High Grade Nickel Mineralisation at Lake Johnston Project
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 6 SEPTEMBER 2023
High Grade Nickel Mineralisation at
Lake Johnston Project
Highlights
■
Phase One aircore drill program delivers high grade nickel of up to
3.23% Ni
■
Majority of drill holes encountered significant nickel mineralisation
■
Numerous +1% Ni intercepts up to 13m thick
■
Metallurgical testwork on drill samples to define potential for on-site
beneficiation processing
■
RC drill rig now commenced nickel sulphide drilling
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to provide the results
of the initial aircore drilling program conducted in August on the Burmeister nickel laterite
prospect at the Lake Johnston Ni-Li-Au Project (Figure 1).
Phase One Aircore Drilling Program Results
Aircore drilling on our Burmeister nickel laterite deposit has yielded numerous high grade
intercepts of +1% Ni and up to 3.23% Ni. Highlights include:
•
TGAC0027 from 18m to 31m, 13m @ 1.12% Ni
•
TGAC0024 from 17m to 23m, 6m @ 1.27% Ni
•
TGAC0017 from 20m to 22m, 2m @ 1.43% Ni
•
TGAC0011 from 28m to 29m, 1m @ 3.23% Ni
The drilling is widely spaced, effectively testing a large area of nickel laterite mineralisation,
with a future proposed infill drilling (Phase Two) required to better define the continuity of this
mineralisation.
A total of 9 out of 36 drill holes encountered high grade nickel mineralisation above 1% Ni. 23
out of 36 drillholes returned significant mineralization above 0.5% Ni. Figure 2 shows the
drilling location plan, highlighting holes which returned high grade intercepts. Table A shows
the significant intercepts above 0.5% Ni. This lower threshold is considered to have potential
for beneficiation upgrade, which will be tested by near term metallurgical testwork.
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
TG Metals CEO, Mr. David Selfe stated; “This initial aircore drilling program was designed
to evaluate the presence of high grade nickel within the laterite profile. The results have
exceeded our expectations and yielded valuable insights into factors influencing the +1% high
grade nickel laterite mineralisation. This mineralisation has the potential to serve as direct feed
for third party laterite nickel processing facilities.
We are also keen to potentially take advantage of the extensive lower grade material, with the
aim of identifying an initial resource that may perform favourably to an on-site beneficiation upgrade.”
Discussion of Results
The intent of the Phase One aircore drilling on our Burmeister nickel laterite deposit was to
test for high grade potential direct trucking ore (+1% Ni) and to provide sample for simple
beneficiation metallurgical testwork. A total of 967 metres was drilled from 36 holes. The
drilling has uncovered a very high grade intercept of 3.23% Ni from 28 metres to 29 metres
downhole (vertical drillhole). Examination of the drill cuttings has revealed abundant fine
grained chlorite, which is a mineral trap for nickel in weathered environments. The likely
source for the chlorite development is a structural control such as a shear zone. This is
encouraging for the discovery of further high grades in the vicinity of structural trends. This
ore type is easily visually identified by its distinctive olive green coloration and fine grained
chlorite.
Wider intercepts of +1% Ni, as shown in Table A and the cross sections Figures 3, 4 and 5,
are a typical laterite profile of limonite, minor smectite and saprolite, that would readily form
feed stock into a high pressure acid leach processing plant. These intercepts will be assessed
for direct trucking ore potential. The remainder of the sample intervals in Table A, which are
above 0.5% Ni cutoff, will be assessed for beneficiation by metallurgical testwork. As can be
seen by the number of intercepts above 0.5% Ni there is abundant material from which to
complete this processing testwork.
The thickness of the mineralised intersections (2 metres and greater) are encouraging. The
majority of the laterite profile presents as dry soft clays.
High grade mineralisation is open to the north, south and to the east. Mineralisation is
expected to terminate to the east at the ultramafic footwall boundary which remains untested
at this stage. Further infill drilling will be required to determine the extents and continuity of
the mineralisation.
