Multiple High Grade Gold Results at Van Uden
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 20 OCTOBER 2025
Multiple High Grade Gold Results
in First Drilling at Van Uden
Highlights
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to provide the results
of drilling within the historical Tasman open pit at the Van Uden Gold Project (Van Uden or
the Project).
Drilling consisted of shallow close spaced reverse circulation (RC) drillholes targeting remnant
gold mineralisation below the current pit floor and ramp. Result highlights include:
• 10m @ 4.98 g/t Au from 1.0m, including 1m @ 30.8 g/t Au
• 6m @ 2.37 g/t Au from 6.0m, including 1m @ 8.99 g/t Au
• 5m @ 2.48 g/t Au from 2.0m, including 2m @ 4.15 g/t Au
• 4m @ 2.31 g/t Au from 4.0m, including 1m @ 5.5 g/t Au
• 3m @ 3.55 g/t Au from 5.0m, including 2m @ 4.85 g/t Au
• 3m @ 2.51 g/t Au from surface, including 1m @ 5.4 g/t Au
TG Metals CEO, Mr. David Selfe stated;
“It’s great to see the high grade gold from the Tasman pit drilling which will allow us to extend
the depth of the pit with a minimum amount of waste removal. The presence of these high grade
zones provide upside to priority targets for our ongoing drilling.
The extensional drilling of the broader Van Uden resource continues and we believe this
program, which will run until the end of the year, will add materially to the current resource. We
anticipate being able to update and release a new mineral resource estimate in the new year.
■ First assays received from drilling in the Tasman Pit has delivered
multiple high grade results
■ High tenor mineralisation intersected, including:
■ 10m @ 4.98 g/t Au, including 1m @ 30.8 g/t Au
■ 6m @ 2.37 g/t Au, including 1m @ 8.99 g/t Au
■ Results confirm remnant gold mineralisation below the historical
Tasman Pit floor adding to the Company’s near term production
strategy
■ Updated resource modelling and pit designs to commence ahead of
mining approval applications
■ Resource infill and extensional drilling continues with ongoing results
to follow over the coming weeks
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
2
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
The maiden drilling program at the Gold City prospect is also complete with results expected in
the next week or two.
Excellent progress is being made at the project.”
The purpose of this drilling campaign was to provide an increased density of data for a revision
of the in-pit resource model for mine design purposes to aid applications for near future mining
of the remnant gold mineralisation left behind from the 1998 to 2000 mine development.
All drill assays reported are located within the Tasman Open Pit. Figure 1 shows the location
of the drillholes. Cross section Figure 2 shows a typical section through the Tasman pit with the
new drilling and the previous drilling. The full significant assay results above 0.3g/t Au are
provided in Table 2.
Figure 1 – Tasman Pit Drilling Collars Showing Select Intercept Highlights referenced on page 1
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
3
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 2 – Tasman Pit Cross Section Showing New Drilling, Historical Drilling and Existing Pit Void and Van Uden Mineralisation
Envelope
Tasman Pit Drilling
The RC drilling was conducted with a tracked drill rig, Epiroc D65, which is best suited to short
length drillholes, small drilling platforms and in-pit grade control. A total of 97 drillholes were
completed for 1119m of RC drilling. The drillhole dips range from -60o to -90o (vertical) to allow
for maximum coverage close to the pit walls. Table 1 provides the drilling collar information.
Drilling was designed using the surveyed internal pit shell and the existing Mineral Resource
Model as guidance. The drill pattern was a nominal 5m x 5m which will allow grade control
flitches to be produced, post the design of the Tasman pit extension.
Sampling was conducted every 1m with duplicates for every sample taken. Assaying was
conducted by Photon assay method, which uses a larger sample charge than fire assay to
mitigate coarse gold effects.
