HIGHLIGHTS
■ Updated Van Uden gold resource of 270,800 ounces
■ Drilling at Van Uden continues to deliver broad high grade results
■ New discovery 550m south of the Van Uden resource
■ Patent application filed for lithium processing and recovery methods
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 31 March 2026 (Quarter), during which the Company progressed the advanced Van
Uden Gold Project (the Project) in the Forrestania Region of WA and advanced the Lake Johnston
Lithium Project, Figure 1.
Activities for the Quarter included:
• Reverse Circulation (RC) drilling results from the 2025 drill campaign at Van Uden defining
thick high grade intercepts, closing gaps in the resource and extending down dip (ASX
Announcements 12 January 2026, 4 February 2026 and 16 February 2026)
• RC drilling results south of Van Uden, discovering new mineralisation 550m beyond the
modelled resource, interpreted to be the continuity of the Van Uden shear zone (ASX
Announcement 20 January 2026)
• Patent application filed for enhanced lithium recovery (ASX Announcement 9 February 2026)
for the Burmeister metallurgical flowsheet. The hybrid flowsheet will benefit from the application
of this technology developed by the Company, increasing recoveries of spodumene to
concentrates.
• Post end of the March Quarter the Van Uden MRE was updated with a significant increase of
over 120% in the Indicated category and an overall increase in ounces to 270,800 ounces Au,
see Table 1 (ASX Announcement 16 April 2026). The new MRE sets the Company up for Mine
designs and the assessment of development pathways for the Van Uden Gold Project.
.
ASX ANNOUNCEMENT
2
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 1 – Simplified Geology with deposit and project locations and TG Metals project tenure. Datum: Zone 51 (GDA94).
Van Uden Drilling
The Company received all assays from within the Van Uden resource envelope from the extensive RC
drilling campaign completed in the December quarter. The purpose of infill drilling was to increase the
classification of the Resource model, extensional drilling both down dip and along strike to expand the
size of the Resource model and exploration drilling beneath gold in soil anomalies. All aims were
achieved and the updated MRE was reported post the end of the Quarter.
ASX ANNOUNCEMENT
3
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 2 shows the location of drill holes drilled this campaign at Van Uden for resource expansion and
Infill, and the previous 2025 MRE outline.
Figure 2 – Resource drilling showing select intercept highlights and drillholes pending assays as at 16 February 2026.
Figure 3 shows the cross section through the drilled areas in Van Uden South, historically known as
Zeehan. This area shows similarities to the high-grade Tasman pit, last mined in the late 1990’s and
has seen no previous mining activity. The deepest drillhole in this southern region, TGGR119 (same
as TGGRD119) has intercepted 13m @ 2.23 g/t Au from 181m downhole and ended in mineralisation.
This drillhole was extended with a diamond core tail towards the mafic-sediments contact and
effectively intercept the footwall lode. This diamond drill core is also being logged for geotechnical
purposes, with assay results pending. The gold mineralisation in this southern area steepens up,
coinciding with a steepening of the basalt-sediments contact. This contrasts with the far north where
the mineralisation is much flatter, however no drilling has been completed easterly enough and deep
enough to encounter a steepening of the contact in the north.
ASX ANNOUNCEMENT
4
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 3 – Cross Section A-A’ Showing new drilling, historical drilling and the Van Uden mineralisation envelope
Strong gold mineralisation continues at depth reinforcing the continuity of the Van Uden mineralisation
and robust characteristics of the hoist Van Uden shear.
Resource and Extensional Drilling Results
Drilling results not included in the previous quarterly report for resource infill and extensional drilling
from the Northern, Central and Southern areas of Van Uden were reported in ASX releases 4 February
2026 and 16 February 2026. Highlights are summarised below:
Northern Area drilling highlights:
• 13m @ 1.48 g/t Au from 18.0m
• 10m @ 1.75 g/t Au from 44.0m
• 5m @ 2.94 g/t Au from 44.0m
• 5m @ 2.60 g/t Au from 84.0m
Central Area drilling highlights:
• 13m @ 2.26 g/t Au from 48.0m
• 11m @ 1.95 g/t Au from 12.0m
• 12m @ 1.62 g/t Au from 15.0m
ASX ANNOUNCEMENT
5
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Southern Area drilling highlights:
• 30m @ 1.60 g/t Au from 43.0m and 4m @ 1.10 g/t Au from 88.0m
• 15m @ 2.22 g/t Au from 86.0m and 2m @ 1.14 g/t Au from 123.0m
• 13m @ 2.48 g/t Au from 125.0m and 6m @ 0.94 g/t Au from 158.0m
• 13m @ 2.23 g/t Au from 181.0m and 3m @ 0.97 g/t Au from 197.0m
As reported in the December Quarterly report as a subsequent event, assay results were received for
reverse circulation (RC) drilling completed 550m to the south of Van Uden intercepting 11m @ 1.90 g/t
Au from 65m down hole (ASX announcement 20 January 2026). This result adds to the now 7km of
mineralised Van Uden shear with drillhole assays still pending to the southernmost tenement boundary.
