$4m Placement to Fund Rapid Growth at Van Uden Gold Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 22 SEPTEMBER 2025
$4 MILLION PLACEMENT TO RAPIDLY EXPAND
THE RESOURCE AT THE VAN UDEN GOLD PROJECT
Highlights
■
Firm commitments received to raise A$4 million in a Placement
■
Strong support from new institutional and sophisticated investors
■
Together with existing cash, the Company will emerge well funded with
circa $6.5 million in cash to rapidly advance the Van Uden Gold Project
located in the highly prospective Forrestania Greenstone Belt in WA
■
Funds to be used to accelerate resource and exploration drilling at Van
Uden with one rig currently drilling on site and a second rig to
commence shortly
■
There is significant potential to grow the Resource1 at Van Uden which
remains open along strike and at depth
■
Recent exploration has more than doubled the mineralised strike at Van
Uden to 6.5kms, providing multiple new growth targets outside of the
existing Resource1
TG Metals Limited (“TG Metals” or the “Company”) is pleased to announce that it has
received firm commitments for a placement of 18.18 million new fully paid ordinary shares at
$0.22 per share (“Placement Shares”) to raise $4 million before costs (“Placement”). The
Placement was strongly supported by a range of institutional and sophisticated investors.
Together with existing cash, the Company will emerge with approximately $6.5m in cash to
rapidly advance the highly prospective Van Uden Gold Project, strategically located on the
Forrestania Greenstone belt.
Funds from the Placement will be used to accelerate drilling programs:
•
to infill and extend the Van Uden Deposit with a view to upgrading the existing Van Uden
MRE 1;
•
accelerate exploration of the 6.5km gold in soil anomaly along the Van Uden shear as
first reported in ASX announcement 9 September 2025;
1.
See Table A “Van Uden Gold Project Description”
ASX ANNOUNCEMENT
I
RELEASED 22 SEPTEMBER 2025
________________________________________________________________
•
a maiden drilling program at the Gold City Prospect; and
•
the advancement of the Van Uden historical stockpiles treatment opportunity and
general working capital.
TG Metals’ Chairperson, Richard Bevan, commented:
“We are delighted with the strong support received for this placement, which was significantly
oversubscribed and demonstrates continued investor confidence in TG Metals and our highly
strategic Van Uden Gold Project. We welcome our new shareholders.
There are opportunities to add value to the Van Uden Project through resource infill and
extensional drilling programs, as well as the new strike extensions recently identified. Our
location in the highly prospective and underexplored Forrestania Greenstone Belt, proximal
to nearby mills, adds another layer of value to the asset. The capital raised will allow us to
accelerate our drilling programs, which includes assessing the potential of Gold City.
We are excited at the growth opportunities in front of the Company at a time of record high
gold prices.”
Placement
A total of 18,181,819 Placement Shares will be issued to raise $4.0 million (before costs). The
issue of the Placement Shares will be subject to shareholder approval at a meeting to be held
as soon as practicable. The Placement Shares will rank equally with existing ordinary shares
from the date of issue.
A notice of general meeting pertaining to the approvals sought by the Company for the issue
of the Placement Shares, along with further information in respect of the Placement, will be
dispatched to Company shareholders in due course, with the meeting expected to be held in
late October.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX ANNOUNCEMENT
I
RELEASED 22 SEPTEMBER 2025
________________________________________________________________
Van Uden Gold Project Description
The Project is located on the Forrestania Greenstone Belt, 90km east-northeast of Hyden and
120km south of Southern Cross. It is close to the Marvel Loch (producing) and Westonia Edna May (care & maintenance) gold processing Plants and is 130km from the Company’s
established Burmeister lithium deposit at the Lake Johnston Project.
Van Uden Gold consists of an Indicated and Inferred Mineral Resource as per Table A below
on four granted mining leases, four granted exploration licences, one exploration licence
application and two miscellaneous licences (for haul roads). The Project lies to the west of the
Mt Holland lithium mine, south of the operating Marvel Loch gold Plant, and southeast of the
Edna May gold Plant.
Mineral Resource Estimate for the Van Uden Gold Deposit - May 2025
Indicated
Inferred
Total
Grade
Grade
Grade
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz)
Tonnes
Laterite
234,000
0.9
6,940
525,000
0.7
11,800
759,000
0.7
18,740
Oxide
867,000
1.2
34,200 1,141,000
1.0
38,200 2,008,000
1.0
72,400
Transitional
291,000
1.1
10,700
770,000
1.1
26,500 1,061,000
1.1
37,200
Fresh
318,000
1.6
16,500 2,207,000
1.2
82,300 2,525,000
1.2
98,800
Total
1,710,000
1.2
68,340 4,643,000
1.2 158,800 6,353,000
1.1 227,140
Material
Table A: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. It has been reported
at a cut-off grade of 0.35 g/t Au by area within a A$5,000/oz Au optimised pit shell based on mining parameters
and operating costs typical for Australian open pit extraction deposits of a similar scale and geology. Minor
discrepancies may occur due to rounding of appropriate significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle
in mineral resource reporting that requires the qualified person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium
assets at its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in
the stable jurisdiction of Western Australia. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium
prospects. Burmeister is in proximity to four lithium processing plants and undeveloped
deposits. The Van Uden Gold Project contains past producing gold mines and is in proximity
to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
Share your feedback
Discover