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
4
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Table 1 – Drillhole Collar Information
HOLE ID Dip (
o
) Azimuth (
o
) EASTING (m) NORTHING (m) RL (mASL) Depth (m)
TGGP001 -90.0 360.0 750294.775 6439315.382 386.000 10.0
TGGP002 -90.0 360.0 750290.077 6439313.672 386.000 10.0
TGGP003 -90.0 360.0 750285.378 6439311.962 386.000 10.0
TGGP004 -90.0 360.0 750280.680 6439310.252 386.000 10.0
TGGP005 -90.0 360.0 750276.620 6439314.095 386.000 10.0
TGGP006 -90.0 360.0 750277.259 6439319.649 386.000 10.0
TGGP007 -90.0 360.0 750273.200 6439323.492 386.000 10.0
TGGP008 -90.0 360.0 750286.656 6439323.069 386.000 10.0
TGGP009 -90.0 360.0 750291.355 6439324.779 386.000 10.0
TGGP010 -90.0 360.0 750290.716 6439319.226 386.000 10.0
TGGP011 -90.0 360.0 750286.017 6439317.516 386.000 10.0
TGGP012 -90.0 360.0 750281.958 6439321.359 386.000 10.0
TGGP013 -90.0 360.0 750277.899 6439325.202 386.000 10.0
TGGP014 -90.0 360.0 750273.839 6439329.046 386.000 10.0
TGGP015 -90.0 360.0 750282.597 6439326.912 386.000 10.0
TGGP016 -90.0 360.0 750278.538 6439330.756 386.000 10.0
TGGP017 -90.0 360.0 750287.296 6439328.623 386.000 10.0
TGGP018 -90.0 360.0 750291.994 6439330.333 386.000 10.0
TGGP019 -60.0 250.0 750292.633 6439335.886 386.000 12.0
TGGP020 -60.0 250.0 750292.882 6439341.298 387.000 12.0
TGGP021 -60.0 250.0 750291.871 6439346.250 387.500 12.0
TGGP022 -60.0 250.0 750290.860 6439351.203 388.000 12.0
TGGP023 -60.0 250.0 750289.849 6439356.156 388.500 12.0
TGGP024 -60.0 250.0 750288.838 6439361.109 389.000 12.0
TGGP025 -60.0 250.0 750287.827 6439366.062 389.500 12.0
TGGP026 -60.0 250.0 750286.816 6439371.015 390.000 12.0
TGGP027 -60.0 250.0 750285.805 6439375.968 390.500 12.0
TGGP028 -60.0 250.0 750284.794 6439380.921 391.000 12.0
TGGP029 -60.0 250.0 750283.783 6439385.874 391.500 12.0
TGGP030 -60.0 250.0 750282.772 6439390.827 392.000 12.0
TGGP031 -60.0 250.0 750287.935 6439334.176 386.000 12.0
TGGP032 -60.0 250.0 750288.137 6439339.571 387.000 12.0
TGGP033 -60.0 250.0 750287.129 6439344.525 387.500 12.0
TGGP034 -60.0 250.0 750286.122 6439349.479 388.000 12.0
TGGP035 -60.0 250.0 750285.114 6439354.433 388.500 12.0
TGGP036 -60.0 250.0 750284.106 6439359.387 389.000 12.0
TGGP037 -60.0 250.0 750283.099 6439364.341 389.500 12.0
TGGP038 -60.0 250.0 750282.091 6439369.295 390.000 12.0
TGGP039 -60.0 250.0 750281.083 6439374.249 390.500 12.0
TGGP040 -60.0 250.0 750280.076 6439379.204 391.000 12.0
TGGP041 -60.0 250.0 750279.068 6439384.158 391.500 12.0
TGGP042 -60.0 250.0 750278.060 6439389.112 392.000 12.0
TGGP043 -60.0 250.0 750314.121 6439349.028 399.000 12.0
TGGP044 -60.0 250.0 750312.000 6439353.577 398.460 12.0
TGGP045 -60.0 250.0 750309.879 6439358.126 397.920 12.0
TGGP046 -60.0 250.0 750307.758 6439362.675 397.380 12.0
TGGP047 -60.0 250.0 750305.637 6439367.224 396.840 12.0
TGGP048 -60.0 250.0 750303.516 6439371.772 396.300 12.0
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
5
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
HOLE ID Dip (
o
) Azimuth (
o
) EASTING (m) NORTHING (m) RL (mASL) Depth (m)
TGGP049 -60.0 250.0 750301.806 6439376.471 395.840 12.0
TGGP050 -60.0 250.0 750300.095 6439381.169 395.380 12.0
TGGP051 -60.0 250.0 750298.385 6439385.868 394.920 12.0