Next Steps
Whilst the RC drilling on the nickel sulphide targets continues (ASX announcement 8 August
2023), planning for infill Phase Two aircore drilling has commenced, with permitting already
in place. The focus of Phase Two will be defining mineralised tonnages for both high grade
and benefiable (lower grade) material. Samples taken from the Phase One program will be
lithologically assessed and composited for metallurgical testwork, specifically looking at
simple beneficiation techniques that can be applied at the Lake Johnston Project.
Permitting for first drilling on the lithium soil targets is in its final stages of assessment. Drilling
will commence on the lithium targets (ASX announcement 10 July 2023) as soon as the
Program of Works is approved.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Figure 1 – Simplified Geology of the Lake Johnston Project with prospect locations Datum: AMG
Zone 51 (GDA94). The dashed outline is the drill location.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Figure 2 – Phase One aircore drillholes completed over simplified Geology Datum: AMG Zone 51
(GDA94). Burmeister Nickel Laterite prospect.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Figure 3 – Northern end cross section TGAC0007 to TGAC0009
Figure 4 – Central cross section TGAC0010 to TGAC0011
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Figure 5 – Thickest intercept cross section TGAC0025 to TGAC0027
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Table A – Significant Intercepts >0.5%Ni
Hole ID
FROM
TGAC0001
19.0
TGAC0001
21.0
TGAC0002
14.0
TGAC0002
16.0
TGAC0002
17.0
TGAC0002
19.0
TGAC0002
20.0
TGAC0002
21.0
TGAC0002
23.0
TGAC0002
24.0
TGAC0002
25.0
TGAC0002
26.0
TGAC0002
27.0
TGAC0002
31.0
TGAC0002
32.0
TGAC0003
25.0
TGAC0003
26.0
TGAC0004
14.0
TGAC0004
15.0
TGAC0004
16.0
TGAC0004
17.0
TGAC0004
18.0
TGAC0005
17.0
TGAC0005
18.0
TGAC0005
19.0
TGAC0005
20.0
TGAC0005
21.0
TGAC0005
24.0
TGAC0005
25.0
TGAC0005
26.0
TGAC0005
27.0
TGAC0005
28.0
TGAC0005
29.0
TGAC0006
TGAC0007
22.0
TGAC0008
2.0
TGAC0008
23.0
TGAC0008
24.0
TGAC0008
25.0
TGAC0008
26.0
TGAC0008
27.0
TGAC0008
28.0
TGAC0008
29.0
TGAC0008
30.0
TGAC0008
31.0
TGAC0008
32.0
TGAC0008
33.0
TGAC0009
21.0
TGAC0009
22.0
TGAC0009
23.0
TGAC0009
24.0
TGAC0009
25.0
TGAC0009
26.0
TGAC0009
27.0
TGAC0009
28.0
TGAC0009
29.0
TGAC0009
30.0
TGAC0009
31.0
TGAC0009
32.0
TG METALS LTD
ASX TG6
ABN 40 644 621 830
TO
