithium Project toward potential
development
■ Ongoing work on development pathways for both the Van Uden Gold
Project and the Lake Johnston Lithium Project
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 30 June 2026 (Quarter), during which the Company progressed the advanced Van Uden
Gold Project (the Project) in the Forrestania Region of WA and the Lake Johnston Lithium Project,
Figure 1.
Activities for the Quarter included:
• The Van Uden MRE (Mineral Resource Estimate) was updated with a significant increase of
over 120% in the Indicated category and an overall increase in ounces to 270,800 ounces Au,
see Table 1 (ASX Announcement 16 April 2026). The new MRE sets the Company up for Mine
Planning and the assessment of development pathways for the Van Uden Gold Project. This
update was reported in the March quarter as a subsequent event.
• Final Reverse Circulation (RC) drilling results from the 2025 drill campaign at Van Uden were
received and confirmed gold mineralisation a further 1.8km south along strike of the Van Uden
shear, increasing the overall mineralised strike length to 4.3km (ASX Announcement 15 June
2026).
• Metallurgical testwork on gold bearing Laterite (Column Leach) achieved +90% recoveries
(ASX Announcement 14 May 2026).
• Post end of the Quarter, Laterite auger results at the Van Uden project were reported,
confirming surface laterite mineralisation outside the current laterite resource (ASX
Announcement 9 July 2026). This is significant as an increase in laterite resource will enhance
the economics of the upcoming the Van Uden Heap Leach study. The Company also
announced the execution of an Ore Purchase and Profit Share agreement with Medallion
Metals Limited for the treatment of mineralised stockpiles (ASX Announcement 22 July 2026),
an important milestone for the Van Uden Gold Project..
ASX ANNOUNCEMENT
2
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 1 – Simplified Geology with deposit and project locations and TG Metals project tenure. Datum: Zone 51 (GDA94).
Van Uden Gold Project
The Company updated the MRE for the Van Uden gold deposit (ASX announcement 16 April 2026)
with a +120% increase in Indicated category Resource ounces. The updated Resource is shown in
Table 1. The total pit constrained MRE now stands at 7.9Mt @ 1.1 g/t Au for 270,800 oz. The deposit
remains open at depth and along strike. Laterite resources were modelled separately to the primary
mineralisation and is shown in Figures 2 and 3.
ASX ANNOUNCEMENT
3
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 2 – Plan view of the Van Uden block model (Laterite excluded) and optimised shell drilling.
ASX ANNOUNCEMENT
4
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 3 – Plan view of the Van Uden Laterite Only block model and optimised shell
Modelling the domains separately enables improved interrogation of the Laterite mineralisation for the
ongoing heap leach study.
ASX ANNOUNCEMENT
5
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Resource and Extensional Drilling Results
During the Quarter the Company received the results from five reverse circulation (RC) reconnaissance
holes drilled along strike of the Van Uden gold deposit (Figure 4). The results reported in ASX
announcement 15 June 2026, were designed to test the potential for resource extensions in large step
out holes. The drillholes intersected gold mineralisation and confirm that the fertile Van Uden shear
continues along a strike of at least a further 1.8km for a total of at least 4.3km. Result highlights include:
• TGGR052 - 6m @ 5.57 g/t Au from 84.0m including 3m @ 10.69 g/t Au from 84.0m
• TGGR148 - 6m @ 0.72 g/t Au from 27.0m
• TGGR149 - 5m @ 0.79 g/t Au from 30.0m
Figure 4 – Van Uden, New Drilling Collars Showing Intercept Highlights and Cross Section
ASX ANNOUNCEMENT
6
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Subsequent to the Quarter end, the Company received results from a 213 hole auger drilling program
(9 July 2026) which successfully confirmed widespread near-surface laterite-hosted gold mineralisation
within previously identified soil anomalies at Van Uden. The rapidly emerging mineralised footprint is
substantially larger than the existing laterite MRE1 footprint (Figure 5).
