Investor Presentation - RIU Explorers Conference
Released
Released
Announcement PDF
GOLD AND LITHIUM PROJECTS
Western Australia
Advanced Deposits with Scalable Growth
February 2026
ASX:TG6
2
DISCLAIMER
This presentation has been prepared by TG Metals Limited. The information contained in this presentation is not investment or
financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been
prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. No
representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of TG Metals Limited, its
directors, employees or agents, not any other person accepts any liability, including, without limitation, any liability arising out of fault
of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or
warranty, express or implied is given as the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any
forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts,
prospects or returns are by their nature subject to significant uncertainties and contingencies. No representation is made that, in
relation to the tenements the subject of this presentation, TG Metals has now or will at any time in the future develop further
resources or reserves within the meaning of the Australian Code for Reporting of Exploration Results, Mineral resources and Ore
Reserves (The JORC Code).
Before making an investment decision, you should consider, with or without the assistance of a financial adviser, whether an
investment is appropriate in light of your particular investment needs, objectives and financial circumstances. You should have
consideration to the risks involved in investment in TG Metals Limited. By accepting this presentation, the recipient represents and
warrants that it is a person to whom this presentation may be delivered or distributed without a violation of the laws of any
jurisdiction.
This presentation is not to be disclosed to any other person or used for any other purpose and any other person who receives this
presentation should not rely or act upon it. Information contained in this presentation is confidential information and the property of
TG Metals Limited. It is made available strictly for the purposes referred to above. The presentation and any further confidential
information made available to any recipient must be held in complete confidence and documents containing such information may not
be reproduced, used or disclosed with the prior written consent of TG Metals Limited.
The material contained in this presentation does not constitute or contain an offer or invitation to subscribe for or purchase any
securities in TG Metals nor does it constitute an inducement to make an offer or invitation with respect to those securities. No
agreement to subscribe for or purchase securities in TG Metals will be entered into on the basis of this presentation.
COMPETENT PERSONS STATEMENT
The information in this presentation that relates to the Mineral Resource Estimate Report has been compiled by Mr Matthew Karl. Mr
Karl is an employee of Mining Plus Pty Ltd and has acted as an independent consultant on the report titled “MP13744 TG Metals Ltd –
Van Uden - JORC Mineral Resource Estimate Report – May 2025”. Mr Karl is a Member of the Australian Institute of Mining and
Metallurgy (AusIMM) and Australian Institute of Geoscientists (AIG) and has sufficient experience with the style of mineralisation,
deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Karl consents to
the inclusion in this presentation of the contained technical information relating the Mineral Resource Estimation in the form and
context in which it appears.
Information in this presentation that relates to exploration results, exploration targets, geology, drilling and mineralisation is based on
information compiled by Mr David Selfe who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient
experience that is relevant to the style of mineralization and type of deposit under consideration and to the activities that he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Selfe has consented to the inclusion in this presentation of matters based on their
information in the form and context in which it appears. Mr Selfe considers that the information in this presentation is an accurate
representation of the available data and studies for the Van Uden Gold Project.
FORWARD LOOKING STATEMENT
This presentation contains certain statements that may constitute “forward looking statement”. Such statements
are only predictions and are subject to inherent risks and uncertainties, which could cause actual values, results,
performance achievements to differ materially from those expressed, implied or projected in any forward looking
statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”, “feel(s)”,
“believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-looking
statements. These statements include, but are not limited to statements regarding future production, resources or
reserves and exploration results. All such statements are subject to certain risks and uncertainties, many of which
are difficult to predict and generally beyond the control of the Company, that could cause actual results to differ
materially from those expressed in, or implied or projected by, the forward-looking information and statements.
These risks and uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results,
the geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to
possible variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or development
activities or the completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable terms or
delays in obtaining governmental approvals or in the completion of development or construction activities, and (vi)
other risks and uncertainties related to the Company’s prospects, properties and business strategy. Our audience
is cautioned not to place undue reliance on these forward-looking statements that speak only as of the date
hereof, and we do not undertake any obligation to revise and disseminate forward-looking statements to reflect
events or circumstances after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included in this
ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions and technical
parameters underpinning the exploration results in this release continue to apply and have not materially changed.