TGGP052 -60.0 250.0 750296.675 6439390.566 394.460 12.0
TGGP053 -60.0 250.0 750294.965 6439395.265 394.000 12.0
TGGP054 -60.0 250.0 750309.423 6439347.318 399.000 12.0
TGGP055 -60.0 250.0 750307.302 6439351.867 398.460 12.0
TGGP056 -60.0 250.0 750305.181 6439356.416 397.920 12.0
TGGP057 -60.0 250.0 750303.059 6439360.965 397.380 12.0
TGGP058 -60.0 250.0 750300.938 6439365.513 396.840 12.0
TGGP059 -60.0 250.0 750298.817 6439370.062 396.300 12.0
TGGP060 -60.0 250.0 750297.107 6439374.761 395.840 12.0
TGGP061 -60.0 250.0 750295.397 6439379.459 395.380 12.0
TGGP062 -60.0 250.0 750293.687 6439384.158 394.920 12.0
TGGP063 -60.0 250.0 750291.977 6439388.856 394.460 12.0
TGGP064 -60.0 250.0 750290.267 6439393.555 394.000 12.0
TGGP065 -90.0 360.0 750286.207 6439397.398 393.000 10.0
TGGP066 -90.0 360.0 750281.509 6439395.688 393.000 10.0
TGGP067 -90.0 360.0 750276.810 6439393.978 393.000 10.0
TGGP068 -90.0 360.0 750272.112 6439392.268 393.000 12.0
TGGP069 -90.0 360.0 750267.413 6439390.558 391.000 15.0
TGGP070 -90.0 360.0 750269.205 6439385.889 391.000 15.0
TGGP071 -90.0 360.0 750262.076 6439383.294 388.000 15.0
TGGP072 -90.0 360.0 750262.715 6439388.848 391.000 15.0
TGGP073 -90.0 360.0 750258.017 6439387.137 389.000 15.0
TGGP074 -90.0 360.0 750290.906 6439399.108 393.000 10.0
TGGP075 -90.0 360.0 750286.846 6439402.952 393.500 10.0
TGGP076 -90.0 360.0 750282.148 6439401.241 393.000 10.0
TGGP077 -90.0 360.0 750277.450 6439399.531 393.000 10.0
TGGP078 -90.0 360.0 750272.751 6439397.821 393.000 15.0
TGGP079 -90.0 360.0 750268.053 6439396.111 393.000 15.0
TGGP080 -90.0 360.0 750263.354 6439394.401 393.000 15.0
TGGP081 -90.0 360.0 750258.656 6439392.691 393.000 15.0
TGGP082 -90.0 360.0 750282.787 6439406.795 393.500 10.0
TGGP083 -90.0 360.0 750278.089 6439405.085 393.500 10.0
TGGP084 -90.0 360.0 750273.390 6439403.375 393.500 10.0
TGGP085 -90.0 360.0 750268.692 6439401.665 393.500 12.0
TGGP086 -90.0 360.0 750263.993 6439399.955 393.500 12.0
TGGP087 -90.0 360.0 750259.295 6439398.244 393.500 14.0
TGGP088 -90.0 360.0 750254.596 6439396.534 391.000 12.0
TGGP089 -90.0 360.0 750278.728 6439410.638 393.500 10.0
TGGP090 -90.0 360.0 750274.029 6439408.928 393.500 10.0
TGGP091 -90.0 360.0 750269.331 6439407.218 393.500 10.0
TGGP092 -90.0 360.0 750264.632 6439405.508 393.500 10.0
TGGP093 -90.0 360.0 750259.934 6439403.798 393.500 10.0
TGGP094 -90.0 360.0 750283.426 6439412.348 393.500 10.0
TGGP095 -90.0 360.0 750288.125 6439414.059 393.500 10.0
TGGP096 -90.0 360.0 750287.486 6439408.505 393.500 10.0
TGGP097 -90.0 360.0 750291.545 6439404.662 393.500 10.0
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
6
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Follow-up Work
Sediment at the very bottom of the Tasman pit was rain affected and unable to be drilled
during this campaign. This area has since dried and remediation works will be conducted to
allow drilling rig access as soon as practical.
The drilling results will be used to update the resource model below the Tasman pit shell and
the resulting updated model will be used for initial pit designs of the proposed Tasman pit
extension. This extension to the Tasman open pit will target low strip ratio gold mineralisation
suitable for adding to the existing stockpile inventory and made available for future toll
processing.