Figure 5 – Van Uden Laterite, Showing New Auger Drilling Collars, Significant Intercepts and Mineralised Laterite Trends
ASX ANNOUNCEMENT
7
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Van Uden Metallurgy
During the Quarter the Company received results from heap leach testwork conducted on Laterite
samples at Van Uden. The results were reported on 30 April 2026 and 14 May 2026. Three columns
were loaded with agglomerated laterite samples from across the Laterite resource area. Gold recoveries
reached approximately 50% after 15 days, with final recoveries above 90%. The results of the
metallurgical testwork are feeding into the Scoping Study for an onsite heap leach processing on-site at
Van Uden.
The Laterite resources at Van Uden are well suited to onsite heap leaching as evidenced by the rapid
gold recoveries seen in the testwork and the exceptional physical characteristics or the ore. Being located
at surface and requiring no waste stripping, the Laterite presents a low capital cost mining opportunity.
Current Laterite Resource that can be utilised in the heap leach operation is 1.05 Mt @ 0.52 g/t Au for
17,700 ounces (see table 1). A further 1.85 Mt @ 1.05 g/t au for 62,400 ounces (see table 1) in transition
material may also be amenable to heap leach. Further metallurgical testwork will be undertaken to
confirm this.
The heap leaching process supports a significantly lower cut-off grades as the processing cost is far less
than that of a conventional carbon in leach (CIL) plant. The capital required to establish a heap leach are
also much lower. The low capital and operating costs combine to enable the exploitation of the entire
Laterite resource available. Whilst the final results from the column leach testwork are still completing,
mining and processing studies have commenced to determine the optimal mining and pad design
parameters. All these will inform the Scoping Study.
Gold City Exploration
No substantive work was completed at the Gold City prospect during the Quarter.
Lake Johnston Project
During the Quarter, the Company applied for a Mining Lease (M63/0697) over the Burmeister lithium
deposit, Figure 6, ASX announcement 1 June 2026. The Burmeister deposit was previously modelled
from wide spaced drilling to produce an Exploration Target of 15.6Mt – 20.1Mt @ 0.97% - 1.19% Li2O
(see Table 2, ASX announcement 1 May 2024). Extensive metallurgical testwork on drill core samples
have defined pathways to production including the potential for a DSO product from simple crushing
and ore sorting onsite at Lake Johnston.
The Mining lease application advances the development potential at Burmeister with a view to taking
advantage of the current high demand for DSO lithium pegmatite products. The current buoyant DSO
market, with pricing now in the range of US$362/t to US$430/t CIF China for a 1.2% Li2O product,
supports the development focus for the Company’s lithium assets.
Subsequent Events
Subsequent to the end of the Quarter, the Company released auger drilling results as detailed in the
section above, “Resource and Extensional Drilling Results” and reported the execution of its first Ore
Purchase and Profit Share agreement with Medallion Metals Limited, ASX announcement 22 July 2026.
The non-binding agreement is for the processing of approximately 60,000 tonnes of gold-bearing
stockpiles from the Company’s Van Uden Gold Project through the Cosmic Boy Concentrator (CBC)
located approximately 70 kilometres to the south of the Van Uden Gold Project.
Medallion Metals Limited, will first recover its agreed operating costs from processing revenues from
each campaign, with the remaining pre-tax operating profit shared equally (50:50) between Medallion
and TG Metals. Medallion will make provisional payments following completion of each processing
batch, with a final reconciliation undertaken using actual operating costs, metallurgical performance
and gold sales proceeds to determine final payment.
ASX ANNOUNCEMENT
8
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 6 – Location Map showing the Mining Lease application over the Burmeister Lithium Deposit
ASX ANNOUNCEMENT
9
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Van Uden Gold Project Current Resource
Table 1: MRE – Van Uden Gold Deposit
NOTES: The Mineral Resources statement conforms to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
are dry metric tonnes. The laterite portion of the mineralisation has been reported at a cut-off grade of
0.10 g/t Au by area within a A$6,000/oz Au optimised pit shell. All other material types are reported at
a cut-off grade of 0.30 g/t Au by area within a A$6,000/oz Au optimised pit shell based on mining
parameters and operating costs typical for Australian open pit extraction deposits of a similar scale and
geology.