Figure 4 shows the cross section through the discovery drilling and Figure 5 shows the location of this
drilling which targeted gold in soil anomalies defined from results reported 9 September 2025 and
anomalies within historical drillholes which failed to reach the newly discovered gold zones.
Figure 4 – Cross Section D-D’ Showing New Drilling, Historical Drilling and interpreted Mineralisation Envelope for the new
discovery 550m south of Van Uden (see Figure 5 for location)
ASX ANNOUNCEMENT
6
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 5 – Exploration Drilling Collars Showing Select Intercept Highlights (New Results in Yellow) and Pending Assay Drillholes
marked yellow collars and the Van Uden Gold Trend
ASX ANNOUNCEMENT
7
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Gold City Exploration
During the Quarter, further infill soil sampling was conducted at the Gold City prospect to follow-up the
wide spaced soil program conducted in the December quarter. Also, the apparent north east trend soil
anomaly, revealed from drilling also conducted in the December quarter, was infill soil sampled with
results pending. Figure 6 shows the area of infill sampling conducted. Gold City is an important satellite
prospect for the overall Van Uden Gold Project, with a potential 1200m gold trend open for drilling.
Figure 6 – Soil sampling results at Gold City
1200m
ASX ANNOUNCEMENT
8
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Lake Johnston Project
During the Quarter, the Company applied for a provisional patent application with IP Australia (ASX
announcement 9 February 2026). The patent application is for the Company’s proprietary enhanced
recovery of spodumene concentrate technology, from lithium pegmatite mineralisation at the
Burmeister deposit at its Lake Johnston Project (Burmeister or the Project) in WA. The patent
application secures the intellectual property rights for TG Metals enhanced metallurgical flowsheet for
the recovery of spodumene concentrate from an integrated DMS (dense media separation) and
flotation process.
The technology can be applied to other mineralisation sources providing commercial opportunities
through future royalty streams or licensing arrangements.
Subsequent Events
Subsequent to the end of the Quarter, the Company released an updated MRE for Van Uden (ASX
announcement 16 April 2026). The updated MRE takes in all historical drilling and new drilling
conducted by the Company since acquisition in March 2025. Continuity of the Van Uden gold deposit
has materially improved with previous gaps in the model, drilled and filled along the entire 2.5km strike.
The Indicated category increased by more than 120% in resource ounces which allows the
advancement of mining studies for near term production potential. The Laterite component has been
modelled separately with a view to exploitation via low cost heap leach technology onsite. The full
updated MRE is stated in Table 1 below:
Van Uden Gold Project Current Resource
Table 1: MRE – Van Uden Gold Deposit
NOTES: The Mineral Resources statement conforms to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
are dry metric tonnes. The laterite portion of the mineralisation has been reported at a cut-off grade of
0.10 g/t Au by area within a A$6,000/oz Au optimised pit shell. All other material types are reported at
a cut-off grade of 0.30 g/t Au by area within a A$6,000/oz Au optimised pit shell based on mining
parameters and operating costs typical for Australian open pit extraction deposits of a similar scale and
geology.
Minor discrepancies may occur due to rounding of appropriate significant figures. The resources comply
with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle in mineral
resource reporting that requires the competent person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
In addition to increased resource confidence via the increase in Indicated category resources and an
overall increase in gold ounces to 270,00oz Au, wider spaced drilling was modelled as “unclassified”
and presents immediate upside with further infill drilling. Figure 7 shows the new MRE and
“unclassified” target areas.
ASX ANNOUNCEMENT
9
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Figure 7 – Plan view of the Van Uden block model (Laterite excluded) and optimised shell
ASX ANNOUNCEMENT
10
MARCH 2026 QUARTERLY REPORT
_________________________________________________________________
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
BUSINESS DEVELOPMENT
During the Quarter, extensions were granted to E63/1973 following a compulsory partial surrender in
the Lake Johnston Project and E77/1582 at the Van Uden Project. In addition, tenement E63/2523 was
granted at the Lake Johnston project.
The Company continuously assesses opportunities to grow the business and consolidate tenement
positions as they arise.
CORPORATE
TG Metals closed the Quarter with approximately A$1.442 million in cash.
The Company applied for and lodged an R & D Tax Rebate in the amount of $262,570. This is expected
to be refunded to the Company’s account in the June 2026 Quarter.
The Company’s quarterly summary of financials is presented in the Appendix 5B attached.
The Company issued 2,000,000 advisory options exercisable at $0.33 expiring 30 January 2029 during
the Quarter.
During the Quarter 649,385 employee performance rights lapsed.
