Van Uden Gold Project MRE Conversion
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
RELEASED 5 JUNE 2025
Van Uden Gold Project MRE Conversion
Highlights
■ Previous 2004 JORC compliant Mineral Resource Estimate (MRE)
converted to 2012 JORC compliant MRE
■ MRE constrained by pit shell, confirming 2.5km continuous strike length
with total reportable resources at 6.35Mt @ 1.15 g/t Au for 227,140 oz
■ Anticipated growth in MRE driven by untested extensions and new
targets
■ Mining studies progressing on stockpiles and in-pit resources
■ Proximal to toll treatment facilities
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to release the 2012
JORC compliant MRE for the Van Uden Gold Project (Van Uden Gold or the Project) in WA.
TG Metals CEO, Mr. David Selfe stated;
“Updating the MRE to JORC 2012 compliance is a key milestone for the Van Uden Project. It
is a foundation for the commencement of the mining studies as we rapidly progress Van Uden
towards production, as well as a guide for future infill and extensional drilling. The new MRE
is an in-pit resource and we are confident of delivering future MRE growth from the drilling of
numerous targets identified outside the resource.
The drilling of the existing stockpiles, which are not included in this MRE, is progressing well
and we look forward to providing results as they come to hand.”
Mineral Resource Estimate for the Van Uden Gold Deposit - May 2025
Material
Indicated
Inferred
Total
Grade
Grade
Grade
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz) Tonnes
(Au g/t) Gold (Oz)
Tonnes
Laterite
234,000
0.9
6,940
525,000
0.7
11,800
759,000
0.76
18,740
Oxide
867,000
0.7
34,200 1,141,000
1.0
38,200 2,008,000
0.87
72,400
Transitional
291,000
1.1
10,700
770,000
1.1
26,500 1,061,000
1.10
37,200
Fresh
318,000
1.6
16,500 2,207,000
1.2
82,300 2,525,000
1.25
98,800
Total
1,710,000
1.0
68,340 4,643,000
1.2 158,800 6,353,000
1.15 227,140
Table 1: MRE – Van Uden Gold Deposit
The Mineral Resources statement conforms to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All
tonnages are dry metric tonnes. It has been reported at a cut-off grade of 0.35 g/t Au by area
within a A$5,000/oz Au optimised pit shell based on mining parameters and operating costs
typical for Australian open pit extraction deposits of a similar scale and geology. Minor
discrepancies may occur due to rounding of appropriate significant figures.
The resources comply with the Reasonable Prospects for Eventual Economic Extraction
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
(RPEEE), a key principle in mineral resource reporting that requires the qualified person to
demonstrate that a mineral deposit has the potential to be economically extracted in the future.
By applying the appropriate RPEEE the JORC 2012-compliant MRE will facilitate a smooth
transition to the anticipated update to the JORC Code expected by the end of 2025.
Van Uden Gold Deposit Discussion
The updated MRE shows the Van Uden gold deposit to be continuous for at least 2.5km.
Figure 1 below is an isometric view of the Van Uden deposit looking north. Of note is that the
optimised pit shell takes in the majority of the modelled mineralisation. Everything outside of
this shell is unclassified and not reported, however does present target areas for further infill
drilling to bring those areas up to JORC 2012 compliance standard. In addition, all
mineralisation on the down dip eastern side remains open.
Figure 1 – Isometric view looking north of the Van Uden block model and optimised shells
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
The recent drilling which was reported on 5th May 2025 in the Tasman Pit area extended the
modelled mineralisation to beyond 150m vertical depth. It is clear from the cross section
through the historic Tasman pit, Figure 2 below, that the optimised pit has further potential to
take in greater depths with deeper drilling.
Figure 2 – Cross Section of the Van Uden block model and optimised shells through Tasman Pit
A cross section through the historical Dieman pit highlights the extensive laterite available in
the MRE, Figure 3 below. This surface and near surface opportunity will be examined over
the coming months for treatment options.