20.0
22.0
15.0
17.0
18.0
20.0
21.0
22.0
24.0
25.0
26.0
27.0
28.0
32.0
33.0
26.0
27.0
15.0
16.0
17.0
18.0
19.0
18.0
19.0
20.0
21.0
22.0
25.0
26.0
27.0
28.0
29.0
30.0
Ni %
Co ppm
0.5379
1884
0.5115
1233
0.6580
225
0.6185
311
0.5468
317
0.5680
281
0.5728
1322
0.5075
245
0.6563
187
0.5628
207
0.7860
237
0.8287
258
1.0713
971
0.7857
1943
0.8187
2059
0.5979
162
0.6015
190
0.6850
357
0.6823
215
0.7980
239
0.8448
256
0.8461
277
0.5352
93
0.5042
110
0.6061
232
0.7041
157
0.5505
109
0.5229
236
0.5545
214
0.5269
199
0.5190
250
0.5125
231
0.6793
449
NSR
23.0
0.6182
248
3.0
1.2257
697
24.0
0.6339
202
25.0
1.2721
440
26.0
0.7351
308
27.0
0.6475
293
28.0
0.7219
1017
29.0
0.8851
520
30.0
1.1186
485
31.0
1.5419
2887
32.0
1.0815
723
33.0
0.7219
289
34.0
0.5638
275
22.0
0.6133
436
23.0
0.5546
324
24.0
0.6850
363
25.0
0.6539
346
26.0
0.6394
309
27.0
0.6683
269
28.0
0.7050
291
29.0
0.5995
202
30.0
0.5917
208
31.0
0.6557
235
32.0
0.6589
310
33.0
0.7257
401
Fe %
11.11
5.53
25.08
16.96
14.58
15.69
10.69
14.09
10.78
10.37
17.25
19.33
3.83
9.07
6.20
14.69
14.81
19.30
16.14
14.97
15.19
17.13
8.28
7.71
6.25
8.04
8.53
6.80
7.70
7.83
9.96
14.59
14.06
Mg %
3.44
6.44
5.58
8.75
9.14
11.65
6.11
10.74
11.13
8.63
10.66
11.47
5.39
6.26
3.88
13.45
14.31
5.92
4.95
6.27
6.50
5.74
2.01
1.87
1.69
2.26
1.89
1.47
2.02
1.91
2.34
1.82
2.01
23.40
11.01
10.68
17.68
19.39
10.29
12.26
15.39
16.31
21.54
19.06
13.55
13.67
30.62
24.90
30.68
29.56
30.11
31.75
35.60
22.99
21.21
27.33
28.45
26.74
0.84
15.66
3.20
2.75
6.16
9.44
3.77
5.48
4.02
3.08
2.69
2.01
6.20
1.74
5.01
3.07
5.13
6.69
6.65
6.21
6.24
7.77
7.21
7.39
8.19
Suite 3, 28 Ord Street
West Perth WA 6005
Hole ID
FROM
TGAC0010
24.0
TGAC0010
25.0
TGAC0010
28.0
TGAC0010
29.0
TGAC0010
30.0
TGAC0010
31.0
TGAC0010
33.0
TGAC0010
34.0
TGAC0010
35.0
TGAC0010
36.0
TGAC0010
37.0
TGAC0010
38.0
TGAC0011
21.0
TGAC0011
22.0
TGAC0011
23.0
TGAC0011
24.0
TGAC0011
25.0
TGAC0011
26.0
TGAC0011
27.0
TGAC0011
28.0
TGAC0011
29.0
TGAC0011
30.0
TGAC0012
11.0
TGAC0012
12.0
TGAC0012
13.0
TGAC0012
14.0
TGAC0012
15.0
TGAC0012
16.0
TGAC0012
20.0
TGAC0012
21.0
TGAC0012
24.0
TGAC0012
25.0
TGAC0012
26.0
TGAC0012
27.0
TGAC0012
28.0
TGAC0012
29.0
TGAC0012
30.0
TGAC0012
31.0
TGAC0012
32.0
TGAC0012
33.0
TGAC0012
34.0
TGAC0012
35.0
TGAC0012
36.0
TGAC0012
37.0
TGAC0012
38.0
TGAC0012
39.0
TGAC0012
40.0
TGAC0012
41.0
TGAC0012
42.0
TGAC0012
43.0
TGAC0012
44.0
TGAC0012
45.0
TGAC0013
TGAC0014
29.0
TGAC0014
30.0
