Investor Presentation - Van Uden Gold Project
Released
Released
Announcement PDF
ADVANCED GOLD EXPLORATION PROJECT
ACQUISITION
VAN UDEN GOLD PROJECT
Western Australia
March 2025
ASX:TG6
DISCLAIMER
This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment
or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation
has been prepared without taking into account the investment objectives, financial situation or particular needs of any
particular person. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or
correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent permitted by
law, none of TG Metals Limited, its directors, employees or agents, not any other person accepts any liability, including,
without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information contained
in this presentation. In particular, no representation or warranty, express or implied is given as the accuracy, completeness or
correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation
nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to
significant uncertainties and contingencies. No representation is made that, in relation to the tenements the subject of this
presentation, TG Metals has now or will at any time in the future develop further resources or reserves within the meaning of
the Australian Code for Reporting of Exploration Results, Mineral resources and Ore Reserves (The JORC Code).
Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an
investment is appropriate in light of your particular investment needs, objectives and financial circumstances. You should have
consideration to the risks involved in investment in TG Metals Limited. By accepting this presentation, the recipient represents
and warrants that it is a person to whom this presentation may be delivered or distributed without a violation of the laws of
any jurisdiction.
This presentation is not to be disclosed to any other person or used for any other purpose and any other person who receives
this presentation should not rely or act upon it. Information contained in this presentation is confidential information and the
property of TG Metals Limited. It is made available strictly for the purposes referred to above. The presentation and any
further confidential information made available to any recipient must be held in complete confidence and documents
containing such information may not be reproduced, used or disclosed with the prior written consent of TG Metals Limited.
The material contained in this presentation does not constitute or contain an offer or invitation to subscribe for or purchase
any securities in TG Metals nor does it constitute an inducement to make an offer or invitation with respect to those
securities. No agreement to subscribe for or purchase securities in TG Metals will be entered into on the basis of this
presentation.
COMPETENT PERSONS STATEMENT
Information in this presentation that relates to exploration results, exploration targets, geology, drilling and mineralisation is
based on information compiled by Mr David Selfe who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr
Selfe has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to
the activities that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe has consented to the inclusion in this
presentation of matters based on their information in the form and context in which it appears. Mr Selfe considers that the
information in this presentation is an accurate representation of the available data and studies for the Van Uden Gold Project.
FORWARD LOOKING STATEMENT
This presentation contains certain statements that may constitute “forward looking statement”. Such
statements are only predictions and are subject to inherent risks and uncertainties, which could cause
actual values, results, performance achievements to differ materially from those expressed, implied or
projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by, the
forward-looking information and statements. These risks and uncertainties include, but are not limited to:
(i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits
and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves, grade,
planned mining dilution and ore loss, or recovery rates and changes in project parameters as plans
continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
CAUTIONARY STATEMENT – VISUAL ESTIMATES
This presentation contains references to visual results and visual estimates of mineralisation. The Company
draws attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should
never be considered a proxy for laboratory analyses where concentrations or grades are the factor of
principal economic interest. Visual estimates also potentially provide no information regarding impurities
or deleterious physical properties relevant to valuations.
2
REVIVING FORRESTANIA’S GOLD LEGACY
The Acquisition – 80% interest in granted mining leases &
exploration licences. Remaining 20% held by regional gold producer
Existing 2004 JORC MRE of 238koz Au @ 1.38g/t* – Plan to
complete and subsequently update JORC 2012 MRE
Previous Operating Mines – Tenure includes previous operating
mines, with proven gold endowment, in an established mining region
Strategic Location with Existing Infrastructure – Access to essential
infrastructure (power/water), skilled workforce and sealed road
access to nearby gold processing facilities
Near-Term Cash Flow Potential – Existing stockpiles and waste
dumps to be assessed for near term production potential in a time of
record gold prices
Upcoming Catalysts – Economic assessment of stockpiles,
delineation of JORC 2012 MRE following review of historical drilling
*Refer to TG6 ASX Announcement dated 6 March 2025 and Slide 7
3
VAN UDEN GOLD PROJECT – A HIGH-GRADE ASSET WITH STRONG UPSIDE
▪ High-Grade Open Pit Gold Asset –
Advanced project with historic open
pit production at >2.5g/t Au
▪ Exploration Upside – Historic
drilling only to 150m, providing
exploration upside down dip and
along +2km strike
▪ Walk up drill ready targets - provide
further strong potential for resource
expansion
▪ Strategic Synergies – Added value
from proximity to Lake Johnston
Lithium Project
Historic Mining Legacy – Previously mined in the late 1990s during low gold prices
A NEW CHAPTER IN A PROVEN MINING REGION
4
TRANSACTION OVERVIEW*
Acquisition Consideration**
Total Consideration
Key Transaction Terms
$4M
Agreement
Binding Sale and Purchase Agreement (SPA) executed
with Montague Resources Pty Ltd to acquire an 80%
interest in the Van Uden Gold Project.
