Resource Drilling Commencing - Van Uden
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 16 SEPTEMBER 2025
RESOURCE DRILLING COMMENCING - VAN UDEN
Highlights
■ Drill Rig on site for drilling of historical Tasman Pit
■ Second drill rig to be mobilised in the coming days – with approvals
also granted for Van Uden resource extension drilling
TG Metals Limited (TG Metals or the Company) (ASX:TG6) provides an update on
exploration activities at the Van Uden Gold Project (Van Uden).
A drill rig is on site for grade control drilling within the historic Tasman Pit (Figure 1), with a
second drill rig on the way for the resource extension drilling on the Van Uden gold deposit.
The aim of this drilling is to:
1. Improve the resource classification within the Tasman Pit area for pit design studies;
2. Expand the predominantly shallowly tested Van Uden resource; and
3. Improve the Van Uden resource classification by converting Inferred resources to
Indicated.
The initial Tasman in-pit programme will consist of shallow Reverse Circulation (RC) drilling
to depths less than 20m. This close spaced drilling coverage of the known mineralisation
beneath the floor of the historic Tasman Pit is designed to increase resource confidence in
this area and provide the basis for pit extension designs in the near future.
A programme to drill test the newly defined extensive 6.5km long gold in soil anomaly (ASX
announcement 9 September 2025) defining the Van Uden shear is well advanced. A number
of accessible drill targets have been defined along this expanded strike length. POWs
(programmes of work) to drill these targets will be lodged in the coming weeks, with the aim
of this programme to follow on from the current Resource drilling.
TG Metals CEO, Mr. David Selfe stated;
“It’s good to see the drill rigs arriving on site to begin TG Metal’s maiden resource drilling
campaign at Van Uden. The deposit has enormous potential to grow from the current resource
base and this drilling will lead into an update of the resource model (MRE) in early 2026. We’re
targeting the shallow parts of the deposit first and then moving into the deeper down dip
extensions in the latter part of this programme. Two rigs on site gives us optionality for drilling
locations to maintain a steady flow of drill sample results. In addition, we have plans and
approvals in the pipeline for our first drilling at the Gold City prospect. The remainder of 2025
will be a very busy time for our Geology team as we progress and expand the Van Uden Gold
project.”
ASX ANNOUNCEMENT
I
RELEASED 16 SEPTEMBER 2025
________________________________________________________________
Figure 1 – Drill Rig arrives onsite at Van Uden
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX ANNOUNCEMENT
I
RELEASED 16 SEPTEMBER 2025
________________________________________________________________
Figure 2 –Van Uden Resource area and surface soil sampling gold anomalies showing approved drilling areas
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
ASX ANNOUNCEMENT
I
RELEASED 16 SEPTEMBER 2025
________________________________________________________________
Follow-up Work
Additional POW applications are being submitted for drilling on the Van Uden shear, to test
gold in soil anomalies recently identified (ASX announcement 9 September 2025) (Figure 2).
A POW application has also been lodged for drilling the Gold City prospect, 20 kilometres
south of Van Uden, where surface sampling has identified gold anomalies for testing (ASX
announcement 7 August 2025). Infill soil sampling at Gold City will commence later this month.
Van Uden Gold Project Description
The Project is located on the Forrestania Greenstone Belt, Figure 3, 90km east-northeast of
Hyden and 120km south of Southern Cross. It is close to the Marvel Loch (producing) and
Westonia - Edna May (care & maintenance) gold processing Plants and is 130km from the
Company’s established Burmeister lithium deposit at the Lake Johnston Project.
Van Uden Gold consists of an Indicated and Inferred Mineral Resource as per Table A below
on four granted mining leases, four granted exploration licences, one exploration licence
application and two miscellaneous licences (for haul roads). The Project lies to the west of the
Mt Holland lithium mine, south of the operating Marvel Loch gold Plant, and southeast of the
Edna May gold Plant.
Mineral Resource Estimate for the Van Uden Gold Deposit - May 2025
Material
Indicated
Inferred
Total
Grade
Grade
Grade
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz)
Tonnes
Laterite
234,000
0.9
6,940
525,000
0.7
11,800
759,000
0.7
18,740
Oxide
867,000
1.2
34,200 1,141,000
1.0
38,200 2,008,000
1.0
72,400
Transitional
291,000
1.1
10,700
770,000
1.1
26,500 1,061,000
1.1
37,200
Fresh
318,000
1.6
16,500 2,207,000
1.2
82,300 2,525,000
1.2
98,800
Total
1,710,000
1.2
68,340 4,643,000
1.2 158,800 6,353,000
1.1 227,140
Table A: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. It has been reported
at a cut-off grade of 0.35 g/t Au by area within a A$5,000/oz Au optimised pit shell based on mining parameters
and operating costs typical for Australian open pit extraction deposits of a similar scale and geology. Minor
discrepancies may occur due to rounding of appropriate significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle
in mineral resource reporting that requires the qualified person to demonstrate that a mineral deposit has the
potential to be economically extracted in the future.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
ASX ANNOUNCEMENT
I
RELEASED 16 SEPTEMBER 2025
________________________________________________________________
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium
assets at its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in
the stable jurisdiction of Western Australia. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium
prospects. Burmeister is in proximity to four lithium processing plants and undeveloped
deposits. The Van Uden Gold Project contains past producing gold mines and is in proximity
to operating gold processing Plants.
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Figure 3 – Location Map showing TG Metals’ Van Uden Gold Project
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
ASX
ASX ANNOUNCEMENT
I
RELEASED 16 SEPTEMBER 2025
________________________________________________________________
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
Share your feedback
Discover