Figure 3 – Cross Section of the Van Uden block model and optimised shells through Dieman Pit
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
Van Uden Gold Deposit JORC Code 2012 Supporting Information
Geology and Geological Interpretation
The Van Uden Project area is located within the Forrestania portion of the Southern CrossForrestania Greenstone Belt. This is a north-north-westerly trending crustal domain that
extends for over 300 km, from Carterton in the north to Hatters Hill in the south (Harvey 2001).
The Southern Cross Belt is considered to incorporate the greenstone rocks adjacent, and to
the north of, the Intrusive Parker Dome. The Forrestania Greenstone Belt is considered to
comprise the remainder of the Greenstones to the south of the Parker Dome.
The Forrestania Greenstone Belt contains two distinct geological packages; a younger maficultramafic suite intercalated with a sequence of immature clastic sediments (“Package 1”),
and an older mafic-ultramafic sequence (“Package 2”). Both packages are regionally folded
into a north-plunging synform with steep west, and shallow east dipping limbs (Harvey 2001).
This fold pattern produces three regionally recognisable zones; these being the Eastern,
Central and Western Domains.
The Basal rocks of the “Eastern Domain” comprise a thick sequence of tholeiitic basalts with
minor high-Mg basalt flows and exhalative sediment interflow horizons. These are overlain by
the 600m thick “Bounty Sequence” comprising a lower komatiitic high MgO olivine
mesocumulate, an upper komatiitic low MgO pyroxenite with locally developed gabbroic
differentiates and intercalated BIFs, and all overlain by high MgO basalts.
The Basal rocks of the “Western Domain” comprise a relatively thin sequence of clastic to
arenaceous metasedimants. They are overlain by a thick ultramafic sequence comprising a
lower komatiitic high MgO olivine orthocumulate, and an upper komatiitic low MgO pyroxenite
with locally developed gabbroic differentiates and intercalated interflow sediments. These are
overlain by a thick sequence of high MgO basalts with associated interflow sediments.
Thus both the Eastern and Western Domains are essentially similar in composition and
genetically related.
Between these two related Domains is the stratigraphically upper sequence of +1000m thick
pelitic sediments of the Central Domain. These sediments form the top of the Forrestania Belt
Sequence of greenstones and are dominantly pelitic and psammitic schists with minor iron
rich garnet bearing units, thin BIF lenses and bands of graphitic/carbonaceous schists.
Outcrops of these sediments is sparse and forms low quartz scree covered rises. Local
intense laterization, especially at the Domain contacts, has allowed the formation of hardcap
plateaus that appear as distinct topographic highs and “ridgelines”.
Major shear zones are recorded within the Forrestania Belt and separate the three domains.
The Mt Holland Shear defines the Central and Eastern Domain’s contact. Likewise, the Van
Uden Shear separates the Central and Western Domains. These converge in the southern
part of the Greenstone Belt roughly halfway between the Flying Fox mine and the Cosmic Boy
Mine and effectively pinch out the Central Domain. Additional shear zones are recorded as
both parallel and cross-cutting stratigraphy dominantly orientated north south; and north northwest to south south-east (Harvey 2001).
The Forrestania Greenstone Belt was metamorphosed to amphibolite grade facies under
static conditions with preservation of primary textures and structures. Localised zones of
annealed (retrograde) greenschist facies are seen in some areas. The belt is enclosed by
ovoid syngenetic granite-gneiss complexes, and their emplacement has folded the rocks
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
along anticlinal/synclinal axis that trend NNW. Some E-W compression is seen on the belt
margins adjacent to the ovoid granitic complexes due to emplacement “ballooning”. Numerous
roughly east-west striking Proterozoic dolerite dykes cross-cut the north trending granitegreenstones) (Harvey 2001). These are concentrated into a regular grouped spacing of
approximately 1.2km. They have a spatial association with gold mineralisation, but postdate
the main gold mineralisation timing, and may represent the major crustal features that created
these Mesothermal fluid pathways.
The Van Uden gold deposit covers a 2.5 km long section of the 54 km long Van Uden Shear
Zone. This shear zone is host to other notable nearby gold deposits including Teddy Bear to
the north and Bad Bat East to the south. The shear dips to the East at between 40 to 50
degrees.
