HIGHLIGHTS
■ Outstanding Metallurgical testwork results for spodumene concentrate
production
■ Heavy Liquid Separation (HLS) concentrate grades up to 6.31% Li2O
■ Combined HLS and Flotation concentrate grades up to 5.74% Li2O and recovery
achieved 80.2%, proving a hybrid flowsheet suitable for Burmeister spodumene
mineralisation
■ Cash at bank of $5.3m at 31 December 2024
LAKE JOHNSTON PROJECT
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to report on its activities for the
period ended 31 December 2024 (Quarter), during which the Company continued to advance the
exploration and development of its 100% owned multi commodity Lake Johnston Project in WA, Figure
1.
Activities for the Quarter included completion of metallurgical testwork on Burmeister mineralised
pegmatite, from crushing through to flotation and spodumene concentrate production as announced to
the ASX on the 16th October 2024 and 19th December 2024. Excellent results were achieved, mapping
the way forward for a future hybrid process flowsheet for the development of the Burmeister and
Jaegermeister lithium deposits. Highlights include:
•
Ore sorting technology achieving an increase in Lithia head grade of 15-39% and iron rejection
of 65-70%, important for preconditioning the ore feed stream via basalt waste rock removal.
•
HLS concentrate grading up to 6.31% Li2O, necessary for the potential to generate a SC6
(+6.0% Li2O) spodumene product stream.
•
Flotation testwork on the fines component remaining after HLS application, returned
concentrate grades up to 5.68% Li2O.
•
Combined Ore Sorting-HLS-Flotation achieved concentrate grades between 5.28% and 5.74%
Li2O and Lithia recovery between 75.5% and 80.2%.
•
The Company’s cash position remains strong and is on target to achieve its exploration goals
as we move into 2025.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
1
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 1 – Simplified Geology with deposit and prospect locations and the main area of exploration focus
at Burmeister and Jaegermeister. Datum: Zone 51 (GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
2
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Metallurgical Testwork
During the Quarter, the Company completed sighter Metallurgical testwork on diamond drill core
acquired during the drilling campaigns on the Burmeister deposit since discovery on the 30th October
2023. The Company engaged Independent Metallurgical Operations Pty Ltd (IMO) based in Western
Australia, to assist in the development and support of sighter metallurgical testwork. This sighter
testwork was progressed at Metallurgy Pty Ltd a commercial laboratory located in Perth WA. The
results and testwork program were also overseen by an independent consultant Michael Rodriguez,
who has over 35 years of practical and technical experience in the mining, minerals processing,
hydrometallurgical and pyrometallurgical industries. This research and development testwork program
was developed to determine the response to commercially demonstrated hard rock lithium processing
methods available to produce a spodumene concentrate from pegmatite feedstock. The testwork was
designed with in field parameters in mind by including mining dilution material in the feedstock and
aiming to maximise recovery by employing multiple upgrading techniques. The processes performed
included ore sorting, HLS/DMS (Heavy Liquid / Dense Media Separation) and flotation with the use of
magnetic separation technology for the rejection of iron and gangue. During the course of the testwork
it was determined that it was not necessary to apply a mica rejection circuit due to the lack of micas
observed within the composite samples prepared from drilled core.
The testwork was completed using three composite samples prepared from diamond drill core which
included the addition of the forecast mine dilution, see Table 6 for composite sample details, Figure 4
shows the location of the drillholes that provided the testwork samples. The results of the testwork were
reported to the ASX on the 16th October 2024 and 19th December 2024.
The sighter testwork demonstrated that coarse and fine quality spodumene concentrate products at
commercially saleable Lithia grades can be produced via the application of a combination of ore sorting,
HLS/DMS technology complimented with the use of magnetic separation and flotation technology.
Crushing And Ore Sorting
The first stage of the testwork involved crushing the core samples, from Table 6, to 100% passing
40mm and including 10% of waste wall rock (Basalt) to simulate an actual run of mine (ROM) feed
including mining dilution. Mineralised composite samples were crushed and the -10mm size fraction
was screened off prior to feeding the ore sorter. The composite samples were passed through a Steinert
ore sorter utilising a combination of 3D Laser and XRT sensor technology targeting first pass impurity
containing basalt removal. Figure 2 below shows the Steinert ore sorter used in the testwork. Two feed
sizes were tested, -40mm - +25mm and -25mm - +10mm to determine optimal ore sorting feed size.
Composites size splits are as per Table 1 below expressed as weight and percentage of total composite
sample.
Table 1 – Ore Sorter feed composites – distribution by weight
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
3
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 2 – Steinert Ore Sorter used in the testwork
The ore sorter worked exceptionally well, separating Basalt (gangue) from the pegmatite (ore feed).
