Exceptional Metallurgical Recoveries Open up
Material Near Term Heap Leach Cashflow Opportunity
from Van Uden Gold Project
Highlights
TG Metals Limited (TG Metals or the Company) (ASX:TG6) is pleased to provide initial
results from column leach metallurgical testwork underway for the Laterite material of the Van
Uden Gold Project in Western Australia.
TG Metals CEO, Mr. David Selfe stated;
“These initial results from the column leach testwork are exceptional and give us a high level
of confidence of favourable outcomes for a heap leaching operation on over one million tonnes
of Laterite within the Van Uden gold deposit (see Table 1).
Achieving 88% gold extraction after 35 days is a remarkable result. The use of an on site heap
leaching technology to recover gold from the Laterite resource is a low risk option to monetise
■ Column leach testwork on Laterite gold mineralisation delivers
exceptional recoveries of 88% after a very short 35 day leaching period
■ These rapid leaching characteristics were achieved on all Laterite
samples tested providing confidence of metallurgical performance
across the mineralisation
■ Agglomeration achieved at a very coarse 25mm crush
■ These exceptional results provide a significant, near term cashflow
opportunity in treating near or at surface gold bearing Laterite via a
heap leach operation on site
■ Current Laterite Resource that could be initially utilized in the heap
leach operation is 1.05 Mt @ 0.52 g/t Au for 17,700 ounces*
■ The Company also expects 1.85 Mt @ 1.05 g/t au for 62,400 ounces** in
transition material may also be amenable to heap leach.
■ Engineering and design studies underway to assess financial metrics
■ With a simple ‘free dig’ mining to access ore, along with high recoveries
from a simple short leach, the Company expects a very low capital and
operating cost operation
■ Mining proposal to be lodged under the EMA rapid approval framework
■ The Company estimates study outcomes to be concluded in Q2 2026
and a Final Investment Decision to be made in Q3
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
2
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
the lower grade Laterite ores, enabling a more efficient exploitation of the entire mineral
resource at Van Uden.
The Laterite is at surface, so requires no pre-stripping, minimal handling and a potential onsite
facility means no transport costs. This delivers low mining costs, coupled with the low upfront
capital and operating costs associated with heap leach processing.
We also expect the transitional zones of the Van Uden resource will be amenable to the same
process and metallurgical testwork on this mineralisation type will be undertaken.
The final recoveries will be provided when the full leach cycle is completed, anticipated to be
another 3 weeks under leach. The metallurgical testwork will be used to design and engineer
suitable heap leach infrastructure for onsite installation and progress mining proposals.”
Gold Heap Leach Rationale
The Laterite resources at Van Uden are well suited to onsite heap leaching as evidenced by
the rapid gold recoveries seen in the testwork and the exceptional physical characteristics.
Being at surface and with no waste removal required for extraction, the Laterite presents a
low cost mining opportunity. Onsite processing eliminates trucking costs and milling costs
associated with toll milling and ore purchase to third party processing plants.
Whilst there is higher grade Laterite available at Van Uden such as the 12,496 tonnes @
2.55g/t Au identified in ASX release 21 August 2025 which is suitable to be toll milled offsite,
the majority of the Laterite resources are at a lower grade which is more suitable for onsite
heap leaching. The current Laterite resource for the Van Uden project has a high proportion
within the Indicated category available for mine design. Table 1 below summarises the
Laterite resource and Figure 2 shows the grade distribution of the Laterite resource.
Table 1: Van Uden Laterite Resource (Subset of the Van Uden MRE – see Table 5)
Material Indicated Inferred Total
Tonnes
Grade Gold
(oz) Tonnes
Grade Gold
(oz) Tonnes
Grade Gold
(oz)
(Au g/t) (Au g/t) (Au g/t)
Laterite 886,000 0.56 15,900 167,000 0.33 1,800 1,053,000 0.52 17,700
The heap leaching process also allows for much lower cut-off grades as the processing cost
is far less than that of a conventional carbon in leach (CIL) plant. Capital costs are also lower.
These low capital and operating costs combine to enable the exploitation of the entire Laterite
resource available. Whilst the full results from the column leach testwork are completing,
mining and processing studies have commenced to determine the optimal mining and pad
design parameters.
A focus on early cashflow, to capitalise on the rapid leaching characteristics, will be a key
feature of the mining and processing studies currently underway.