Mineralisation
At Van Uden, gold mineralisation occurs in six historic localities now incorporated into a
continuous single zone. These localities from north to south are Dieman (pit) Heems, Kirk,
Piglet, Tasman (pit) and Zeeman. The intrusive Binneringie Dolerite crosscuts the greenstone
belt north of the Dieman area, see Figure 4 below.
Figure 4 – Van Uden deposit model and optimised shells
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
Mineralisation occurs at or peripheral to the Van Uden Shear, in both Mafic/Ultramafic rocks
of the Western Domain and finer grained metasediments of the Central Domain. Horizontal
faulting with 20-30m of sinistral offset is developed near surface and is especially evident in
the southern and northern parts of the Van Uden gold deposit. This flat faulting has allowed
for open space development along the Van Uden Shear and hosts the thickest zones of gold
mineralisation. Laterite development is strongest over the top of the flat zones where they
occur near current topographic surface, see Figure 5 below.
Figure 5 – Van Uden deposit model and optimised shells on regional geology
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
Three styles of gold mineralisation are recognised at Van Uden:
a)
Primary gold-sulphide mineralisation within quartz veining and associated alteration
within sediments of the Central Domain and Mafics of the Western Domain.
b)
Secondary oxide and transitional mineralisation with a very thin zone of gold depletion
seen in the pallid zone.
c)
Laterite mineralisation within residual pisolite rich gravels with minor induration of
ferricrete (and to a lesser degree calcrete).
Additionally, four structural styles to mineralisation in both Primary and Secondary settings
are identified:
1.
Van Uden Shear “Feeder Zone” style, which can be high grade and mostly between 2m
to 5 m thick
2.
Flat Fault Zone style, which can be between 2 m to 20 m thick.
3.
Open space sigmoidal dilation mineralisation developed above and below the Van Uden
Shear/Flat fault interface, and thickest with the sediments of the Central Domain and
dips to the east.
4.
Brecciated dilation zone mineralisation seen in the Tasman Pit area, developed west of
the Van Uden and dips to the west.
Logging and Sampling
Previous exploration parties have carried out a number of drilling programs and two small pits
have been excavated previously.
Historical exploration has been completed by Reynolds Australia, PacMin Mining Corporation,
Convergent Minerals, Viceroy Australia Pty Ltd, Forrestania Gold NL, Sons of Gwalia Limited,
St Barbara Mines Limited, Montague Resources Australia Pty Ltd, Kidman Resources Limited,
Tianye SXO Gold Mining Pty Ltd, and MH Gold Ltd.
All data has been obtained from WAMEX Open File reports.
•
•
Database included 4,829 drillholes, which comprises of:
o
1,321m of diamond drilling (DD);
o
50,620m of reverse circulation drilling (RC);
o
709m of aircore drilling (AC);
o
39,690m of rotary air blast drilling (RAB); and
o
3010m of BH “Unspecified Type”.
Data point locations:
o
Drill collars were surveyed with DGPS where available.
o
Local grid systems were converted to MGA Zone 50.
o
RL data sourced from topographic surveys.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
7
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
•
Subsampling and sample preparation is as follows:
o
RC samples were split using a riffle splitter.
o
DD samples sawn in half, with one half sent for analysis.
o
Samples dispatched to ALS or Yilgarn Assay Laboratory were split and
pulverized to <75μm prior to analysis.
o
No record of duplicate sampling in some historical reports.
Interpretation And Wireframing
Weathering surfaces and the limits of mineralisation shapes were provided by TG Metals.
These were imported to Leapfrog and applied in geological models that could be applied to
the estimate.
All drillholes have been used to determine the interpretation shapes.
Weathering/oxidation surfaces have been created at the base of the oxide zone and the base
of the transitional zone using the supplied drillhole database, using explicit wireframing in
Micromine software.