Removal of non-pegmatite (basalt waste) in-pit prior to the process plant is an important step in
controlling impurities, reduces transport and downstream processing costs. Furthermore, this has a net
positive impact on the overall carbon footprint. Based on the composite samples tested, the results in
Table 2 confirm the application of ore sorting technology producing consistent and reproducible results.
Table 2 – Ore Sorter results for the 3 composite samples.
* The recoveries quoted are for this stage of the process only and are not indicative overall Li 2O recoveries
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
4
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Table 2 shows the Ore Sorter results producing concentrates with a head grade increase to further
downstream processing. The unsorted -10mm fractions were recombined with the Ore Sorter
concentrates for the next stage HLS and DMS testwork. Lithia losses to the waste streams were
minimal, ranging from 3.8% to 5.2% whilst the mass rejection was 14.1% to 24.4% resulting in a
significant decrease in mass going forward in the process and consequent significant rejection of basalt
waste. Figure 3 shows typical ore sorter products produced.
Figure 3 – Typical ore sorter products, pegmatite on the left to ore feed and basalt, feldspars and
quartz on the right to waste. The photographs are of samples generated in-train and are therefore
incomplete. Assays of the final products for each composite sample run are shown in Table 2.
The ore sorting concentrate and fines products were then sent forward to the next stage of testwork –
Heavy Liquid Separation (HLS).
HLS And Flotation Testwork Results
Pegmatite ore feed concentrate generated from the Ore Sorting was treated in two streams according
to particle size. All concentrate was crushed to 100% passing 3.35mm with the coarse stream treated
with HLS technology and the fine stream (-3.35mm) treated with flotation technology.
HLS testwork “sinks” concentrate then had the application of dry magnetic separation technology
applied, which produced quality concentrate with a lithia grade ranging from 5.34% Li2O to 6.31% Li2O
from 3 drill core representative composite samples. This is deemed a salable product stream on its
own with the potential to produce a SC6 (6.0% Li2O spodumene) grade concentrate.
The fines component was deslimed and then magnetic separation applied prior to treatment with
flotation technology. The final product from the fines component created concentrates ranging from
4.73% Li2O to 5.68% Li2O. Further optimization is expected to improve grade and consistency however
a SC5.5 (5.5% Li2O spodumene) grade flotation concentrate is deemed achievable.
An overall combined coarse and fines concentrate was also calculated ranging between 5.28% Li 2O
and 5.74% Li2O with overall lithia recoveries ranging from 75.5% to 80.2%.
Tables 3, 4 and 5 below detail the concentrate and tailings grades and incremental recoveries from
each of the processes tested.
These results support the potential to achieve a SC6 concentrate utilising HLS processing technology
and achieve a combined HLS and Flotation concentrate of SC5.5 grade. Two streams provide future
marketing and operational flexibility.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
5
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Tables 3 to 5 – Summary cumulative results for 3 composite samples
Table 3 – Composite 1
Composite 1
Process Stage
Product Type
Mass
Lithia
Lithia
Rec %
Grade%
Rec %
Ore Sorter
Tailings
23.6%
0.18
3.8%
HLS
Tailings
34.7%
0.21
6.4%
Dry Magnetic Separation
(Coarse)
Coarse Concentrate
8.5%
5.85
43.8%
Tailings
2.2%
2.78
5.3%
Deslime
Tailings
0.6%
0.71
0.4%
Magnetic Separation (Fines)
Tailings
1.4%
0.60
0.8%
Fine Concentrate
9.0%
4.73
36.4%
Tailings
19.9%
0.19
3.2%
Overall Concentrate
17.5%
5.28
80.2%
Overall Tailings
82.5%
0.27
19.8%
Flotation
Overall Process
Table 4 – Composite 2
Composite 2
Process Stage
Product Type
Mass
Lithia
Lithia
Rec %
Grade%
Rec %
Ore Sorter
Tailings
14.1%
0.35
3.8%
HLS
Tailings
40.4%
0.20
7.0%
Dry Magnetic Separation
(Coarse)
Coarse Concentrate
8.0%
6.31
42.0%
Tailings
1.2%
2.51
2.5%
Deslime
Tailings
0.6%
0.91
0.4%
Magnetic Separation (Fines)
Tailings
1.0%
1.00
0.8%
Fine Concentrate
8.4%
5.21
36.6%
Tailings
26.3%
0.31
6.9%
Overall Concentrate
16.4%
5.74
78.6%
Overall Tailings
83.6%
0.31
21.4%
Flotation
Overall Process