Rapid leaching times will enable turnover of leach pads in weeks rather than months. The
turnover time will dictate production rates.
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
3
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Existing Infrastructure
The Van Uden site has already established an all-weather haul road, water bore and storage
and site facilities. A Mining Proposal will be applied for to commence mining the Laterite,
construct heap leach pads, ponds, crushing and agglomeration facilities. The water
requirements should be satisfied by onsite extraction in place. It is anticipated that the Laterite
heap leach project will qualify as an Eligible Mining Activity (EMA) under the guidelines
introduced in September 2025 by the DMPE which will allow rapid approvals (target approval
46 days) for low-risk activities. Laterite resources are located on granted Mining Leases.
Additional Heap Leach Opportunities
The Van Uden resource contains a significant proportion of transition material which may be
suitable for the application of heap leach technology. The physical characteristics of transition
material lends itself to agglomeration more readily than oxide or fresh material types. The
Company intends to conduct heap leach testwork on transition material as soon as sufficient
sample for agglomeration and column leach testwork is available. As the transition material
sits below the oxide and above the fresh material in the resource, it would need to be accessed
as part of the larger ultimate pit mining scenario. Figure 1 shows the transition zone in the
northern part of the Van Uden resource. The current transition material defined is shown in
Table 2 below.
Table 2: Van Uden Transition Resource (Subset of the Van Uden MRE – see Table 5)
Figure 1 – Cross section showing the transition zone in the northern end of the Van Uden resource
Material
Grade Grade Grade
(Au g/t) (Au g/t) (Au g/t)
Transition 1,115,000 1.07 38,300 740,000 1.01 24,100 1,855,000 1.05 62,400
Gold (oz)
Indicated Inferred Total
Tonnes Gold (oz) Tonnes Gold (oz) Tonnes
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
4
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 2 – Location plan of the three Laterite samples and Laterite resource.
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
5
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Gold Leaching Testwork Overview
TG Metals has engaged Independent Metallurgical Operations Pty Ltd (IMO) based in
Western Australia, to conduct column leach metallurgical testwork on lateritic samples
recovered from previous mining stockpiles and historical surface excavations at the
Company’s Van Uden Gold project. The testwork is ongoing at Metallurgy Pty Ltd, a
commercial laboratory located in Perth, Western Australia. The results and testwork program
were overseen by independent consultant Michael Rodriguez.
This testwork is primarily to determine the amenability of the auriferous Laterite mineralisation
to conventional cyanide heap leach processing.
A total of three (3) composites were generated utilising samples taken from historical mine
workings which have exposed Laterite. Figure 2 shows the location of the samples and Table
3 lists the location coordinates.
Table 3 – Collar Locations of Metallurgical Samples
Sample ID Type Easting Northing Tenement No.
L01 Composite 749,968.22 6,439,909.94 M77/477
L02 Composite 750,264.15 6,439,464.67 M77/478
L03 Composite 749,503.00 6,440,375.34 M77/477
Each sample is a set of composite samples taken from exposures at historical mining
disturbances. Samples were selected based on lithology type, being pisolitic Laterite which
has been shown to have favourable physical properties for the application of heap leach
extraction methods.
These samples first underwent intermittent bottle roll (IBR) tests to determine initial suitability
to cyanide leaching under non-grind conditions, see Table 4 for these results.