Remaining 20% owned by Barto Gold
Project
Management
TG Metals manager of Project and responsible for
day-to-day operations
Impact of TG
Metals
Acquisition does not constitute a change in the nature
and scale of TG Metals' activities, as it represents an
increase of less than 25% to the Company’s total
consolidated assets, total equity, and budgeted
expenditure for the next 12 months
Shareholder
Approval
As per the stated impact on TG Metals, no
shareholder approval is required
($3M cash plus $1M TG6 FPO shares)
Payment at Completion
A$2.5M Cash
A$1M FPO Shares
at premium to market (A$0.175/sh)
Deferred Payment
A$0.5M cash
payable 12 months post completion
**Acquisition subject to satisfaction of conditions precedent considered typical of transactions
of this nature and are detailed in the TG6 ASX announcement dated 6 March 2025
Cash at Bank
Current Post Transaction
$2.8M
$5.3M
Shares on Issue
71.1M
($500k deferred)
76.8M
*Refer to TG6 ASX Announcement dated 6 March 2025
5
PROJECT OVERVIEW
▪ Strategic Location – Situated in Forrestania Greenstone
Belt, in proximity to TG6's Lake Johnston Project
▪ Proximity to Processing Facilities – Trucking distance on
sealed roads to Marvel Loch and Edna May (Westonia)
gold processing Plants
▪ Established Infrastructure – including access to
essential utilities (power/water)
▪ Secure Tenure – Four granted mining leases with no
Native Title claims, plus three exploration licenses and
miscellaneous haul road licences
▪ Large-Scale Gold System – +2km drilled strike with gold
near surface and two historic pits, defined deposits and
walk up drill targets
Near Processing Infrastructure
6
VAN UDEN PROJECT – HISTORIC 2004 JORC RESOURCE*
Category
Measured
Indicated
Inferred
Total
Tonnes
(Mt)
0.326
1.601
3.451
5.378
Grade
(g/t)
1.7
1.5
1.28
1.38
Contained Metal
(koz Au)
18.0
78.0
142.0
238.0
The MRE are historical and are not reported in accordance with the JORC Code
2012. A competent person has not done sufficient work to classify the historical
estimate as mineral resources in accordance with the JORC Code 2012 and it is
uncertain that following evaluation and/or further exploration work that the historical
estimates will be able to be reported as a MRE in accordance with the JORC Code
2012. Nothing has come to the attention of TG Metals that is cause to question the
accuracy or reliability of the MRE completed by Montague however, TG Metals has
not independently validated the MRE and therefore is not to be regarded as
reporting, adopting or endorsing this MRE.
Image adapted from Kidman Resources Ltd (ASX:KDR) ASX announcement 18 December 2015
*Refer to TG6 ASX Announcement dated 6 March 2025
7
VAN UDEN PROJECT – TASMAN OPEN PIT
HIGH GRADE AT SHALLOW DEPTHS
▪ Previous small-scale mining to less than 30m depth produced 136,023t @ 2.54g/t Au for 11,142oz Au*
▪ Mineralisation within pit floors (pit depth approx. 30m) and extending down dip and open
IMMEDIATE FOCUS
▪ New geological and resource
models to accommodate
higher gold price environment
▪ Remnant surface stockpiles
may offer early cash
opportunity
▪ New drilling to be
incorporated in a JORC 2012
MRE
*Refer to TG6 ASX Announcement dated 6 March 2025
Cross Section through Tasman Pit, Van Uden Group deposit
8
VAN UDEN PROJECT – DIEMENS OPEN PIT
HIGH GRADE AT SHALLOW DEPTHS
▪ Previous small-scale mining, poorly documented
▪ Mineralisation within pit floors (pit depth less than 30m) and extending down dip and open
NEAR-TERM POTENTIAL
▪ Evaluate extensive
near-surface laterite
mineralisation
▪ Remnant surface
stockpiles may offer
early cash
opportunity
▪ New drilling to be
incorporated in a
JORC 2012 MRE
Cross Section through Diemens Pit
9
GOLD CITY PROSPECT
▪
▪
▪
▪
Previous small scale mining – no historic production records
Multiple gold lodes defined by drilling
Opportunity for additional drilling to define initial resource – open at depth and along strike
Potential for value adding incremental discoveries
OPEN DOWN
DIP, AND
ALONG
STRIKE
Contains 1950’s workings along known gold trends
10
VALUE PROPOSITION
- STRATEGIC FIT AND SYNERGIES
Dual Commodity Strength – Diversifies risk through gold & lithium exposure, maximising
market opportunities
Strategic Expansion – Van Uden Gold adds a second high-value asset alongside Lake
Johnston Lithium
Fast-Track Potential – Granted mining leases, established haul roads and nearby gold
Plants provide near-term production potential
Exploration Upside – Gold system open along strike and down dip with strong growth
potential and secondary deposit opportunities
Regional Synergies – Located 100km from Lake Johnston, providing the ability to leverage
logistics, personnel and infrastructure
Market Advantage – Gold at record highs, positioning the project for immediate value
creation for TG6 shareholders
11
NEXT STEPS
Define 2012 JORC
Compliant Resource
Exploration
Plans
Near-Term
Production
• Database Review – Validate and
compile historical drilling data
• Resource Estimation – Integrate
existing and new drill data to define a
JORC 2012 compliant resource
• Bulk Density Test Work – To support
the JORC 2012 MRE
• Independent Assessment – Engage
Consultants to ensure JORC
compliance
• Sample & Assess Historic Surface
Dumps
• Priority Drill Targets – Focus on highgrade extensions at Van Uden Group &
Gold City
• Drilling Campaign – Planning and
approvals for RC and diamond drilling
to confirm continuity and depth
extensions
• Stockpile Evaluation – Assess scale,
grade, and recoverability of remnant
material for economic production
• Permitting Approvals – Secure
necessary regulatory approvals
• Production Pathway – Assess rapid
development cash flow generation
12
ASX:TG6 | tgmetals.com.au
THANK YOU
FOR MORE INFORMATION
David Selfe – CEO
Email: dselfe@tgmetals.com.au
Richard Bevan - Chairperson
Email: rbevan@tgmetals.com.au
Share your feedback