CAUTIONARY STATEMENT – VISUAL ESTIMATES
This presentation contains references to visual results and visual estimates of mineralisation. The Company draws
attention to uncertainty in reporting visual results. Visual estimates of mineral abundance should never be
considered a proxy for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical
properties relevant to valuations.
3
VAN UDEN GOLD PROJECT – LAKE JOHNSTON LITHIUM PROJECT
Resource Growth Van Uden gold MRE update following extensive
drilling campaign. Burmeister lithium deposit resource drill ready
Exploration Upside with over 7km of strike at Van Uden gold plus
Gold City and Jaegermeister lithium prospect
Strategic Location – Access to infrastructure (power/water),
sealed roads and nearby processing facilities
Advanced lithium deposit primed for development
Historical gold production with pathway to recommence mining
Capital Structure
CORPORATE OVERVIEW
4
Shares on Issue
120.5M
Cash & Receivables
$3.6M
Market Cap
$24.1M
at $0.20 share price
Directors & Management
Richard Bevan Non Exec Chairman
Brett Smith Non Exec Director
Gloria Zhang Non Exec Director
David Selfe Chief Executive Officer
Nicki Farley Company Secretary
Shareholder Composition
12 Month Share Price Performance
as at 31 December 2025
5
Forrestania Greenstone Belt significant gold
endowment and production
Historic Production with two shallow open pits,
stockpiles, gold mineralisation from surface
Growing Resource with 227,140oz* open along
strike (+7km) and down dip, updated MRE in
March
Situated within 100km radius on sealed roads to
multiple processing plants
Low Risk recommencement of mining on
granted mining leases
VAN UDEN GOLD PROJECT OVERVIEW
* Refer to TG6 ASX Announcement dated 5 June 2025 and Appendices for full table
VAN UDEN PROJECT – SIGNIFICANT GOLD RESOURCE WITH UPSIDE
6
Current Mineral Resource 6.35Mt @ 1.1 g/t Au for
227,140 oz1 (JORC 2012)
Resource depth only 148m, new MRE drilling
expands to +200m depth
Open along strike and down dip, new drill hits
550m south of MRE and below MRE
High grade zones well defined, latest drilling2:
Open
New Drilling Delivers Continuity, Strike
Extensions and Depth Extensions
1. Refer to TG6 ASX Announcement dated 5 June 2025 and Appendices for full table
2. Refer to TG6 ASX Announcements dated 20 October, 18 November 2025 and 16 February 2026
Conceptual Pit Outline
Unexplored
10m @ 4.98 g/t Au
15m @ 4.06 g/t Au
8m @ 2.74 g/t Au
30m @ 1.60 g/t Au
15m @ 2.22 g/t Au
13m @ 2.48 g/t Au
VAN UDEN PROJECT – ENORMOUS EXPANDED STRIKE UPSIDE
7
Extensive soil sampling assays define gold in soil
anomaly 6.5Km long1 plus added northern tenure
7.0Km of strike
First drilling 550m south2 of the MRE delivered new
discovery 3m @ 3.46 g/t Au and 11m @ 1.19 g/t Au
Additional targets to the West of the Van Uden
deposit and further south
A large and strong gold system being defined along
the Van Uden shear
Expanded strike from 2.5Km to 7.0 Km
presents more shallow gold opportunities
1. Refer to TG6 ASX Announcement dated 9 September 2025
2. Refer to TG6 ASX Announcement dated 20 January 2026
Conceptual Pit Outline
VAN UDEN GOLD PROJECT – RESOURCE EXPANSION
8
Shallow historical
drilling <150m
depth, new drilling
>200m depth
Infill drilling and
strike expansion
drilling delivers
outstanding results
Re-interpretation
and preliminary
modelling
underway
Finalise updated
MRE in March
9
GOLD CITY PROSPECT – EXPLORATION OPPORTUNITY – EVOLVING SATELLITE
20kms south of Van Uden
Numerous historical gold workings at
“Downtown”
