Investor Presentation
Released
Released
Announcement PDF
VAN UDEN GOLD PROJECT
Western Australia
Unlocking Near Term Production with Scalable Growth
Investor Presentation – August 2025
ASX:TG6
DISCLAIMER
This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or
financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been
prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. No
representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of TG Metals Limited, its
directors, employees or agents, not any other person accepts any liability, including, without limitation, any liability arising out of fault
of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or
warranty, express or implied is given as the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any
forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts,
prospects or returns are by their nature subject to significant uncertainties and contingencies. No representation is made that, in
relation to the tenements the subject of this presentation, TG Metals has now or will at any time in the future develop further
resources or reserves within the meaning of the Australian Code for Reporting of Exploration Results, Mineral resources and Ore
Reserves (The JORC Code).
Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an
investment is appropriate in light of your particular investment needs, objectives and financial circumstances. You should have
consideration to the risks involved in investment in TG Metals Limited. By accepting this presentation, the recipient represents and
warrants that it is a person to whom this presentation may be delivered or distributed without a violation of the laws of any
jurisdiction.
This presentation is not to be disclosed to any other person or used for any other purpose and any other person who receives this
presentation should not rely or act upon it. Information contained in this presentation is confidential information and the property of
TG Metals Limited. It is made available strictly for the purposes referred to above. The presentation and any further confidential
information made available to any recipient must be held in complete confidence and documents containing such information may not
be reproduced, used or disclosed with the prior written consent of TG Metals Limited.
The material contained in this presentation does not constitute or contain an offer or invitation to subscribe for or purchase any
securities in TG Metals nor does it constitute an inducement to make an offer or invitation with respect to those securities. No
agreement to subscribe for or purchase securities in TG Metals will be entered into on the basis of this presentation.
COMPETENT PERSONS STATEMENT
The information in this presentation that relates to the Mineral Resource Estimate Report has been compiled by Mr Matthew Karl. Mr
Karl is an employee of Mining Plus Pty Ltd and has acted as an independent consultant on the report titled “MP13744 TG Metals Ltd –
Van Uden - JORC Mineral Resource Estimate Report – May 2025”. Mr Karl is a Member of the Australian Institute of Mining and
Metallurgy (AusIMM) and Australian Institute of Geoscientists (AIG) and has sufficient experience with the style of mineralisation,
deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Karl consents to
the inclusion in this presentation of the contained technical information relating the Mineral Resource Estimation in the form and
context in which it appears.
Information in this presentation that relates to exploration results, exploration targets, geology, drilling and mineralisation is based on
information compiled by Mr David Selfe who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient
experience that is relevant to the style of mineralization and type of deposit under consideration and to the activities that he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Selfe has consented to the inclusion in this presentation of matters based on their
information in the form and context in which it appears. Mr Selfe considers that the information in this presentation is an accurate
representation of the available data and studies for the Van Uden Gold Project.
FORWARD LOOKING STATEMENT
This presentation contains certain statements that may constitute “forward looking statement”. Such statements
are only predictions and are subject to inherent risks and uncertainties, which could cause actual values, results,
performance achievements to differ materially from those expressed, implied or projected in any forward looking
statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-looking
statements. These statements include, but are not limited to statements regarding future production, resources or
reserves and exploration results. All such statements are subject to certain risks and uncertainties, many of which
are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ
materially from those expressed in, or implied or projected by, the forward-looking information and statements.
These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results,
the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to
possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development
activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or
delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi)
other risks and uncertainties related to the Company’s prospects, properties and business strategy. Our audience
is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and we do not undertake any obligation to revise and disseminate forward-looking statements to reflect
events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included in this
ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions and technical
parameters underpinning the exploration results in this release continue to apply and have not materially changed.