Table 4 – IBR Results for Samples 1, 2 and 3
Composite
Leach Test # IBR-04 IBR-05 IBR-06 IBR-07 IBR-08 IBR-09 IBR-10 IBR-11 IBR-12
Crush Size mm 25 12.5 8 25 12.5 8 25 12.5 8
Calculated Ore Head Grade g/t 0.29 0.19 0.18 0.23 0.22 0.22 0.40 0.39 0.34
Assay Ore Head Grade g/t 0.15 0.15 0.15 0.21 0.21 0.21 0.36 0.36 0.36
Head SxS Ore Head Grade g/t 0.15 0.15 0.14 0.21 0.21 0.21 0.44 0.44 0.44
0 Hour Au Recovery % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
2 Hour Au Recovery % 10.5% 21.6% 27.5% 47.8% 49.3% 53.6% 10.0% 5.1% 5.8%
4 Hour Au Recovery % 21.0% 37.9% 33.1% 56.8% 58.6% 58.3% 12.6% 7.7% 14.6%
8 Hour Au Recovery % 24.6% 43.0% 49.5% 67.0% 67.8% 71.9% 12.7% 15.5% 23.5%
24 Hour Au Recovery % 35.2% 48.6% 60.4% 65.3% 68.1% 68.0% 27.8% 33.4% 46.8%
48 Hour Au Recovery % 49.2% 59.5% 60.9% 77.9% 81.6% 72.5% 35.5% 38.7% 61.6%
72 Hour Au Recovery % 42.7% 60.0% 66.7% 78.3% 82.0% 81.6% 43.2% 49.0% 62.1%
96 Hour Au Recovery % 48.0% 70.9% 77.8% 74.2% 88.6% 77.2% 46.0% 49.4% 62.5%
168 Hour Au Recovery % 61.9% 81.4% 88.5% 78.3% 91.0% 90.5% 53.8% 62.2% 72.6%
240 Hour Au Recovery % 91.3% 81.8% 88.7% 91.2% 91.7% 82.5% 61.8% 72.9% 68.0%
Leach Residue Grade g/t 0.02 0.03 0.02 0.02 0.02 0.04 0.15 0.10 0.11
Overall Gold Recovery g/t 0.26 0.15 0.16 0.21 0.20 0.18 0.24 0.28 0.26
Total NaCN Cons kg/t 1.19 0.91 1.16 1.27 1.19 1.17 0.72 0.89 0.97
Total Lime Cons kg/t 2.87 3.04 3.00 2.64 2.59 2.58 3.93 4.16 4.15
Dieman - Column 3
Laterite Pit - Column 1 Tasman - Column 2
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
6
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
The composite samples were then tested to determine optimal parameters for agglomeration.
The intermittent bottle roll testwork results are aligned to the heap leach results to date. An
important consideration when progressing column heap leaching testwork. The 25mm crush
size performed the best of the three crush sizes tested, being 25mm, 12.5mm and 8mm.
These results suggest the gold is primarily located outside of the pisolites rather than internal
which should aid cyanide penetration. This is also reinforced with a consistently low residue
grade which suggests that the majority of the gold is exposed to the cyanide leach agent. IBR
tests achieved +91% gold recovery on the preferred 25mm crush size.
Figure 3 below shows an example of Sample 2 agglomerates prior to and as loaded in the
test column.
Figure 3 - Column two leach agglomerates on the left and inside the column on the right
Prior to loading the columns, further tests were performed on the agglomerates to determine
indicative percolation rates. The results of these tests were used to determine the cement
addition rate for agglomeration and the initial cyanide solution feed rate. The agglomeration
was achieved with a 15kg/tonne cement addition to the 25mm crushed Laterite feed.
The column heights tested are at 4 metres and 2 metres and the column tests are performed
sequentially. Figure 4 shows columns one and two (both 4m in height) and column 3 (2m in
height). The third, 2 metre high column will test for variation in leach kinetics with height and
also for visual observations within the column, as the 2m column is a clear tube.
All columns are currently under leach, when recoveries of gold slow sufficiently to determine
completion, the leaching will terminate and the agglomerate residue will be analysed for final
recoveries.
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
7
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
To determine ongoing recoveries, carbon is added to the recovered leach solution weekly to
absorb the gold in solution (carbon loading). It is then removed for assay and initial
determination of leach kinetics.
Figure 4 - Columns One, Two and Three Under Leach
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
8
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Key initial findings are that only 2.94% slumping has been observed in column one, 13.9% in
column two and 0.77% in column three. The leach kinetics are rapid in the initial time phases,
achieving 88.0% recovery in column two after 35 days and 67.7% recovery in column one
after 42 days and 26.5% recovery in column three after 10 days following carbon loading. All
columns remain under leach and are showing continuing gold extractions. The intended full
leach time was up to 90 days for each column, however all will likely terminate early due to
the rapid extractions seen so far.
At the end of this cycle the residue will be assayed and a final head grade and recovery
calculated. Results may alter slightly from these preliminary results however rapid leaching
and recovery is likely to remain evident. In addition, leachate addition rates, reagents use and
water use will be calculated and used to determine optimum leach pad configurations and
operational parameters for a Laterite heap leach operation on site. Figures 5, 6 and 7 below
show the graphical results to date.