The Company currently has 120,530,311 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $1,658,000 on exploration activities,
associated predominantly with activities undertaken on the Van Uden project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $57,000 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe Investor Relations
Chief Executive Officer Evy Litopoulos
TG Metals Resolve IR
info@tgmetals.com.au evy@resolveir.com
ASX ANNOUNCEMENT
MARCH 2026 QUARTERLY REPORT
_______________________________________________________________
__
11
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in the stable jurisdiction
of Western Australia. The Van Uden Gold Project hosts a JORC 2012 compliant MRE of 7.94 Mt @ 1.1
g/t Au for 270,800 oz (Table 1) on granted mining leases and contains past producing gold mines. The
project is in proximity to operating gold processing Plants. The Lake Johnston Project, hosts the
Burmeister high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding
lithium prospects. Burmeister is in proximity to four lithium processing plants and undeveloped deposits.
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activities
that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe
has consented to the inclusion in this report of matters based on their information in the form and
context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, and performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
ASX ANNOUNCEMENT
MARCH 2026 QUARTERLY REPORT
_______________________________________________________________
__
12
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 31 March 2026
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Exploration Licenses
E63/1961 14 BL 05/11/2019 04/11/2029 100% No change
E63/1973^ 16 BL 16/01/2020 15/01/2030 100% No change
E63/1997 37 BL 27/10/2020 26/10/2030 100% No change
E63/2324 9 BL 05/12/2025 04/12/2030 100% No change
E63/2349 20BL 02/02/2024 01/02/2029 100% No change
E63/2434* 6 BL Pending N/A 100% No change
E63/2489 1BL 02/05/2025 01/05/2030 100% No change
E63/2490 1BL 02/05/2025 01/05/2030 100% No change
E63/2523+ 5 BL 27/02/2026 26/02/2031 100% No change
E77/3272 2BL 17/04/2025 16/04/2030 100% No change
E77/1535 10BL 15/03/2011 14/03/2027 80% No change
E77/1582^ 1BL 01/02/2010 13/01/2028 80% No change
E77/1361 19BL 15/03/2011 14/03/2027 80% No change
Prospecting Licenses
P63/2201 176.52 HA 03/11/2020 02/11/2028 100% No change
P63/2202 193.69 HA 16/01/2020 02/11/2028 100% No change
P77/4701 74.29 HA 27/10/2025 26/10/2029 100% No change
*Tenement Application
^Extension Granted
+Tenement Granted
ASX ANNOUNCEMENT
MARCH 2026 QUARTERLY REPORT
_______________________________________________________________
__
13
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Tenement Schedule as at 31 March 2026 (Continued)
Tenement Area Grant Date Expiry Date
Entity’s Interest
at Quarter End
Change in Entity’s
interest during Quarter
Mining Leases
M77/477 620.95 HA 31/08/1990 30/08/2032 80% No change
M77/478 620.3 HA 31/08/1990 30/08/2032 80% No change
M77/522 529.15 HA 11/10/1991 10/10/2033 80% No change
M77/523 449.15 HA 11/10/1991 10/10/2033 80% No change
Miscellaneous Licenses
L77/271 12.73 HA 04/07/2018 03/07/2039 100% No change
L77/299 4.53 HA 10/11/2021 09/11/2042 100% No change
L77/371* 1.00 HA Pending N/A 100% No change
L77/372* 4.00 HA Pending N/A 100% No change
*Tenement Application
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN Quarter ended (“current quarter”)
40 644 621 830 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(4) (22)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (263) (812)
(e) administration and corporate costs (218) (807)
1.3 Dividends received (see note 3) - -
1.4 Interest received 4 22
1.5 Interest and other costs of finance paid (1) (4)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - 388
1.8 Other - -
1.9 Net cash from / (used in) operating
activities
(482) (1,235)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment - (61)
(d) exploration & evaluation (1,654) (4,136)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - 46
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(1,654) (4,151)
3. Cash flows from financing activities
- 6,600
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (466)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – Lease payments (14) (41)
3.10 Net cash from / (used in) financing
activities
(14) 6,093
4. Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (9
months)
$A’000
4.1 Cash and cash equivalents at beginning of
period
3,592 735
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(482) (1,235)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(1,654) (4,151)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(14) 6,093
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
1,442 1,442
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,427 3,577
5.2 Call deposits 15 15
5.3 Bank overdrafts - -
5.4 Other – Term Deposits - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,442 3,592
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (482)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,654)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (2,136)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,442
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 1,442
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.68
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
No. The Company has completed the majority of the drilling required and expects to have
substantially reduced cash outflows for the June Quarter.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Yes. The Company expects to receive an R&D rebate of approximately $260K during the
June 2026 Quarter. In addition, the Company believes it will be able to raise further equity or
debt, if and as required, as demonstrated by the successful completion of previous
placements.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes, the Company expects to be able to continue its operations and meet its business
objectives based on its responses to items 1 and 2 above.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 28 April 2026
Authorised by: .........By the Board..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity
Share your feedback
Discover