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
6
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Table 5 – Composite 3
Composite 3
Process Stage
Product Type
Mass
Lithia
Lithia
Rec %
Grade%
Rec %
Ore Sorter
Tailings
24.4%
0.23
5.2%
HLS
Tailings
31.7%
0.20
6.2%
Dry Magnetic Separation
(Coarse)
Coarse Concentrate
5.6%
5.34
29.5%
Tailings
1.4%
1.21
1.7%
Deslime
Tailings
0.5%
0.84
0.4%
Magnetic Separation (Fines)
Tailings
1.9%
0.86
1.6%
Fine Concentrate
8.6%
5.68
46.1%
Tailings
25.9%
0.39
9.4%
Overall Concentrate
14.2%
5.55
75.5%
Overall Tailings
85.8%
0.30
24.5%
Flotation
Overall Process
Table 6 – Composites of Pegmatite and Basalt (dilution) taken from HQ diamond drill core
Comp
Hole ID
From
To
Interval
m
Receipt
Mass
kg
Total
Mass
kg
Total
Int
m
Total
Li2O
ppm
Total
Fe
%
m
m
1
TGRCD0009
TGRCD0032
132
86
141.3
99
9.3
13
37
89
126
22.3
11,046
2.5
2
TGRCD0024
TGRCD0033
201.5
137
222.2
150
20.7
13
139
89
228
33.7
13,103
1.8
3
TGRCD0037
TGRCD0043
117.3
138
132
154
14.7
16
114
109
223
30.7
10,678
2.2
Table 7 – Collar Surveys of Metallurgical Sample Drillholes
Hole ID
Easting
Northing
(GDA94z51) (GDA94z51)
RL
(m)
Azimuth
(deg)
Dip
(deg)
RC precollar
(m depth)
EOH
(m)
Sample Internal
From (m)
To (m) Width (m) Drill Type
TGRCD0009
284371
6399892
380
221.0
-60.0
132
156.30
132
141.3
9.3
HQ
TGRCD0024
284247
6400052
378
49.0
-60.6
120
300.50
201.5
222.2
13
HQ
TGRCD0032
284540
6400017
371
229.6
-60.9
50
108.00
86
99
20.7
HQ
TGRCD0033
284329
6400102
376
139.6
-60.5
81
192.40
137
150
13
HQ
TGRCD0037
283838
6400735
379
54.8
-60.5
80
201.50
117.3
132
14.7
HQ
TGRCD0043
284102
6400434
367
45.9
-59.8
78
201.45
138
154
16
HQ
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
7
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Figure 4 – Burmeister lithium pegmatite drilling showing DD holes used in the metallurgical testwork. Datum:
AMG Zone 51 (GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
8
DECEMBER 2024 QUARTERLY REPORT
_________________________________________________________________
ASX ANNOUNCEMENT
Lithium Drilling
During the Quarter, the Company conducted rehabilitation works on previous drilling sites and
preparation works for future drilling, both infill and extensional RC on the Burmeister lithium deposit
location and the Jaegermeister prospect. Further drilling is anticipated when market conditions allow.
BUSINESS DEVELOPMENT
During the Quarter, the Company applied for the extension of term for tenement E63/1961. This
extension was granted subsequent to the end of the Quarter for an additional 4 years. Additionally
subsequent to the end of the Quarter, the Company also applied for the extension of term for tenement
E63/1973. The Company awaits the outcome of this application.
The Company continuously assesses opportunities to grow the business and consolidate tenement
positions as they arise.
CORPORATE
TG Metals closed the Quarter with approximately A$5.3 million in cash. The Company’s quarterly
summary of financials is presented in the Appendix 5B attached.
The Company has 71,107,540 fully paid ordinary shares on issue.
ASX Disclosures
ASX Listing Rule 5.3.1: During the Quarter, the Company spent $430,000 on exploration activities,
associated predominantly with activities undertaken on the Lake Johnston Project.
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities
conducted during the Quarter.
ASX Listing Rule 5.3.5: Item 6.1 in Appendix 5B includes an amount of $56,812 as payment to related
parties, reflecting payments to directors including non-executive directors for fees, salaries and
consulting costs for the Quarter.
This announcement has been authorised by the Board of TG Metals Limited.
For further information visit www.tgmetals.com.au or contact:
Contact
Mr. David Selfe
Chief Executive Officer
TG Metals
info@tgmetals.com.au
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Investor Relations
Evy Litopoulos
Resolve IR
evy@resolveir.com
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
9
ASX ANNOUNCEMENT
DECEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing lithium, nickel and gold at
its wholly owned Lake Johnston Project in the stable jurisdiction of Western Australia. The Lake
Johnston Project, Figure 5, hosts the Burmeister high grade lithium deposit, Jaegermeister lithium
pegmatites and several surrounding lithium prospects. Burmeister is in proximity to four lithium
processing plants and undeveloped deposits.