Figure 5 - Leaching Times for Column One Leach Tests
ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
9
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Figure 6 - Leaching Times for Column Two Leach Tests
Figure 7 - Leaching Times for Column Three Leach Tests
10
ASX ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Next Steps
• All three Columns under leach will progress and be monitored and recorded up to a
full leach cycle.
• Commence application for a Mining Proposal to encompass Laterite mining and heap
leach pads and facilities. Final pad design parameters will be determined from the full
column leach test results which will be available at the end of the full leach cycle.
• The full metallurgical report will be made available to potential heap leach plant
suppliers.
• Further optimisation testwork is planned to test the Laterite for improvements in
reagent use and operating cost reductions via research and development initiatives.
• First stage grade control drilling of the Laterite will commence upon staged pit designs
being finalised.
• Column leach testwork on other mineralisation types at Van Uden to also commence.
About the Van Uden Resource
The Van Uden gold MRE was updated earlier this month, increasing the Indicated category
by more than 120%. This has allowed progression of mining and processing studies focused
on utilising the Indicated resources in the near term. The surface Laterite is one component
of this and the most immediate potential, however further Indicated resources deeper in the
profile may also lend themselves to Heap Leach processing technology. The updated MRE
below in Table 5 shows the current resource status:
Table 5: MRE – Van Uden Gold Deposit
NOTES: The Mineral Resources statement conforms to the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes.
The laterite portion of the mineralisation has been reported at a cut-off grade of 0.10 g/t Au by area within a
A$6,000/oz Au optimised pit shell. All other material types are reported at a cut-off grade of 0.30 g/t Au by area
within a A$6,000/oz Au optimised pit shell based on mining parameters and operating costs typical for Australian
open pit extraction deposits of a similar scale and geology.
Minor discrepancies may occur due to rounding of appropriate significant figures. The resources comply with the
Reasonable Prospects for Eventual Economic Extraction (RPEEE), a key principle in mineral resource reporting
that requires the competent person to demonstrate that a mineral deposit has the potential to be economically
extracted in the future.
Material
Grade Grade Grade
(Au g/t) (Au g/t) (Au g/t)
Laterite 886,000 0.56 15,900 167,000 0.33 1,800 1,053,000 0.52 17,700
Oxide 1,976,000 1.15 73,300 414,000 0.91 12,100 2,390,000 1.11 85,400
Transition 1,115,000 1.07 38,300 740,000 1.01 24,100 1,855,000 1.05 62,400
Fresh 580,000 1.35 25,100 2,057,000 1.21 80,200 2,637,000 1.24 105,300
Total 4,557,000 1.04 152,600 3,378,000 1.09 118,200 7,935,000 1.06 270,800
Gold (oz)
Indicated Inferred Total
Mineral Resource Estimate Van Uden Gold Deposit - April 2026
Tonnes Gold (oz) Tonnes Gold (oz) Tonnes
11
ASX ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
About TG Metals
TG Metals is an ASX listed company focused on exploring and developing gold and lithium
assets at its wholly owned Lake Johnston Project and 80% owned Van Uden Gold Project in
the stable jurisdiction of Western Australia. The Lake Johnston Project hosts the Burmeister
high grade lithium deposit, Jaegermeister lithium pegmatites and several surrounding lithium
prospects. Burmeister is in proximity to four lithium processing plants and undeveloped
deposits. The Van Uden Gold Project contains past producing gold mines and is in proximity
to operating gold processing Plants (Figure 8).
Authorised for release by TG Metals Board of Directors.
Contact Investor Relations
Mr David Selfe Evy Litopoulous
Chief Executive Officer ResolveIR
Email: info@tgmetals.com.au Email: evy@resolveir.com
Figure 8 – Location Map showing TG Metals’ Van Uden Gold Project
12
ASX ASX ANNOUNCEMENT I RELEASED 30 APRIL 2026
________________________________________________________________
TG METALS LTD
ASX TG6
ABN 40 644 621 830
Level 2, Suite 3
28 Ord Street
West Perth WA 6005
T: +61 8 6211 5099
W: www.tgmetals.com.au
Competent Person Statement
Information in this announcement that relates to exploration results, exploration strategy, exploration
targets, geology, drilling and mineralisation is based on information compiled by Mr David Selfe who is a
Fellow of the Australasian Institute of Mining and Metallurgy. Mr Selfe has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activities that
he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Selfe has
consented to the inclusion in this report of matters based on their information in the form and context in
which it appears.