TGAC0014
31.0
TGAC0014
32.0
TGAC0014
33.0
TGAC0014
34.0
TO
25.0
26.0
29.0
30.0
31.0
32.0
34.0
35.0
36.0
37.0
38.0
39.0
22.0
23.0
24.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
12.0
13.0
14.0
15.0
16.0
17.0
21.0
22.0
25.0
26.0
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
Ni %
Co ppm
0.5738
700
0.5453
415
0.5471
418
0.6638
629
0.5263
394
0.5727
256
0.6298
220
0.5523
334
0.6083
381
0.5051
404
0.7056
590
0.5576
588
0.6619
432
0.6174
269
1.3266
535
0.6598
310
0.5999
442
0.7140
756
0.5078
562
3.2301
1416
0.6259
443
0.5237
491
0.6902
229
0.6682
232
0.6656
307
0.6807
311
0.7265
369
0.6142
246
0.7152
799
0.8094
773
0.8695
1398
1.0506
1983
0.9088
1424
1.1938
2265
0.9302
1220
0.8827
1144
0.9316
1084
0.9882
1198
0.8349
1006
0.7746
1185
0.9364
1082
0.9211
1064
0.9414
1015
0.5986
875
0.7309
895
0.6822
901
0.5193
666
0.6613
1110
0.5572
684
0.5526
484
0.6418
618
0.6739
904
NSR
30.0
0.7786
778
31.0
0.8574
782
32.0
0.6715
606
33.0
0.6822
714
34.0
0.5886
499
35.0
0.7822
696
T: +61 8 6211 5099
W: www.tgmetals.com.au
Fe %
16.53
17.93
16.70
18.41
16.00
15.86
12.66
14.04
16.50
11.34
10.80
11.16
32.25
29.84
21.56
25.51
24.91
25.27
9.32
5.78
20.11
12.11
30.21
30.51
31.33
29.11
31.69
24.70
30.98
31.75
31.63
31.11
29.69
33.73
35.08
37.80
36.37
31.70
22.99
21.98
33.79
35.57
33.43
18.50
21.47
23.28
18.26
24.28
22.87
19.33
18.76
19.90
Mg %
9.41
7.68
8.48
7.34
8.30
11.41
10.72
10.25
10.95
11.63
13.44
12.59
8.25
10.10
9.60
11.48
12.53
9.32
13.65
7.35
13.49
15.92
2.00
2.15
2.66
3.52
4.09
1.82
1.38
1.64
1.20
0.62
0.63
0.60
0.89
1.37
1.43
1.67
1.28
1.08
1.85
2.89
2.58
1.68
1.96
2.42
1.62
4.18
8.01
13.06
12.55
12.27
33.01
34.64
27.04
30.46
27.46
37.46
2.38
2.10
2.51
1.12
1.36
1.08
7
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Hole ID
FROM
TGAC0015
TGAC0016
TGAC0017
12.0
TGAC0017
13.0
TGAC0017
14.0
TGAC0017
15.0
TGAC0017
16.0
TGAC0017
17.0
TGAC0017
18.0
TGAC0017
19.0
TGAC0017
20.0
TGAC0017
21.0
TGAC0018
TGAC0019
12.0
TGAC0019
13.0
TGAC0019
14.0
TGAC0019
15.0
TGAC0019
16.0
TGAC0019
17.0
TGAC0019
18.0
TGAC0019
19.0
TGAC0019
20.0
TGAC0019
21.0
TGAC0019
22.0
TGAC0019
23.0
TGAC0020
TGAC0021
32.0
TGAC0021
33.0
TGAC0021
34.0
TGAC0021
35.0
TGAC0021
45.0
TGAC0021
46.0
TGAC0021
47.0
TGAC0021
48.0
TGAC0022
3.0
TGAC0022
9.0
TGAC0022
10.0
TGAC0022
12.0
TGAC0023
TGAC0024
11.0
TGAC0024
14.0
TGAC0024
15.0
TGAC0024
16.0
TGAC0024
17.0
TGAC0024
18.0
TGAC0024
19.0
TGAC0024
20.0
TGAC0024
21.0
TGAC0024
22.0