Minor discrepancies may occur due to rounding of appropriate significant figures. The resources comply
with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle in mineral
resource reporting that requires the competent person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
In addition to increased resource confidence via the high conversion to Indicated category resources
and an overall increase in gold ounces to 270,800oz Au, wider spaced drilling was modelled as
“unclassified” and presents immediate upside with further infill drilling. Figure 7 shows the new MRE
and “unclassified” target areas.
Burmeister Exploration Target
Burmeister has an Exploration Target (refer to ASX release 1 May 2024) derived from drilling conducted
by the Company as per Table 2 below.
Tonnes Range
Low
Tonnes Range
High
Li2O Range
Low (%)
Li2O Range
High (%)
15.6 million 20.1 million 0.97 1.19
Table 2 – Exploration Target Range at 0.4% Li2O cutoff
The Exploration Target quantity and grade is conceptual in nature. There has been insufficient
exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the
estimation of a Mineral Resource. The Target is based on the Company’s resource definition drilling
undertaken since discovery in October 2023. The current drill hole density (spacing between holes) at
Burmeister is not considered sufficient to determine a Mineral Resource.
ASX ANNOUNCEMENT
10
JUNE 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
BUSINESS DEVELOPMENT
During the Quarter, a partial surrender tenement E63/1997 was completed and miscellaneous licence
L63/100 was applied for at the Lake Johnston Project and subsequent to the end of the Quarter
miscellaneous licences L77/371 and L77/372 at the Van Uden Project were granted.
The Company continuously assesses opportunities to grow the business and consolidate tenement
positions as they arise.
CORPORATE
TG Metals closed the Quarter with approximately A$0.642 million in cash.
The Company lodged an R & D Tax Rebate in the amount of $262,570 with the refund still pending at
Quarter end.
The Company’s quarterly summary of financials is presented in the Appendix 5B attached.
During the Quarter 649,385 employee performance rights were issued.
The Company currently has 120,530,311 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $318,000 on exploration activities,
associated predominantly with activities undertaken on the Van Uden project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $57,000 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe Investor Relations
Chief Executive Officer Evy Litopoulos
TG Metals Resolve IR
info@tgmetals.com.au evy@resolveir.com
ASX ANNOUNCEMENT
JUNE 2026 QUARTERLY REPORT
_______________________________________________________________
__
11
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in the stable jurisdiction
of Western Australia. The Van Uden Gold Project hosts a JORC 2012 compliant MRE of 7.94 Mt @ 1.1
g/t Au for 270,800 oz (Table 1) on granted mining leases and contains past producing gold mines. The
project is in proximity to operating gold processing Plants. The Lake Johnston Project, hosts the
Burmeister high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding
lithium prospects. Burmeister is in proximity to four lithium processing plants and undeveloped deposits.
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is
a Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited.
Mr Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activities that he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based
on their information in the form and context in which it appears. Mr Selfe considers that the information
in this announcement is an accurate representation of the available data and studies for the Van Uden
Gold Project.
Cautionary Statement
The Company’s activities will be subject to the environmental laws inherent in the mining industry and
in Australia. The Company intends to conduct its activities in an environmentally responsible manner
and in compliance with all applicable laws. However, the Company may be the subject of accidents or
unforeseen circumstances that could subject the Company to extensive liability. The occurrence of any
such environmental incident could delay future production or increase production costs. In addition,
environmental approvals will be required from relevant government or regulatory authorities before
certain activities may be undertaken which are likely to impact the environment, including for land
clearing and ground disturbing activities. Failure or delay in obtaining such approvals will prevent the
Company from undertaking its planned activities. Further, the Company is unable to predict the impact
of additional environmental laws and regulations that may be adopted in the future, including whether
any such laws or regulations would materially increase the Company’s cost of doing business or affect
its operations in any area.