Figure 5 – Lake Johnston Project Location. Simplified Geology with prospect locations Datum: Zone 51
(GDA94).
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
10
ASX ANNOUNCEMENT
DECEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is
a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that
is relevant to the style of mineralisation and type of deposit under consideration and to the activities
that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr
Selfe has consented to the inclusion in this presentation of matters based on their information in the
form and context in which it appears.
Information in this announcement that relates to metallurgical results, is based on information compiled
by Mr David Selfe and has been reviewed by Mr Michael Rodriguez who is a Fellow of the Australasian
Institute of Mining and Metallurgy. Mr Rodriguez has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activities that he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Metallurgical Results. Mr Rodriguez has consented to the inclusion in this report of matters based
on their information in the form and context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, and performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify
forward-looking statements. These statements include, but are not limited to statements regarding
future production, resources or reserves and exploration results. All such statements are subject to
certain risks and uncertainties, many of which are difficult to predict and generally beyond the control
of the Company, that could cause actual results to differ materially from those expressed in, or implied
or projected by, the forward-looking information and statements. These risks and uncertainties include,
but are not limited to: (i) those relating to the interpretation of drill results, the geology, grade and
continuity of mineral deposits and conclusions of economic evaluations, (ii) risks relating to possible
variations in reserves, grade, planned mining dilution and ore loss, or recovery rates and changes in
project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely
basis and on acceptable terms or delays in obtaining governmental approvals or in the completion of
development or construction activities, and (vi) other risks and uncertainties related to the Company’s
prospects, properties and business strategy. Our audience is cautioned not to place undue reliance
on these forward-looking statements that speak only as of the date hereof, and we do not undertake
any obligation to revise and disseminate forward-looking statements to reflect events or circumstances
after the date hereof, or to reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information
included in this ASX release, and the Company confirms that, to the best of its knowledge, all material
assumptions and technical parameters underpinning the exploration results in this release continue to
apply and have not materially changed.
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
11
ASX ANNOUNCEMENT
DECEMBER 2024 QUARTERLY REPORT
_______________________________________________________________
__
Tenement Schedule as at 31 December 2024
Tenement
Area
Grant Date
Expiry Date
E63/1960
6 BL
05/11/2019
04/11/2029
E63/1961
29 BL
05/11/2019
04/11/2029
E63/1973
26 BL
16/01/2020
15/01/2025**
E63/1983
7 BL
21/02/2020
20/02/2025
E63/1984
5 BL
04/08/2020
03/08/2025
E63/1997
37 BL
27/10/2020
26/10/2025
E63/2254
8 BL
20/07/2023
19/07/2028
E63/2315*
43 BL
Pending
N/A
E63/2324*
9 BL
Pending
N/A
E63/2349
20BL
02/02/2024
01/02/2029
E63/2433*
2 BL
Pending
N/A
E63/2434*
6 BL
Pending
N/A
E63/2488*
1BL
Pending
N/A
E63/2489*
1BL
Pending
N/A
E63/2490*
1BL
Pending
N/A
E63/2491*
1BL
Pending
N/A
P63/2201
176.52 HA
03/11/2020
02/11/2024
P63/2202
193.69 HA
16/01/2020
02/11/2024
Entity’s
Interest at
Quarter
End
Change in
Entity’s
interest
during
Quarter
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
100%
No change
Exploration
Licences
Prospecting
Licences
*Tenement Application
**Extension of Term Lodged
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3, 28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
12
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
TG Metals Limited
ABN
Quarter ended (“current quarter”)
40 644 621 830
31 December 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
-
(12)
(16)
(b) development
-
-
(c) production
-
-
(d) staff costs
(229)
(468)
(e) administration and corporate costs
(255)
(453)
-
-
74
189
(a) exploration & evaluation
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST Paid)
-
-
1.9
Net cash from / (used in) operating
activities
(422)
(748)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(4)
(12)
(418)
(1,968)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(422)
(1,980)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other – Lease payments
-
-
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
Current quarter
$A’000
Year to date (6
months)
$A’000
4.1
Cash and cash equivalents at beginning of
period
6,164
8,048
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(422)
(748)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(422)
(1,980)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date (6
months)
$A’000
-
-
5,320
5,320
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5,305
1,038
5.2
Call deposits
15
5,126
5.3
Bank overdrafts
-
-
5.4
Other – Term Deposits
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
5,320
6,164
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
57
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(422)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(418)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(840)
8.4
Cash and cash equivalents at quarter end (item 4.6)
5,320
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
5,320
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
6.33
-
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
21 January 2025
Authorised by: .........By the Board..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for
Share your feedback
Discover