TGAC0024
23.0
TGAC0024
24.0
TGAC0024
25.0
TGAC0024
26.0
TGAC0024
27.0
TGAC0024
28.0
TGAC0024
29.0
TGAC0024
30.0
TGAC0024
31.0
TO
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Ni %
Co ppm
NSR
NSR
13.0
0.8296
406
14.0
0.9314
323
15.0
0.8833
297
16.0
1.0367
494
17.0
0.9293
659
18.0
0.5370
253
19.0
0.6660
442
20.0
0.5929
256
21.0
1.3000
1272
22.0
1.5683
2241
NSR
13.0
0.6132
191
14.0
0.7243
201
15.0
0.8057
223
16.0
0.6996
216
17.0
0.8533
345
18.0
1.1097
271
19.0
0.7421
363
20.0
0.5091
574
21.0
0.6246
234
22.0
0.5174
347
23.0
0.6450
240
24.0
0.6628
560
NSR
33.0
0.6620
529
34.0
0.6661
561
35.0
0.6791
857
36.0
0.5470
1189
46.0
0.5169
220
47.0
0.5894
320
48.0
0.5823
289
49.0
0.5268
222
4.0
0.5292
346
10.0
0.8718
3656
11.0
0.6052
1062
13.0
0.6966
2237
NSR
12.0
0.5529
340
15.0
0.7347
1052
16.0
0.7636
1438
17.0
0.7336
1415
18.0
1.0119
1065
19.0
1.0521
911
20.0
1.3902
905
21.0
1.5257
408
22.0
1.4144
469
23.0
1.2327
219
24.0
0.8432
151
25.0
0.7841
81
26.0
0.7713
237
27.0
0.7758
223
28.0
0.6442
228
29.0
0.6571
100
30.0
0.9618
310
31.0
0.8789
220
32.0
0.8184
153
Fe %
Mg %
19.90
19.99
14.37
31.31
20.30
10.09
10.96
9.30
13.89
12.47
4.58
1.74
2.14
1.37
4.78
11.43
9.94
10.04
3.60
5.73
6.94
13.71
16.22
12.13
16.89
13.80
8.52
4.83
6.96
6.60
12.30
17.57
10.94
9.38
9.90
10.19
7.04
9.61
10.31
8.93
9.78
10.27
10.91
5.96
9.45
9.77
12.61
15.03
24.64
27.82
23.64
19.38
26.80
15.03
15.28
14.42
1.08
1.11
1.11
1.06
0.71
2.51
2.76
2.62
0.88
1.12
1.30
1.44
8.65
9.46
10.88
11.15
10.69
7.96
8.61
10.02
9.11
9.27
12.85
13.24
13.40
13.72
15.35
14.40
14.96
13.79
13.24
5.27
2.96
2.80
1.98
2.32
1.95
2.37
1.90
1.85
2.13
1.93
1.84
1.84
1.69
2.30
1.94
2.16
2.39
4.01
Suite 3, 28 Ord Street
West Perth WA 6005
Hole ID
FROM
TGAC0025
TGAC0026
TGAC0027
16.0
TGAC0027
17.0
TGAC0027
18.0
TGAC0027
19.0
TGAC0027
20.0
TGAC0027
21.0
TGAC0027
22.0
TGAC0027
23.0
TGAC0027
24.0
TGAC0027
25.0
TGAC0027
26.0
TGAC0027
27.0
TGAC0027
28.0
TGAC0027
29.0
TGAC0027
30.0
TGAC0027
31.0
TGAC0027
32.0
TGAC0027
33.0
TGAC0027
34.0
TGAC0028
2.0
TGAC0028
5.0
TGAC0028
6.0
TGAC0028
7.0
TGAC0029
TGAC0030
TGAC0031
9.0
TGAC0031
10.0
TGAC0031
11.0
TGAC0032
TGAC0033
4.0
TGAC0033
5.0
TGAC0033
6.0
TGAC0034
24.0
TGAC0034
26.0
TGAC0034
27.0
TGAC0034
29.0
TGAC0034
30.0
TGAC0034
31.0
TGAC0034
33.0
TGAC0034
34.0
TGAC0034
35.0
TGAC0034
37.0
TGAC0034
39.0
TGAC0034
40.0
TGAC0034
41.0
TGAC0035
TGAC0036
5.0
TGAC0036
24.0
TGAC0036
25.0
TGAC0036
26.0
TGAC0036
27.0