Previously Reported Information
References in this announcement may have been made to certain ASX announcements, including
exploration results, Mineral Resources, Ore Reserves, production targets and forecast financial
information. For full details, refer to said announcement on said date. The Company is not aware of
any new information or data that materially affects this information. Other than as specified in this
announcement and other mentioned announcements, the Company confirms that it is not aware of any
new information or data that materially affects the information included in the original market
announcement(s), and in the case of estimates of Mineral Resources, Ore Reserves, production targets
and forecast financial information that all material assumptions and technical parameters underpinning
the estimates in the relevant announcement continue to apply and have not materially changed other
than as it relates to the content of this announcement. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the
original announcement.
ASX ANNOUNCEMENT
JUNE 2026 QUARTERLY REPORT
_______________________________________________________________
__
12
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
ASX ANNOUNCEMENT
JUNE 2026 QUARTERLY REPORT
_______________________________________________________________
__
13
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 June 2026
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Exploration Licences
E63/1961 14 BL 05/11/2019 04/11/2029 100% No change
E63/1973 16 BL 16/01/2020 15/01/2030 100% No change
E63/1997#
22 BL 27/10/2020 26/10/2030 100% No change
E63/2324 9 BL 05/12/2025 04/12/2030 100% No change
E63/2349 20BL 02/02/2024 01/02/2029 100% No change
E63/2434* 6 BL Pending N/A 100% No change
E63/2489 1BL 02/05/2025 01/05/2030 100% No change
E63/2490 1BL 02/05/2025 01/05/2030 100% No change
E63/2523 5 BL 27/02/2026 26/02/2031 100% No change
E77/3272 2BL 17/04/2025 16/04/2030 100% No change
E77/1535 10BL 15/03/2011 14/03/2027 80% No change
E77/1582 1BL 01/02/2010 13/01/2028 80% No change
E77/1361 19BL 15/03/2011 14/03/2027 80% No change
Prospecting Licenses
P63/2201 176.52 HA 03/11/2020 02/11/2028 100% No change
P63/2202 193.69 HA 16/01/2020 02/11/2028 100% No change
P77/4701 74.29 HA 27/10/2025 26/10/2029 100% No change
*Tenement Application
#
Partial Surrender
@
Subsequent to the end of the quarter
ASX ANNOUNCEMENT
JUNE 2026 QUARTERLY REPORT
_______________________________________________________________
__
14
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 30 June 2026 (Continued)
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Mining Leases
M77/477 620.95 HA 31/08/1990 30/08/2032 80% No change
M77/478 620.3 HA 31/08/1990 30/08/2032 80% No change
M77/522 529.15 HA 11/10/1991 10/10/2033 80% No change
M77/523 449.15 HA 11/10/1991 10/10/2033 80% No change
Miscellaneous Licenses
L77/271 12.73 HA 04/07/2018 03/07/2039 100% No change
L77/299 4.53 HA 10/11/2021 09/11/2042 100% No change
L77/371@ 1.00 HA 22/07/2026 21/07/2047 100% 100%
L77/372@ 4.00 HA 07/07/2026 06/07/2047 100% 100%
L63/100* 2425 HA Pending N/A 100% 100%
*Tenement Application
@
Subsequent to the end of the quarter
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN Quarter ended (“current quarter”)
40 644 621 830 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(4) (26)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (261) (1,073)
(e) administration and corporate costs (209) (1,016)
1.3 Dividends received (see note 3) - -
1.4 Interest received 3 25
1.5 Interest and other costs of finance paid (1) (5)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - 388
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(472) (1,707)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - (61)
(d) exploration & evaluation (314) (4,450)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - 46
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(314) (4,465)
3. Cash flows from financing activities
- 6,600
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (466)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – Lease payments (14) (55)
3.10 Net cash from / (used in) financing
activities
(14) 6,079
4. Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (12
months)
$A’000
4.1 Cash and cash equivalents at beginning of
period
1,442 735
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(472) (1,707)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(314) (4,465)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(14) 6,079
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
642 642
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 627 1,427
5.2 Call deposits 15 15
5.3 Bank overdrafts - -
5.4 Other – Term Deposits - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
642 1,442
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (472)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(314)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (786)
8.4 Cash and cash equivalents at quarter end (item 4.6) 642
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total ava