Mineralisation shapes were provided by TG Metals exploration manager Trevor Saul using
explicit wireframing in Micromine. The supplied wireframes were interpretated to the extents
of the mineralisation resulting in zones of internal lower grade and barren material. Mining
Plus used statistical analysis to determine appropriate cutoffs to generate internal subdomains to separate the barren/low grade and mineralised zones for estimation.
Nominally, a 0.3 g/t cut off was selected for the lower grade / waste material cutoff, and grades
between 0.7 and 0.9 g/t were used to delineate the high grade material. Indicator interpolants
in Leapfrog Geo software v2024.1 were used to create the internal wireframes to separate the
barren material out from the supplied lode wireframes.
Resource Estimation
A Kriging Neighbourhood Analysis (KNA) has been undertaken on gold in the Van Uden
mineralisation domain 132 in order to determine the optimal block size and estimation
parameters for the block model and estimation. Domain 132 was chosen based on being the
largest domain with the most samples available.
A range of block sizes have been tested, with the 12.5 m x 12.5 m x 5 m block size returning
the best result indicated by the optimal kriging efficiency, slope of regression and negative
weights. Other factors such as drill spacing is also considered where the closer spaced drilling
influences block sizes such as 10 x 10 m, which shows better results but is not indicative of
the majority of the project area.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
8
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
Following block size determination, a review of the number of informing samples was
completed. The kriging efficiency and slopes of regression flatten off at around 20 samples
with no real material change going higher. The percentage of negative weights also increases
significantly around 20 samples so this was chosen as the maximum number of samples.
Search ellipse distances have been tested at varying multiples and divisions of the variogram
range to determine the optimal search ellipse size.
The search size of 150 m x 45 m x 6 m (the variogram ranges) has been selected as the
search radii 132 with search passes increased by 0.5x, 1x and 2x for passes 1, 2 and 3, with
decreasing numbers of required and maximum samples. This search ellipse size has also
been selected based on consideration of the predominant drill spacing of 25 m x 25 m to
approximately 50 m x 50 m.
Block Modelling Estimation
The parent block size selected approximates half the dominant drill spacing within the deposit
and has been sub-celled to account for the variable thicknesses of the mineralised lodes.
Sub-blocking to 2.5 m by 2.5 m by 0.625 m has been utilised in order to accurately represent
the wireframe volumes.
The estimation has been completed using ordinary kriging at the parent block scale for the
mineralisation zones, so that all sub-blocks within a parent block have the same grade. While
all drill data was utilised to generate the interpretation wireframes, RAB, Blasthole and Air
Core drillholes have been omitted for estimation due to potential contamination and quality
issues.
The wireframes have been utilised to code the estimation domain (ESTDOM), weathering
state (REGOLITH) and mined status (MINED) into the block model.
Depletion for Mining
The block model has been depleted for mining, since the Tasman and Dieman deposits have
both been previously mined. In-situ blocks have been coded as mined=0. Areas of the block
model that have been mined or have waste dumps created, have been coded.
Previous mining has reported production of 136 Kt @ 2.54 g/t for 11,100 Ounces of gold at
an unknown mining cutoff. The current model reports slightly lower contained mineralisation
at 154 Kt @ 2.14 g/t for 10,700 Ounces of gold at a 1.2 g/t mining cutoff. The CP considers
1.2 g/t an appropriate cutoff for the mining method (small open pits), and the gold price and
mining costs of the time period of 1999 to 2000.
Resource Classification
Classification of the Van Uden MRE has been completed in accordance with the “Australasian
Code for Reporting of Mineral Resources and Ore Reserves” (the JORC Code as prepared
by the Joint Ore Reserve Committee of the AusIMM, AIG and MCA and updated in December
2012, (JORC., 2012)). All classifications and terminologies have been adhered to. All
directions and recommendations have been followed, in keeping with the spirit of the code.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
9
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
The categories of Mineral Resource as outlined by the code are as follows;
•
Measured - Tonnage, densities, shape, physical characteristics, grade and mineral
content can be estimated with a high level of confidence.