CAUTIONARY STATEMENT – VISUAL ESTIMATES
This presentation contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
2
VAN UDEN GOLD PROJECT – NEAR TERM CASH WITH EXPLORATION UPSIDE
Historical production with pathway to recommence mining
Near term cash flow from existing stockpiles and surface resource
Resource Growth from drilling along strike and down dip
Exploration Upside with walk up drill targets to add ounces
Strategic Location – Access to infrastructure (power/water),
sealed roads and nearby processing facilities
3
CORPORATE OVERVIEW
Capital Structure
Shareholder Composition
Shares on Issue
Cash & Receivables1
Market Cap2
102.3M
$2.9M
$16.4M
1
at August 2025
Directors & Management
Richard Bevan
Non Exec Chairman
Brett Smith
Non Exec Director
Gloria Zhang
Non Exec Director
David Selfe
Chief Executive Officer
Nicki Farley
Company Secretary
2
at $0.16 share price
12 Month Share Price Performance
4
VAN UDEN PROJECT OVERVIEW
▪ Forrestania Greenstone Belt significant gold
endowment and production
▪ Historic Production with two shallow open pits,
stockpiles and walk-up drill targets
▪ Situated within 100km radius on sealed roads to
multiple processing plants
▪ Low Risk recommencement of mining due to
granted mining leases, commencement on
previous mining areas
5
VAN UDEN PROJECT – SIGNIFICANT GOLD RESOURCE WITH UPSIDE
▪ Current Mineral Resource 6.35Mt @ 1.1 g/t Au for
227,140 oz1 (JORC 2012)
▪ Resource depth only 148m, limited by drilling
▪ Open along strike and down dip
▪ High grade zones well defined
▪ Historical production of 136,023t @ 2.54 g/t Au
for 11,142oz Au2
Largest pit shell constrained gold resource of
any Junior on the belt
1. Refer to TG6 ASX Announcement dated 5 June 2025
2. Refer to TG6 ASX Announcement dated 3 March 2025
Unexplored
6
VAN UDEN GOLD PROJECT – CLEAR OPPORTUNITIES TO GROW
Existing Tasman Pit
Existing Dieman Pit
UPCOMING DRILLING WILL TARGET RESOURCE EXTENSIONS
7
TASMAN OPEN PIT – SHALLOW, HIGH GRADE MINERALISATION
1. Refer to TG6 ASX Announcement dated 5 June 2025
Cross Section through Tasman Pit
8
DIEMAN OPEN PIT
1. Refer to TG6 ASX Announcement dated 5 June 2025
Cross Section through Dieman Pit
9
GOLD CITY PROSPECT – EXPLORATION OPPORTUNITY
▪ 20kms south of Van Uden
▪ Numerous historical gold workings
▪ Multiple gold lodes defined by only 11
historic RC drill holes including:
▪
14m @ 2.26g/t Au1 from 20m; and
▪
25m @ 1.09g/t Au1 from 18m
▪ Significant potential to add resource ounces
to the Van Uden Project
1. Refer to TG6 ASX Announcement dated 7 August 2025
RC Gold
Drillholes
OPEN DOWN
DIP, AND
ALONG
STRIKE
10
NEXT STEPS – PATHWAY TO PRODUCTION
Project
Stockpiles SMP Approved
Dril ing Tasman Pit
Resource Dril ing VU
Gold City Dril ing Approvals
Updated VU Resource
Tasman Pit Mining Approvals
Laterite HG Mining Approvals
VU Pit Approvals
Q3 CY2025
Q4 CY2025
Q1 CY2026
Q2 CY2026
Q3 CY2026
Q4 CY2026
NEAR-TERM OPPORTUNITIES – Low to no waste removal
▪ Near-surface laterite resource 759Kt for 18,740oz Au1
▪ Remnant Tasman in-pit 26,700 tonnes at 1.6g/t Au2
▪ Historical Stockpiles
1. Refer to TG6 ASX Announcement dated 5 June 2025
2. Refer to TG6 ASX Announcement dated 21 August 2025
INDUSTRY PROFIT MARGINS
▪ Highest margins ever
▪ Low grade now high grade
▪ Beat the cost creep
11
VALUE PROPOSITION
- STRATEGIC ADDITION AND SYNERGIES
Dual Commodity Exposure
Near term cash flow
FOR MORE INFORMATION
David Selfe – CEO
Email: dselfe@tgmetals.com.au
Resource growth with
upcoming drilling
Richard Bevan - Chairperson
Email: rbevan@tgmetals.com.au
Well Funded
12
Share your feedback
Discover