Assays are pending for the maiden drilling program completed at the Gold City prospect and
drilling continues on the Van Uden resource infill and extensional drilling with the arrival to
site later this month of a larger RC drill rig which will commence the deeper drillholes targeting
down dip extensions which have not previously been drilled.
Further programmes of work are pending for testing the full 6.5km mineralised strike, Figure
3, of the Van Uden shear. This drilling will be done in tandem with the current drilling when
approvals are received.
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
7
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 3 – Tasman Pit location
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
8
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Van Uden Gold Project Description
The Project is located on the Forrestania Greenstone Belt, Figure 4, 90km east-northeast of
Hyden and 120km south of Southern Cross. It is close to the Marvel Loch (producing) and
Westonia - Edna May (care & maintenance) gold processing Plants and is 130km from the
Company’s established Burmeister lithium deposit at the Lake Johnston Project.
Van Uden Gold consists of an Indicated and Inferred Mineral Resource as per Table A below
on four granted mining leases, four granted exploration licences, one exploration licence
application and two miscellaneous licences (for haul roads). The Project lies to the west of the
Mt Holland lithium mine, south of the operating Marvel Loch gold Plant, and southeast of the
Edna May gold Plant.
Table A: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. It has been reported
at a cut-off grade of 0.35 g/t Au by area within a A$5,000/oz Au optimised pit shell based on mining parameters
and operating costs typical for Australian open pit extraction deposits of a similar scale and geology. Minor
discrepancies may occur due to rounding of appropriate significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle
in mineral resource reporting that requires the qualified person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium
assets at its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in
the stable jurisdiction of Western Australia. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium
prospects. Burmeister is in proximity to four lithium processing plants and undeveloped
deposits. The Van Uden Gold Project contains past producing gold mines and is in proximity
to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact Investor Relations
Mr David Selfe Evy Litopoulous
Chief Executive Officer ResolveIR
Email: info@tgmetals.com.au Email: evy@resolveir.com