Information in this announcement that relates to metallurgical results, is based on information compiled
by Mr David Selfe and has been reviewed by Mr Michael Rodriguez who is a Fellow of the Australasian
Institute of Mining and Metallurgy. Mr Rodriguez has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activities that he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Metallurgical Results. Mr Rodriguez has consented to the inclusion in this report of matters based on
their information in the form and context in which it appears.
Forward Looking Statements
This announcement may contain certain statements that may constitute “forward looking statements”.
Such statements are only predictions and are subject to inherent risks and uncertainties, which could
cause actual values, results, performance achievements to differ materially from those expressed,
implied or projected in any forward looking statements.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-
looking statements. These statements include, but are not limited to statements regarding future
production, resources or reserves and exploration results. All such statements are subject to certain risks
and uncertainties, many of which are difficult to predict and generally beyond the control of the Company,
that could cause actual results to differ materially from those expressed in, or implied or projected by,
the forward-looking information and statements. These risks and uncertainties include, but are not limited
to: (i) those relating to the interpretation of drill results, the geology, grade and continuity of mineral
deposits and conclusions of economic evaluations, (ii) risks relating to possible variations in reserves,
grade, planned mining dilution and ore loss, or recovery rates and changes in project parameters as
plans continue to be refined, (iii) the potential for delays in exploration or development activities or the
completion of feasibility studies, (iv) risks related to commodity price and foreign exchange rate
fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis and on acceptable
terms or delays in obtaining governmental approvals or in the completion of development or construction
activities, and (vi) other risks and uncertainties related to the Company’s prospects, properties and
business strategy. Our audience is cautioned not to place undue reliance on these forward-looking
statements that speak only as of the date hereof, and we do not undertake any obligation to revise and
disseminate forward-looking statements to reflect events or circumstances after the date hereof, or to
reflect the occurrence of or non-occurrence of any events.
The Company believes that it has a reasonable basis for making the forward-looking Statements in the
presentation based on the information contained in this and previous ASX announcements.
The Company is not aware of any new information or data that materially affects the information included
in this ASX release, and the Company confirms that, to the best of its knowledge, all material assumptions
and technical parameters underpinning the exploration results in this release continue to apply and have
not materially changed.
1
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Bulk samples were collected from laterite material exposed in
historical workings and stockpiles within the Van Uden Project.
Sampling comprised multiple grab samples collected across
exposed pisolitic laterite zones. These were composited to
generate bulk samples of sufficient mass for metallurgical testwork.
In selected areas, sampling was undertaken proximal to known
mineralisation to ensure adequate gold tenor for metallurgical
assessment.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• No drilling was undertaken for this metallurgical testwork. Bulk
samples were obtained from surface exposures and historical
workings.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Not applicable.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
• Not applicable.
2
Criteria JORC Code explanation Commentary
studies.
•
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Sub-sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• Bulk samples recovered from 3 stockpiled mineralised ore were
received, and homogenised. Each composite sample was staged
crushed to 100% passing 25mm. Homogenised sub-samples were
split out to produce 10kg, 20kg and 220kg charges.
• The 20kg and 10kg homogenised composite sub-samples were
crushed to 12.5mm and 8mm respectively in preparation for
downstream testwork including intermittent bottle roll and column
leach testwork.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• Metallurgical testwork including intermittent bottle roll (IBR) and
column leach tests was managed by Independent Metallurgical
Operations Pty Ltd (IMO) staff, at Metallurgy Pty Ltd a commercial
laboratory located in Western Australia.
• A sizing analysis was completed on composite sub-samples.
• All composite samples prepared for downstream testwork had ICP
OES analysis for 42 elements completed and gold assays were
determined using standard fire assay methods.
• Raw water was recovered from the mine stie, assayed and used for
all subsequent testwork.
• Samples were recovered from the IBR tests and columns to obtain
kinetic time vs extraction curves. IBR and column testwork was
completed in parallel to obtain “read across” information.
• Kappes drawdown tests were applied to establish optimum
agglomeration operating conditions.
3
Criteria JORC Code explanation Commentary
• 4m columns were predominantly used to reflect the forecast heap
leach bench heights. A “clear” 2m column was used to observe the
flow characteristics and for comparison in the leach cycle between a
4m column and a 2m column.
• Metallurgical recoveries were calculated from solution assays and
carbon loading estimates. Final recoveries will be reconciled with
residues