TGAC0036
28.0
TGAC0036
29.0
TGAC0036
30.0
TGAC0036
31.0
TGAC0036
32.0
TGAC0036
33.0
TGAC0036
34.0
TGAC0036
35.0
TGAC0036
36.0
TGAC0036
37.0
TGAC0036
38.0
TGAC0036
39.0
TGAC0036
40.0
TGAC0036
41.0
TO
Ni %
Co ppm
NSR
NSR
17.0
0.6801
286
18.0
0.8311
1104
19.0
1.2044
2454
20.0
1.2044
2239
21.0
0.8856
913
22.0
1.1928
2267
23.0
1.0920
1061
24.0
1.2537
1310
25.0
1.1267
520
26.0
1.0721
342
27.0
1.1676
459
28.0
1.0320
349
29.0
1.3325
1419
30.0
0.9393
394
31.0
1.0076
468
32.0
0.6819
227
33.0
0.6372
97
34.0
0.5847
276
35.0
0.5826
353
3.0
0.5615
1668
6.0
0.5087
299
7.0
0.5330
209
8.0
0.5684
271
NSR
NSR
10.0
0.6542
299
11.0
0.6782
311
12.0
1.0141
432
NSR
5.0
0.6607
279
6.0
0.6606
213
7.0
0.6857
182
25.0
0.5041
198
27.0
0.5105
252
28.0
0.6432
859
30.0
0.7729
274
31.0
0.5452
181
32.0
0.5515
259
34.0
0.5646
283
35.0
0.5607
257
36.0
0.6040
281
38.0
0.5729
309
40.0
0.5026
318
41.0
0.8123
690
42.0
0.5571
400
NSR
6.0
0.6795
919
25.0
0.5028
288
26.0
0.5781
297
27.0
0.8692
1068
28.0
0.7576
379
29.0
0.8905
539
30.0
0.8376
307
31.0
0.6533
185
32.0
0.7403
199
33.0
0.8159
463
34.0
0.7804
169
35.0
0.7001
138
36.0
0.5677
76
37.0
0.5473
80
38.0
0.5658
81
39.0
0.6190
90
40.0
0.5749
94
41.0
0.7141
186
42.0
0.6189
133
T: +61 8 6211 5099
W: www.tgmetals.com.au
Fe %
Mg %
21.25
24.50
17.71
20.65
21.91
22.82
24.02
24.44
23.68
21.19
24.19
21.87
14.88
10.80
12.41
11.09
11.13
11.19
11.28
23.47
22.74
20.27
19.14
0.57
2.71
8.71
8.90
8.29
7.52
7.14
6.18
7.15
8.13
7.54
8.73
2.34
1.88
2.06
1.48
1.78
1.58
1.45
2.10
4.68
5.40
3.59
22.49
25.16
40.73
4.24
3.68
1.12
39.40
33.47
32.32
10.93
19.76
23.22
28.38
15.88
20.63
24.54
20.89
23.46
24.58
19.86
29.48
21.75
0.25
0.29
0.36
10.49
12.21
11.00
9.35
12.74
12.38
10.33
12.52
12.09
11.14
9.96
9.99
10.62
12.40
13.49
13.94
13.96
13.94
13.28
14.24
12.99
13.21
12.87
12.75
12.80
14.94
14.12
13.52
13.57
13.63
14.72
13.83
5.31
1.54
1.51
1.89
1.68
2.14
1.77
1.44
1.81
2.11
2.29
2.05
1.30
1.43
1.58
1.79
1.75
2.04
1.99
8
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Table B – Drillhole Collars
Hole ID
Hole Depth Dip Azimuth Grid ID
Easting
Northing
RL
TGAC0001
22.000 -90.0
360.0 GDA94z51 286325.684 6399314.694 353.352
TGAC0002
33.000 -90.0
360.0 GDA94z51 286362.147 6399345.759 352.382
TGAC0003
72.000 -90.0
360.0 GDA94z51 286401.151 6399372.219 351.221
TGAC0004
19.000 -90.0
360.0 GDA94z51 286237.799 6399402.899 352.609
TGAC0005
34.000 -90.0
360.0 GDA94z51 286274.906 6399430.206 352.057