Multiple gold lodes defined by only 11
historic RC drill holes and 7 new RC
drillholes including:
14m @ 2.26g/t Au1 from 20m;
25m @ 1.09g/t Au1 from 18m; and
15m @ 1.48g/t Au2 from 20m
Significant potential to add resource ounces
to the Van Uden Project
OPEN DOWN
DIP, AND
ALONG
STRIKE
1. Refer to TG6 ASX Announcement dated 7 August 2025
2. Refer to TG6 ASX Announcement dated 25 November 2025
10
GOLD CITY PROSPECT – ENORMOUS UPSIDE
Untested gold in soil
anomalies
Expanded soil anomaly
N-E of historical
workings
New drilling defines
apparent plunge to the
N-E
Multiple lodes
intersected in most drill
holes
Gold mineralisation
open in all directions
Mineralisation controls to be
defined
Potential repetitions at depth
to be tested
11
LAKE JOHNSTON PROJECT – SIGNIFICANT HARD ROCK LITHIUM DEPOSIT
Burmeister Exploration Target Statement*
At 0.4% Li2O cutoff
The Exploration Target quantity and grade is conceptual in nature. There has
been insufficient exploration to estimate a Mineral Resource and it is uncertain if
further exploration will result in the estimation of a Mineral Resource. The Target
is based on the Company’s resource definition drilling undertaken since
discovery in October 2023. The current drill hole density (spacing between
holes) at Burmeister is not considered sufficient to determine a Mineral
Resource.
Best drill intercepts*:
23.5m @ 1.52% Li2O, from 127.4m
20m @ 1.38% Li2O, from 120m
20m @ 1.13% Li2O, from 129m
Metallurgy done – SC6 concentrate proven
* ASX announcement 1 May 2024
Tonnes Range
Low
Tonnes Range
High
Li2O Range
Low (%)
Li2O Range
High (%)
15.6 million 20.1 million 0.97 1.19
12
LAKE JOHNSTON PROJECT – UPSIDE
Jaegermeister – Emerging second
deposit of similar size to Burmeister
Open in all directions
Best drill intercepts*:
10m @ 1.19% Li2O, from 73.0m
6m @ 1.38% Li2O, from 76.0m
4m @ 1.51% Li2O, from 85.0m
Protecting IP for Hybrid Flowsheet
through Patent Application
* ASX announcement 9 August 2024
Aiming for Long Life Open
Pittable Stand Alone Project
13
NEXT STEPS – RESOURCE GROWTH AND PATHWAY TO PRODUCTION
NEAR-TERM OPPORTUNITIES – Low to no waste removal
Near-surface laterite resource 759Kt for 18,740oz Au1
Remnant Tasman in-pit 26,700 tonnes at 1.6g/t Au2
Historical Stockpiles – SMP approved
1. Refer to TG6 ASX Announcement dated 5 June 2025
2. Refer to TG6 ASX Announcement dated 21 August 2025
TASK Q4 CY2025 Q1 CY2026 Q2 CY2026 Q3 CY2026 Q4 CY2026
Stockpiles SMP Approved Done
Drilling Tasman Pit Done
Resource Drilling VU Completed RC Diamond Core Drilling Ongoing
Gold City Drilling Done New Targets and Expansion
Updated VU Resource First Update Second Update
Tasman Pit Mining Approvals Water Services Done
Laterite Opportunity HG Laterite Metallurgy Large Scale Exploitation
VU Pit Approvals Flora/Fauna Surveys Completing
VALUE PROPOSITION
- ENORMOUS UPSIDE POTENTIAL FOR BOTH GOLD AND LITHIUM GROWTH
14
Dual Commodity Exposure
Pathways to Production
Resource growth with ongoing
drilling
Well Funded
FOR MORE INFORMATION
David Selfe – CEO
Email: dselfe@tgmetals.com.au
Richard Bevan - Chairperson
Email: rbevan@tgmetals.com.au
15
APPENDICES – VAN UDEN MINERAL RESOURCE ESTIMATE
OPEN DOWN
DIP, AND
ALONG
STRIKE
Notes to Resource Table:
The MRE is estimated with all available drilling data as at 30 May 2025 and reported at a 0.35g/t Au cutoff.
MRE reported in ASX announcement 5 June 2025
The MRE is reported in accordance with the JORC Code 2012 Edition
Rounding may lead to minor apparent discrepancies
Share your feedback
Discover