•
Indicated - Tonnage, densities, shape, physical characteristics, grade and mineral
content can be estimated with a reasonable level of confidence.
•
Inferred - Tonnage, grade, and mineral content can be estimated with a reduced level
of confidence.
The resource classification has been applied to the MRE based on the drillhole data spacing,
grade and geological continuity, and data integrity. The resource has been classified on the
following basis;
•
There are no Measured Mineral Resources for the Van Uden Deposits.
•
The Indicated Mineral Resource classification has been applied to those parts of each
lode where the drill intercept spacing approximates 10 m x 10 m to 20 m x 20 m, Slope
of Regression is nominally about 0.7, and is estimated on the first or second
interpolation pass. The majority of the domains containing Indicated Resources are
located within close proximity to the grade control drilling completed prior to 2000.
•
Inferred Mineral Resources have been defined by a nominal drill spacing of 20 m x 20
m or less, a Slope of Regression nominally 0.4 or higher, and have generally been
populated on the second or third interpolation. Many of the dip and strike extensions
for each lode have been classified as Inferred Mineral Resources.
•
Zones outside of the inferred criteria including zones further away than 60 metres from
existing drillholes and have Slope of Regression less than 0.4 have been left
unclassified.
Reasonable Prospect of Eventual Economic Extraction
In order to report a Mineral Resource that has Reasonable Prospects for Eventual Economic
Extraction (RPEEE), an open-pit optimisation has been undertaken using Whittle mining
software by applying price and cost assumptions.
A Contract Operator and Toll Treat scenario has been selected for the optimisation. A pitshell
has been generated in Whittle which has been used to report the Mineral Resource.
All blocks within the optimised pitshell have been coded by applying the shell to the RPEEE
field in the model.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
10
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
About The Van Uden Gold Project
The Van Uden Gold Project consists of four granted mining leases, three granted exploration
licences two miscellaneous licences (for haul roads) and two exploration licences that TG
Metals has applied for in its own right (100%), one has been granted, see Figure 6 below. The
Project lies to the west of the Mt Holland lithium mine, south of the operating Marvel Loch gold
Plant and southeast of the Edna May gold Plant.
Figure 6 – Location Map Van Uden Gold Project tenements
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
11
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium assets at
its 80% owned Van Uden Gold Project and wholly owned Lake Johnston Project in the stable jurisdiction
of Western Australia, see Figure 7. The Van Uden Gold Project contains past producing gold mines
and is in proximity to operating gold processing Plants. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium prospects.
Burmeister is in proximity to four lithium processing plants and undeveloped deposits.
Figure 7 – Location Map showing TG Metals’ Van Uden Gold Project (red) and Lake Johnston Lithium
projects (blue)
Authorised for release by TG Metals Board of Directors.
Contact
Mr David Selfe
Chief Executive Officer
Email: info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulous
ResolveIR
Email: evy@resolveir.com
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
12
ASX
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
Competent Person Statement
The information in this announcement that relates to the Mineral Resource Estimate Report has been
compiled by Mr Matthew Karl. Mr Karl is an employee of Mining Plus Pty Ltd and has acted as an
independent consultant on the report titled “MP13744 TG Metals Ltd – Van Uden - JORC Mineral
Resource Estimate Report – May 2025”. Mr Karl is a Member of the Australian Institute of Mining and
Metallurgy (AusIMM) and Australian Institute of Geoscientists (AIG) and has sufficient experience with
the style of mineralisation, deposit type under consideration and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Karl consents to the inclusion in
this report of the contained technical information relating the Mineral Resource Estimation in the form
and context in which it appears.
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy and an employee of TG Metals Limited. Mr
Selfe has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities that he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Selfe has consented to the inclusion in this report of matters based on their information
in the form and context in which it appears. Mr Selfe considers that the information in this announcement
is an accurate representation of the available data and studies for the Van Uden Gold Project.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forwardlooking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
13
ASX
ASX ANNOUNCEMENT
I
RELEASED 5 JUNE 2025
________________________________________________________________
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
14
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
•
• Drill type (eg core, reverse ci