Material
Tonnes
Grade
(Aug/t) Gold (Oz) Tonnes
Grade
(Aug/t) Gold (Oz) Tonnes
Grade
(Aug/t) Gold (Oz)
Laterite 234,000 0.9 6,940 525,000 0.7 11,800 759,000 0.7 18,740
Oxide 867,000 1.2 34,200 1,141,000 1.0 38,200 2,008,000 1.0 72,400
Transitional 291,000 1.1 10,700 770,000 1.1 26,500 1,061,000 1.1 37,200
Fresh 318,000 1.6 16,500 2,207,000 1.2 82,300 2,525,000 1.2 98,800
Total 1,710,000 1.2 68,340 4,643,000 1.2 158,800 6,353,000 1.1 227,140
Mineral Resource Estimate for the VanUdenGold Deposit - May 2025
Indicated Inferred Total
ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
9
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 4 – Location Map showing TG Metals’ Van Uden Gold Project
10
ASX ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-
looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
11
ASX ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Table 2 – Drill Assay Table – NSI=no significant Intercept (<0.3g/tAu), LNR=Lab Not Received. All 1m intervals
HOLE ID FROM TO PROSPECT Au(g/t)
TGGP001 0 10 Tasman Pit NSI
TGGP002 0 10 Tasman Pit NSI
TGGP003 0 10 Tasman Pit NSI
TGGP004 0 10 Tasman Pit NSI
TGGP005 0 1 Tasman Pit 0.42
TGGP005 1 10 Tasman Pit NSI
TGGP006 0 1 Tasman Pit 0.71
TGGP006 1 9 Tasman Pit NSI
TGGP006 9 10 Tasman Pit 1.04
TGGP007 0 2 Tasman Pit NSI
TGGP007 2 3 Tasman Pit 0.58
TGGP007 3 4 Tasman Pit 0.59
TGGP007 4 5 Tasman Pit 3.55
TGGP007 5 6 Tasman Pit 1.45
TGGP007 6 7 Tasman Pit 0.56
TGGP007 7 10 Tasman Pit NSI
TGGP008 0 10 Tasman Pit NSI
TGGP009 0 7 Tasman Pit NSI
TGGP009 7 8 Tasman Pit 1.08
TGGP009 8 9 Tasman Pit 1.1
TGGP009 9 10 Tasman Pit NSI
TGGP010 0 10 Tasman Pit NSI
TGGP011 0 10 Tasman Pit NSI
TGGP012 0 10 Tasman Pit NSI
TGGP013 0 10 Tasman Pit NSI
TGGP014 0 7 Tasman Pit NSI
TGGP014 7 8 Tasman Pit 0.49
TGGP014 8 10 Tasman Pit NSI
TGGP015 0 10 Tasman Pit NSI
TGGP016 0 10 Tasman Pit NSI
TGGP017 0 10 Tasman Pit NSI
TGGP018 0 1 Tasman Pit 0.42
TGGP018 1 2 Tasman Pit <0.03
TGGP018 2 3 Tasman Pit 0.46
TGGP018 3 10 Tasman Pit NSI
TGGP019 0 8 Tasman Pit NSI
TGGP019 8 9 Tasman Pit 1.06
TGGP019 9 12 Tasman Pit NSI
TGGP020 0 7 Tasman Pit NSI
TGGP020 7 8 Tasman Pit 2.05
TGGP020 8 9 Tasman Pit LNR
TGGP020 9 10 Tasman Pit 1.64
TGGP020 10 11 Tasman Pit 0.2
TGGP020 11 12 Tasman Pit 0.36
TGGP021 0 1 Tasman Pit 0.36
TGGP021 1 2 Tasman Pit 0.14
TGGP021 2 3 Tasman Pit 0.67
TGGP021 3 10 Tasman Pit NSI
TGGP021 10 11 Tasman Pit 0.38
TGGP021 11 12 Tasman Pit 0.3
TGGP022 0 3 Tasman Pit NSI
TGGP022 3 4 Tasman Pit 8.31
TGGP022 4 5 Tasman Pit 1.44
TGGP022 5 10 Tasman Pit NSI
TGGP022 10 11 Tasman Pit 0.59
TGGP022 11 12 Tasman Pit 1
TGGP023 0 1 Tasman Pit 1.56
TGGP023 1 2 Tasman Pit 1.32