TGAC0006
18.000 -90.0
360.0 GDA94z51 286311.234 6399463.155 350.776
TGAC0007
39.000 -90.0
360.0 GDA94z51 285893.120 6399917.500 348.867
TGAC0008
35.000 -90.0
360.0 GDA94z51 285932.546 6399946.300 348.069
TGAC0009
34.000 -90.0
360.0 GDA94z51 285974.122 6399975.701 347.212
TGAC0010
40.000 -90.0
360.0 GDA94z51 286285.456 6399072.763 357.508
TGAC0011
32.000 -90.0
360.0 GDA94z51 286324.802 6399096.346 356.897
TGAC0012
46.000 -90.0
360.0 GDA94z51 286349.631 6398879.990 359.103
TGAC0013
15.000 -90.0
360.0 GDA94z51 286395.172 6398908.364 358.469
TGAC0014
35.000 -90.0
360.0 GDA94z51 286429.154 6398932.276 357.990
TGAC0015
14.000 -90.0
360.0 GDA94z51 286591.444 6399052.337 354.030
TGAC0016
12.000 -90.0
360.0 GDA94z51 286848.168 6398653.216 356.456
TGAC0017
23.000 -90.0
360.0 GDA94z51 286883.791 6398666.289 355.879
TGAC0018
14.000 -90.0
360.0 GDA94z51 286891.217 6398595.669 357.088
TGAC0019
24.000 -90.0
360.0 GDA94z51 286925.233 6398626.791 355.829
TGAC0020
22.000 -90.0
360.0 GDA94z51 286964.171 6398647.478 355.138
TGAC0021
49.000 -90.0
360.0 GDA94z51 286760.568 6398428.805 362.219
TGAC0022
13.000 -90.0
360.0 GDA94z51 286796.004 6398459.403 361.048
TGAC0023
15.000 -90.0
360.0 GDA94z51 286917.153 6398547.297 357.577
TGAC0024
33.000 -90.0
360.0 GDA94z51 286958.957 6398579.029 356.209
TGAC0025
12.000 -90.0
360.0 GDA94z51 286978.269 6398435.663 358.469
TGAC0026
24.000 -90.0
360.0 GDA94z51 287013.659 6398464.041 357.694
TGAC0027
38.000 -90.0
360.0 GDA94z51 287058.624 6398497.392 356.792
TGAC0028
11.000 -90.0
360.0 GDA94z51 286972.372 6398280.112 361.000
TGAC0029
10.000 -90.0
360.0 GDA94z51 287015.061 6398309.976 360.825
TGAC0030
21.000 -90.0
360.0 GDA94z51 287089.202 6398381.003 358.915
TGAC0031
12.000 -90.0
360.0 GDA94z51 287134.502 6398398.608 358.063
TGAC0032
7.000 -90.0
360.0 GDA94z51 287048.203 6398179.108 363.696
TGAC0033
7.000 -90.0
360.0 GDA94z51 287090.083 6398207.180 362.977
TGAC0034
42.000 -90.0
360.0 GDA94z51 287208.065 6398298.109 360.030
TGAC0035
26.000 -90.0
360.0 GDA94z51 287233.892 6397786.565 368.244
TGAC0036
64.000 -90.0
360.0 GDA94z51 287271.760 6397822.095 367.163
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
9
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
RC Drilling Program
The RC drilling program for nickel sulphide targets has commenced starting with the Highfield
prospect. This program is expected to take up to 3 weeks to complete with assays.