TGGP023 2 3 Tasman Pit 0.16
TGGP023 3 4 Tasman Pit 0.21
TGGP023 4 5 Tasman Pit 0.47
TGGP023 5 6 Tasman Pit 0.24
TGGP023 6 7 Tasman Pit 0.11
TGGP023 7 8 Tasman Pit 0.69
TGGP023 8 9 Tasman Pit 3.59
TGGP023 9 12 Tasman Pit NSI
HOLE ID FROM TO PROSPECT Au(g/t)
TGGP024 0 1 Tasman Pit 0.48
TGGP024 1 2 Tasman Pit 1.66
TGGP024 2 3 Tasman Pit 0.06
TGGP024 3 4 Tasman Pit 0.17
TGGP024 4 5 Tasman Pit 0.68
TGGP024 5 6 Tasman Pit 0.16
TGGP024 6 7 Tasman Pit 0.78
TGGP024 7 8 Tasman Pit 0.82
TGGP024 8 11 Tasman Pit NSI
TGGP024 11 12 Tasman Pit 0.77
TGGP025 0 6 Tasman Pit NSI
TGGP025 6 7 Tasman Pit 0.43
TGGP025 7 8 Tasman Pit 0.17
TGGP025 8 9 Tasman Pit 5.81
TGGP025 9 10 Tasman Pit 1.48
TGGP025 10 11 Tasman Pit 0.28
TGGP025 11 12 Tasman Pit 1.97
TGGP026 0 1 Tasman Pit 0.49
TGGP026 1 12 Tasman Pit NSI
TGGP027 0 6 Tasman Pit NSI
TGGP027 6 7 Tasman Pit 6.65
TGGP027 7 12 Tasman Pit NSI
TGGP028 0 5 Tasman Pit NSI
TGGP028 5 6 Tasman Pit 0.97
TGGP028 6 7 Tasman Pit 6.98
TGGP028 7 8 Tasman Pit 2.72
TGGP028 8 9 Tasman Pit 0.05
TGGP028 9 10 Tasman Pit <0.03
TGGP028 10 11 Tasman Pit 0.43
TGGP028 11 12 Tasman Pit 1.38
TGGP029 0 2 Tasman Pit NSI
TGGP029 2 3 Tasman Pit 0.45
TGGP029 3 4 Tasman Pit 0.52
TGGP029 4 5 Tasman Pit 0.75
TGGP029 5 6 Tasman Pit 0.37
TGGP029 6 10 Tasman Pit NSI
TGGP029 10 11 Tasman Pit 0.45
TGGP029 11 12 Tasman Pit 0.38
TGGP030 0 3 Tasman Pit NSI
TGGP030 3 4 Tasman Pit 0.35
TGGP030 4 11 Tasman Pit NSI
TGGP030 11 12 Tasman Pit 0.63
TGGP031 0 7 Tasman Pit NSI
TGGP031 7 8 Tasman Pit 0.31
TGGP031 8 9 Tasman Pit 0.31
TGGP031 9 12 Tasman Pit NSI
TGGP032 0 2 Tasman Pit NSI
TGGP032 2 3 Tasman Pit 4.01
TGGP032 3 4 Tasman Pit 0.32
TGGP032 4 11 Tasman Pit NSI
TGGP032 11 12 Tasman Pit 0.29
TGGP033 0 1 Tasman Pit 0.48
TGGP033 1 2 Tasman Pit 0.13
TGGP033 2 3 Tasman Pit 0.04
TGGP033 3 4 Tasman Pit 0.75
TGGP033 4 5 Tasman Pit 0.35
TGGP033 5 6 Tasman Pit 0.31
TGGP033 6 7 Tasman Pit 0.06
TGGP033 7 8 Tasman Pit 0.13
TGGP033 8 9 Tasman Pit 0.42
TGGP033 9 12 Tasman Pit NSI
TGGP034 0 1 Tasman Pit 0.13
TGGP034 1 2 Tasman Pit 2.71
TGGP034 2 3 Tasman Pit 0.21
TGGP034 3 4 Tasman Pit 0.61
TGGP034 4 5 Tasman Pit 1.13
TGGP034 5 6 Tasman Pit 2.06
TGGP034 6 10 Tasman Pit NSI
TGGP034 10 11 Tasman Pit 1.01
TGGP034 11 12 Tasman Pit 0.33
12
ASX ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
HOLE ID FROM TO PROSPECT Au(g/t)
TGGP035 0 1 Tasman Pit NSI
TGGP035 1 2 Tasman Pit 0.8
TGGP035 2 12 Tasman Pit NSI
TGGP036 0 1 Tasman Pit 0.21
TGGP036 1 2 Tasman Pit 0.3
TGGP036 2 3 Tasman Pit 0.62
TGGP036 3 4 Tasman Pit 1.75
TGGP036 4 9 Tasman Pit NSI
TGGP036 9 10 Tasman Pit 0.59
TGGP036 10 12 Tasman Pit NSI
TGGP037 0 1 Tasman Pit 0.12
TGGP037 1 2 Tasman Pit 0.35
TGGP037 2 5 Tasman Pit NSI
TGGP037 5 6 Tasman Pit 0.36
TGGP037 6 9 Tasman Pit NSI
TGGP037 9 10 Tasman Pit 0.48
TGGP037 10 11 Tasman Pit 0.47
TGGP037 11 12 Tasman Pit 0.06
TGGP038 0 1 Tasman Pit 0.23
TGGP038 1 2 Tasman Pit 0.56
TGGP038 2 3 Tasman Pit 1.51
TGGP038 3 4 Tasman Pit 0.84
TGGP038 4 5 Tasman Pit 0.99
TGGP038 5 6 Tasman Pit 0.96
TGGP038 6 12 Tasman Pit NSI
TGGP039 0 1 Tasman Pit 0.16
TGGP039 1 2 Tasman Pit 0.5
TGGP039 2 3 Tasman Pit 0.18
TGGP039 3 4 Tasman Pit 1.38
TGGP039 4 5 Tasman Pit 0.14
TGGP039 5 6 Tasman Pit 0.22
TGGP039 6 7 Tasman Pit 1.17
TGGP039 7 8 Tasman Pit 0.15
TGGP039 8 9 Tasman Pit 0.36
TGGP039 9 10 Tasman Pit 0.37
TGGP039 10 12 Tasman Pit NSI
TGGP040 0 2 Tasman Pit NSI
TGGP040 2 3 Tasman Pit 3.24
TGGP040 3 4 Tasman Pit 0.55
TGGP040 4 5 Tasman Pit 3.83
TGGP040 5 6 Tasman Pit 4.47
TGGP040 6 7 Tasman Pit 0.32
TGGP040 7 8 Tasman Pit 0.2
TGGP040 8 9 Tasman Pit 0.43
TGGP040 9 12 Tasman Pit NSI
TGGP041 0 12 Tasman Pit NSI
TGGP042 0 12 Tasman Pit NSI
TGGP043 0 8 Tasman Pit NSI
TGGP043 8 9 Tasman Pit 0.86
TGGP043 9 10 Tasman Pit 0.5
TGGP043 10 12 Tasman Pit NSI
TGGP044 0 6 Tasman Pit NSI
TGGP044 6 7 Tasman Pit 0.86
TGGP044 7 12 Tasman Pit NSI
TGGP045 0 3 Tasman Pit NSI
TGGP045 3 4 Tasman Pit 2.26
TGGP045 4 5 Tasman Pit <0.03
TGGP045 5 6 Tasman Pit 2.92
TGGP045 6 7 Tasman Pit 2.25
TGGP045 7 8 Tasman Pit LNR
TGGP045 8 9 Tasman Pit 0.45
TGGP045 9 10 Tasman Pit 0.37
TGGP045 10 11 Tasman Pit 1.89
TGGP045 11 12 Tasman Pit 0.35
TGGP046 0 4 Tasman Pit NSI
TGGP046 4 5 Tasman Pit 0.82
TGGP046 5 12 Tasman Pit NSI
HOLE ID FROM TO PROSPECT Au(g/t)
TGGP047 0 4 Tasman Pit NSI
TGGP047 4 5 Tasman Pit 0.42
TGGP047 5 12 Tasman Pit NSI
TGGP048 0 12 Tasman Pit NSI
TGGP049 0 4 Tasman Pit NSI
TGGP049 4 5 Tasman Pit 1.41
TGGP049 5 6 Tasman Pit 0.64
TGGP049 6 7 Tasman Pit 0.56
TGGP049 7 11 Tasman Pit NSI
TGGP049 11 12 Tasman Pit 0.81
TGGP050 0 3 Tasman Pit NSI
TGGP050 3 4 Tasman Pit 0.5
TGGP050 4 5 Tasman Pit 2.66
TGGP050 5 6 Tasman Pit 0.46
TGGP050 6 7 Tasman Pit 0.12
TGGP050 7 8 Tasman Pit 1.03
TGGP050 8 9 Tasman Pit 0.21
TGGP050 9 10 Tasman Pit 0.35
TGGP050 10 12 Tasman Pit NSI
TGGP051 0 1 Tasman Pit 1.18
TGGP051 1 2 Tasman Pit 0.3
TGGP051 2 3 Tasman Pit 0.18
TGGP051 3 4 Tasman Pit 1.06
TGGP051 4 5 Tasman Pit 0.23
TGGP051 5 6 Tasman Pit 1.58
TGGP051 6 12 Tasman Pit NSI
TGGP052 0 1 Tasman Pit 0.5
TGGP052 1 3 Tasman Pit NSI
TGGP052 3 4 Tasman Pit 1.01
TGGP052 4 5 Tasman Pit 0.28
TGGP052 5 6 Tasman Pit 0.71
TGGP052 6 7 Tasman Pit 2.06
TGGP052 7 12 Tasman Pit NSI
TGGP053 0 3 Tasman Pit NSI
TGGP053 3 4 Tasman Pit 0.96
TGGP053 4 5 Tasman Pit 1.13
TGGP053 5 12 Tasman Pit NSI
TGGP054 0 1 Tasman Pit 0.47