Drilling targets are those defined by ground TEM conductors detected in the 2022-23
geophysics program (ASX announcement 19 January 2023).
About TG Metals
TG Metals is an ASX listed company focused on exploring for nickel, lithium and gold at its wholly
owned Lake Johnston Project in the stable jurisdiction of Western Australia. The Lake Johnston Project,
Figure 6, boasts proximity to current and past producing nickel mines, processing plants and
geochemical and geophysical targets for immediate exploration.
Figure 6 – Lake Johnston Project Location
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
10
ASX
ASX ANNOUNCEMENT
I
RELEASED 6 SEPTEMBER 2023
________________________________________________________________
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activities that
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe has
consented to the inclusion in this presentation of matters based on their information in the form and
context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
11
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Aircore (AC) drilling returns were bagged and labelled every metre. One
calico sample per metre were analysed for Ni Laterite mineralisation.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any measurement tools
or systems used.
AC samples were assayed per metre interval drilled and submitted to
Jinning Laboratories with TG Metals Limited standards (Geostats Pty Ltd)
inserted every 40th sample and a blank (sand) at every 50th sample
interval. Duplicate sampling will be completed based a selected grade
range to ensure coverage of “ore grade” material.
Jinning Laboratory included and reported their own standards, blanks
and pulp duplicates at rates compliant to industry standards.
•
Aspects of the determination of mineralisation that are Material to
the Public Report.
Certified Laboratory assays.
In cases where ‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Reverse Circulation (RC) style AC drilling whereby the whole recovered
drill material was retained in a labelled green bag with interval and hole
#. A sample split was obtained representative of the metre interval
drilling into a calico bag for assaying. The sample was then submitted for
assay at Jinning Labs, Maddington. Samples were sorted, dried and
pulverized to less than 75 microns. A 5 gram sample was taken and
fused in a furnace (~ 650ºC) with Sodium Peroxide using a zirconia
crucible. The melt was then dissolved in dilute Hydrochloric acid and the
solution analysed. This process provides complete dissolution of most
minerals including silicates. Volatile elements are lost at the high fusion
temperatures.
•
1
Criteria
JORC Code explanation
Commentary
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
All results were obtained from an Air Core (AC) rig using with 3.5 inch
bit/rods. All holes were vertical and drilled to end of interpreted laterite
profile. The whole sample was collected and retained in labelled green
bags, that were cable tied “air tight” after sampling to retain moisture
contents for future metallurgical test work.
AC drilling is considered the most appropriate method for drilling clay
rich laterite mineralisation as it cuts the insitu clays and leaves the
sample with air, without excess contamination or segregation due to air
flows.
Drill sample
recovery
•
Method of recording and assessing core and chip sample
recoveries and results assessed.
AC samples were collected in industry standard 600 x 900 mm green
gags. The volume of AC material recovered was visually checked to
ensure consistent relative volumes for each sample interval. The
estimated value was recorded on the geological log sheet.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
3 tier riffle splitter was used to obtain 1-3kg sample in to a clean calico
bags for assay submission and analysis. The remainder of the sample
interval was placed into the green bag, labelled and sealed sealed after
logging by rig Geologist/ to retain moisture.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
AC drilling method was selected due to blade bit being able to slice the
clays and less air pressure used to retrieve samples up the innertube.
This reduces effects of air separation of denser material from the lighter
material. Samples are collected every metre interval (m) and 3m rods
used to reduce chances of grade smearing. No groundwater was
encountered.
A portion of the drilled m interval was placed into a chip tray for
geological logging and future reference. Clay intervals were not sieved,
however any rock/hard material were sieved for identification. Logging
of clay vs rock was completed and the rock chips collected to provide a
future r