TGGP054 1 5 Tasman Pit NSI
TGGP054 5 6 Tasman Pit 0.83
TGGP054 6 7 Tasman Pit 2.22
TGGP054 7 8 Tasman Pit 0.7
TGGP054 8 12 Tasman Pit NSI
TGGP055 0 2 Tasman Pit NSI
TGGP055 2 3 Tasman Pit 0.47
TGGP055 3 4 Tasman Pit 0.15
TGGP055 4 5 Tasman Pit 0.33
TGGP055 5 6 Tasman Pit 2.17
TGGP055 6 7 Tasman Pit 4.04
TGGP055 7 8 Tasman Pit 0.81
TGGP055 8 9 Tasman Pit 0.33
TGGP055 9 12 Tasman Pit NSI
TGGP056 0 1 Tasman Pit 0.04
TGGP056 1 2 Tasman Pit 0.69
TGGP056 2 3 Tasman Pit 0.49
TGGP056 3 4 Tasman Pit 1.37
TGGP056 4 5 Tasman Pit 30.8
TGGP056 5 6 Tasman Pit 13.01
TGGP056 6 7 Tasman Pit 0.84
TGGP056 7 8 Tasman Pit 0.76
TGGP056 8 9 Tasman Pit 1.01
TGGP056 9 10 Tasman Pit 0.38
TGGP056 10 11 Tasman Pit 0.5
TGGP056 11 12 Tasman Pit 0.16
TGGP057 0 1 Tasman Pit 0.04
TGGP057 1 2 Tasman Pit 0.49
TGGP057 2 3 Tasman Pit 1.46
TGGP057 3 12 Tasman Pit NSI
13
ASX ASX ANNOUNCEMENT I RELEASED 20 OCTOBER 2025
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
HOLE ID FROM TO PROSPECT Au(g/t)
TGGP058 0 1 Tasman Pit 0.04
TGGP058 1 2 Tasman Pit 0.28
TGGP058 2 3 Tasman Pit 1.28
TGGP058 3 8 Tasman Pit NSI
TGGP058 8 9 Tasman Pit 0.3
TGGP058 9 10 Tasman Pit 0.47
TGGP058 10 12 Tasman Pit NSI
TGGP059 0 6 Tasman Pit NSI
TGGP059 6 7 Tasman Pit 0.38
TGGP059 7 9 Tasman Pit NSI
TGGP059 9 10 Tasman Pit 0.64
TGGP059 10 12 Tasman Pit NSI
TGGP060 0 2 Tasman Pit NSI
TGGP060 2 3 Tasman Pit 1.86
TGGP060 3 4 Tasman Pit 1.53
TGGP060 4 5 Tasman Pit 2.09
TGGP060 5 6 Tasman Pit 0.68
TGGP060 6 7 Tasman Pit 0.29
TGGP060 7 12 Tasman Pit NSI
TGGP061 0 1 Tasman Pit 0.55
TGGP061 1 2 Tasman Pit 5.4
TGGP061 2 3 Tasman Pit 1.59
TGGP061 3 6 Tasman Pit NSI
TGGP061 6 7 Tasman Pit 0.39
TGGP061 7 12 Tasman Pit NSI
TGGP062 0 1 Tasman Pit 0.18
TGGP062 1 2 Tasman Pit 0.32
TGGP062 2 3 Tasman Pit 1.06
TGGP062 3 4 Tasman Pit 0.76
TGGP062 4 5 Tasman Pit 0.48
TGGP062 5 11 Tasman Pit NSI
TGGP062 11 12 Tasman Pit 1.25
TGGP063 0 1 Tasman Pit 0.16
TGGP063 1 2 Tasman Pit 0.65
TGGP063 2 3 Tasman Pit 0.21
TGGP063 3 4 Tasman Pit 0.79
TGGP063 4 5 Tasman Pit 0.39
TGGP063 5 10 Tasman Pit NSI
TGGP063 10 11 Tasman Pit 0.94
TGGP063 11 12 Tasman Pit 1.33
TGGP064 0 1 Tasman Pit 0.18
TGGP064 1 2 Tasman Pit 0.88
TGGP064 2 3 Tasman Pit 0.52
TGGP064 3 4 Tasman Pit 0.57
TGGP064 4 5 Tasman Pit 0.79
TGGP064 5 9 Tasman Pit NSI
TGGP064 9 10 Tasman Pit 0.98
TGGP064 10 11 Tasman Pit 2.19
TGGP064 11 12 Tasman Pit 0.5
TGGP065 0 10 Tasman Pit NSI
TGGP066 0 6 Tasman Pit NSI
TGGP066 6 7 Tasman Pit 7.0
TGGP066 7 8 Tasman Pit 0.31
TGGP066 8 10 Tasman Pit NSI
TGGP067 0 1 Tasman Pit 0.44
TGGP067 1 8 Tasman Pit NSI
TGGP067 8 9 Tasman Pit 0.39
TGGP067 9 10 Tasman Pit 0.06
TGGP068 0 12 Tasman Pit
Share your feedback
Discover